Columbia Basin Hydropower; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process, 61674 [2016-21420]

Download as PDF 61674 Federal Register / Vol. 81, No. 173 / Wednesday, September 7, 2016 / Notices and Development (OECD) and developed by participating countries with the support of the OECD. U.S. participated in the PIAAC Main Study data collection in 2012, conducted a national supplement in 2014, and in this submission requests to conduct the PIAAC 2017 National Supplement data collection from February to September 2017 with a nationally representative sample of 3,800 adults ages 16–74, in a new sample of 80 primary sampling units (PSUs). Dated: August 31, 2016. Kate Mullan, Acting Director, Information Collection Clearance Division, Office of the Chief Privacy Officer, Office of Management. [FR Doc. 2016–21378 Filed 9–6–16; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Notice of Intent To Prepare a Supplemental Environmental Impact Statement for Disposition of Depleted Uranium Oxide Conversion Product Generated From DOE’s Inventory of Depleted Uranium Hexafluoride; Correction U.S. Department of Energy. Notice of intent; correction. AGENCY: ACTION: The Department of the Energy (DOE) published a document in the Federal Register (81 FR 58921) on August 26, 2016, announcing a Notice of Intent to Prepare a Supplemental Environmental Impact Statement for Disposition of Depleted Uranium Oxide Conversion Product Generated from DOE’s Inventory of Depleted Uranium Hexafluoride. The document contained an error regarding the agency that granted the amendment to the Waste Control Specialists facility near Andrews, Texas, to allow disposal of depleted uranium. This document corrects that error. FOR FURTHER INFORMATION CONTACT: For further information on DOE’s DUF6 long-term management and disposal program, please contact Ms. Jaffet Ferrer-Torres, National Environmental Policy Act (NEPA) Document Manager, Office of Environmental Management, U.S. Department of Energy, EM–4.22, 1000 Independence Avenue SW., Washington, DC 20585. mstockstill on DSK3G9T082PROD with NOTICES SUMMARY: Correction In the Federal Register (81 FR 58921) of August 26, 2016, FR Doc. 2016– 20501, on page 58922, third column, first paragraph, the first sentence is corrected to read: ‘‘In August 2014, the WCS facility near Andrews, Texas, was VerDate Sep<11>2014 17:30 Sep 06, 2016 Jkt 238001 granted a license amendment by the Texas Commission on Environmental Quality that would allow disposal of large quantities of depleted uranium.’’ Issued in Washington, DC, on August 31, 2016. Mark Senderling, Acting Associate Principal Deputy Assistant Secretary for Regulatory and Policy Affairs. [FR Doc. 2016–21428 Filed 9–6–16; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14329–002] Columbia Basin Hydropower; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 14329–002. c. Date Filed: June 27, 2016. d. Submitted By: Columbia Basin Hydropower. e. Name of Project: Banks Lake Pumped Storage Project. f. Location: On Banks Lake and Franklin D. Roosevelt Lake, in Grant and Douglas Counties, Washington. The project occupies about 65 acres of United States lands administered by Bureau of Reclamation. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Tim Culbertson, Columbia Basin Hydropower, P.O. Box 219, Ephrata, WA 98823; (509) 754–2227; email: TCulbertson@cbhydropower.org. i. FERC Contact: Karen Sughrue at (202) 502–8556; or email at karen.sughrue@ferc.gov. j. Columbia Basin Hydropower filed its request to use the Traditional Licensing Process on June 27, 2016. Columbia Basin Hydropower provided public notice of its request on August 4, 2016. In a letter dated August 31, 2016, the Director of the Division of Hydropower Licensing approved Columbia Basin Hydropower’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the Washington State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Columbia Basin Hydropower as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. Columbia Basin Hydropower filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: August 31, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–21420 Filed 9–6–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–2509–000] Rutherford Farm, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding Rutherford Farm, LLC’s application for market- E:\FR\FM\07SEN1.SGM 07SEN1

Agencies

[Federal Register Volume 81, Number 173 (Wednesday, September 7, 2016)]
[Notices]
[Page 61674]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-21420]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14329-002]


Columbia Basin Hydropower; Notice of Intent To File License 
Application, Filing of Pre-Application Document, Approving Use of the 
Traditional Licensing Process

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 14329-002.
    c. Date Filed: June 27, 2016.
    d. Submitted By: Columbia Basin Hydropower.
    e. Name of Project: Banks Lake Pumped Storage Project.
    f. Location: On Banks Lake and Franklin D. Roosevelt Lake, in Grant 
and Douglas Counties, Washington. The project occupies about 65 acres 
of United States lands administered by Bureau of Reclamation.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: Tim Culbertson, Columbia Basin 
Hydropower, P.O. Box 219, Ephrata, WA 98823; (509) 754-2227; email: 
TCulbertson@cbhydropower.org.
    i. FERC Contact: Karen Sughrue at (202) 502-8556; or email at 
karen.sughrue@ferc.gov.
    j. Columbia Basin Hydropower filed its request to use the 
Traditional Licensing Process on June 27, 2016. Columbia Basin 
Hydropower provided public notice of its request on August 4, 2016. In 
a letter dated August 31, 2016, the Director of the Division of 
Hydropower Licensing approved Columbia Basin Hydropower's request to 
use the Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 
7 of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920. We are also initiating 
consultation with the Washington State Historic Preservation Officer, 
as required by section 106, National Historic Preservation Act, and the 
implementing regulations of the Advisory Council on Historic 
Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Columbia Basin Hydropower 
as the Commission's non-federal representative for carrying out 
informal consultation pursuant to section 7 of the Endangered Species 
Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and 
Management Act; and consultation pursuant to section 106 of the 
National Historic Preservation Act.
    m. Columbia Basin Hydropower filed a Pre-Application Document (PAD; 
including a proposed process plan and schedule) with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: August 31, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-21420 Filed 9-6-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.