Virginia Electric and Power Company v. PJM Interconnection, L.L.C. PJM Settlement, Inc.; Notice of Complaint, 61676-61677 [2016-21417]
Download as PDF
mstockstill on DSK3G9T082PROD with NOTICES
61676
Federal Register / Vol. 81, No. 173 / Wednesday, September 7, 2016 / Notices
Comments Due: 5 p.m. ET 9/20/16.
Docket Numbers: ER16–1255–001.
Applicants: Antelope Big Sky Ranch
LLC.
Description: Compliance filing:
Antelope Big Sky Ranch LLC MBR
Tariff to be effective 5/21/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5158.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2307–001.
Applicants: Vista Energy Marketing,
L.P.
Description: Tariff Amendment:
Amended Vista Energy MBR Filing to be
effective 10/1/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5206.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2411–001.
Applicants: Luning Energy Holdings
LLC.
Description: Second Supplement to
August 12, 2016 Luning Energy
Holdings LLC tariff filing.
Filed Date: 8/30/16.
Accession Number: 20160830–5277.
Comments Due: 5 p.m. ET 9/20/16.
Docket Numbers: ER16–2412–001.
Applicants: Luning Energy LLC.
Description: Second Supplement to
August 12, 2016 Luning Energy LLC
tariff filing.
Filed Date: 8/30/16.
Accession Number: 20160830–5280.
Comments Due: 5 p.m. ET 9/20/16.
Docket Numbers: ER16–2512–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo-WAPA-Carey SS BA Mtr Install
Agrmt to be effective 10/31/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5063.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2513–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3246
Tenaska Power and Montana-Dakota
Utilities Att AO to be effective 8/1/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5065.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2514–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
OATT Schedules 4 & 9 Revisions to be
effective 12/1/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5139.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2515–000.
Applicants: Black River
Hydroelectric, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Order No. 816
VerDate Sep<11>2014
17:30 Sep 06, 2016
Jkt 238001
Compliance Filing to be effective 9/1/
2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5157.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2516–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 284—ANPP Delaney
Interconnection Agreement to be
effective 10/31/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5174.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2517–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Letter Agreement ACES Project to be
effective 9/1/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5201.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2518–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
OATT Revisions re: Earlier Queue
Submittal to be effective 10/31/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5256.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2519–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2016–08–31—Posting of Day-Ahead
Market Ex Post Prices to be effective
9/1/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5270.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2520–000.
Applicants: Grand View PV Solar
Two LLC.
Description: Baseline eTariff Filing:
Grand View Market-Based Rate
Application to be effective 10/3/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5307.
Comments Due: 5 p.m. ET 9/21/16.
Docket Numbers: ER16–2521–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Entergy Services, Inc.
Description: § 205(d) Rate Filing:
2016–08–31—SA 2937 Tennessee
Valley-NRG-Entergy MS C&P Agreement
to be effective 8/24/2016.
Filed Date: 8/31/16.
Accession Number: 20160831–5315.
Comments Due: 5 p.m. ET 9/21/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 31, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–21442 Filed 9–6–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL16–109–000]
Virginia Electric and Power Company
v. PJM Interconnection, L.L.C. PJM
Settlement, Inc.; Notice of Complaint
Take notice that on August 29, 2016,
pursuant to sections 206 and 306 of the
Federal Power Act, 16 U.S.C. 824e and
825e (2012), and Rules 206 and
207(a)(5) of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
385.206 and 207(a)(5) (2016), Dominion
Resources Services, Inc. (Dominion) on
behalf of Virginia Electric and Power
Company (Complainant) filed a formal
complaint against PJM Interconnection
L.L.C. and PJM Settlement, Inc.
(Respondents) alleging that Respondents
violated its Open Access Transmission
Tariff and Amended and Restated
Operating Agreement by denying
Dominion’s request for a fuel cost
adjustment resulting from the need to
run Ladysmith Power Station Units 2–
5 on back-up fuel oil rather than less
expensive natural gas for reliability in
real-time, all as more fully explained in
the complaint.
Dominion certifies that copies of the
complaint were served on the contacts
for Respondent listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
E:\FR\FM\07SEN1.SGM
07SEN1
Federal Register / Vol. 81, No. 173 / Wednesday, September 7, 2016 / Notices
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on September 19, 2016.
Dated: August 30, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–21417 Filed 9–6–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF15–25–000]
mstockstill on DSK3G9T082PROD with NOTICES
Freeport LNG Development, L.P.;
Supplemental Notice of Intent To
Prepare an Environmental Assessment
for the Planned Freeport LNG Train 4
Project and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the expanded Freeport LNG Train 4
Project (Project) involving construction
and operation of facilities by Freeport
LNG Development, L.P. (Freeport LNG)
VerDate Sep<11>2014
17:30 Sep 06, 2016
Jkt 238001
in Brazoria County, Texas. The
Commission will use this EA in its
decision-making process to determine
whether the planned project is in the
public interest.
We 1 are issuing this supplemental
notice to inform the public of changes
to the originally proposed Project.
Freeport LNG has modified the planned
Project by deleting the nonjurisdictional feed-gas pipeline
previously planned to provide gas to the
Liquefaction Plant on Quintana Island.
To replace the feed gas, Freeport LNG
plans to construct a FERC-jurisdictional
pipeline extending from the meter
station at Stratton Ridge to the
Pretreatment Plant on Levee Road/State
Road 690 and then to the Liquefaction
Plant on Quintana Island. The
Pretreatment Plant would be expanded
to handle the additional gas processing.
The comment period for the original
scoping notice of the Project was from
August 19, 2015 to September 18, 2015.
This supplemental notice announces the
opening of an additional scoping period
the Commission will use to gather input
from the new landowners potentially
affected by changed to the planned
Project, and inform interested agencies
of the changes
As the modifications would affect
new landowners; therefore, the
Commission is issuing this
supplemental notice to provide these
new landowners an opportunity to
comment on the Project. You can access
detailed mapping of the modifications
to the proposed pipeline route on the
Commission’s Web site (www.ferc.gov)
using eLibrary. For instructions on
connecting to eLibrary, refer to the last
page of this notice.
Comments submitted during the
original comment period have been
made part of the docket and do not need
to be resubmitted.
You can make a difference by
providing us with your specific
comments or concerns about the Project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, comments may be submitted
in writing as described in the public
participation section of this notice.
Please note that comments on this
supplemental notice should be filed
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
61677
with the Commission by October 3,
2016.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (www.ferc.gov). This
fact sheet addresses a number of
typically asked questions and how to
participate in the Commission’s
proceedings.
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has expert staff
available to assist you at (202) 502–8258
or efiling@ferc.gov. Please carefully
follow these instructions so that your
comments are properly recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’ as
the filing type; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (PF15–25–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Room 1A, Washington, DC 20426.
Summary of the Planned Project
Freeport LNG intends to add a fourth
liquefaction unit (Train 4), a supply
pipeline, and associated infrastructure
and utilities to Freeport LNG’s natural
gas Liquefaction Plant on Quintana
Island in Brazoria County, Texas
(Appendix 1, Figure 1). The Project
would be located adjacent to the
facilities authorized and currently under
construction for the Phase II
E:\FR\FM\07SEN1.SGM
07SEN1
Agencies
[Federal Register Volume 81, Number 173 (Wednesday, September 7, 2016)]
[Notices]
[Pages 61676-61677]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-21417]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL16-109-000]
Virginia Electric and Power Company v. PJM Interconnection,
L.L.C. PJM Settlement, Inc.; Notice of Complaint
Take notice that on August 29, 2016, pursuant to sections 206 and
306 of the Federal Power Act, 16 U.S.C. 824e and 825e (2012), and Rules
206 and 207(a)(5) of the Federal Energy Regulatory Commission's
(Commission) Rules of Practice and Procedure, 18 CFR 385.206 and
207(a)(5) (2016), Dominion Resources Services, Inc. (Dominion) on
behalf of Virginia Electric and Power Company (Complainant) filed a
formal complaint against PJM Interconnection L.L.C. and PJM Settlement,
Inc. (Respondents) alleging that Respondents violated its Open Access
Transmission Tariff and Amended and Restated Operating Agreement by
denying Dominion's request for a fuel cost adjustment resulting from
the need to run Ladysmith Power Station Units 2-5 on back-up fuel oil
rather than less expensive natural gas for reliability in real-time,
all as more fully explained in the complaint.
Dominion certifies that copies of the complaint were served on the
contacts for Respondent listed on the Commission's list of Corporate
Officials.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and
[[Page 61677]]
385.214). Protests will be considered by the Commission in determining
the appropriate action to be taken, but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a notice of intervention or motion to intervene, as
appropriate. The Respondent's answer and all interventions, or protests
must be filed on or before the comment date. The Respondent's answer,
motions to intervene, and protests must be served on the Complainant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on September 19, 2016.
Dated: August 30, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-21417 Filed 9-6-16; 8:45 am]
BILLING CODE 6717-01-P