Climax Manufacturing Company; Notice of Application Accepted for Filing, Soliciting Comments, Protests and Motions To Intervene, 59993 [2016-20980]
Download as PDF
Federal Register / Vol. 81, No. 169 / Wednesday, August 31, 2016 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10887–027]
mstockstill on DSK3G9T082PROD with NOTICES
Climax Manufacturing Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Protests
and Motions To Intervene
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Extension of
License Term.
b. Project No.: P–10887–027.
c. Date Filed: August 4, 2016.
d. Licensee: Climax Manufacturing
Company.
e. Name and Location of Project:
Carthage Paper Makers Hydroelectric
Project, located on the Black River in
Jefferson and Lewis counties, New York.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Licensee Contact Information: Mr.
Fred Goutremout, 30 Champion Street,
Carthage, New York 13619, Phone: (315)
493–5518.
h. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, Ashish.Desai@ferc.gov.
i. Deadline for filing comments,
motions to intervene and protests, is 30
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, and
recommendations, using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–10887–027.
j. Description of Proceeding: The
licensee, Climax Manufacturing
Company, requests the Commission
extend the term of the license by five
years, from October 31, 2021 to October
31, 2026. The licensee received a 20year license for the project on October
22, 1991. The licensee states that in
order to facilitate a basin-wide
relicensing approach with several other
VerDate Sep<11>2014
21:59 Aug 30, 2016
Jkt 238001
projects, it needs the five-year extension
for the license term. The licensee states
that it has consulted with the U.S. Fish
and Wildlife Service (FWS) and New
York State Department of
Environmental Conservation (DEC), and
coordinated with other licensees to
develop a framework for relicensing.
The licensee states that the FWS and the
New York DEC support the process.
k. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–10887–027)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
59993
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: August 25, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–20980 Filed 8–30–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2101–127]
Sacramento Municipal Utility District;
Notice of Application Accepted for
Filing, Soliciting Comments, Protests
and Motions To Intervene
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of License.
b. Project No.: 2101–127.
c. Date Filed: May 25, 2016.
d. Applicant: Sacramento Municipal
Utility District.
e. Name of Project: Upper American
River Hydroelectric Project.
f. Location: The project is located on
Silver Creek and the Rubicon and South
Fork American rivers in El Dorado and
Sacramento counties, California. The
project occupies federal lands
administered by the Bureau of Land
Management and by the U.S. Forest
Service within the Eldorado National
Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. David
Hanson, Project Manager, Hydro
Licensing & Permitting, Sacramento
Municipal Utility District, P.O. Box
15830, Mail Stop K203, Sacramento, CA
95852–0830, (888) 742–7683.
E:\FR\FM\31AUN1.SGM
31AUN1
Agencies
[Federal Register Volume 81, Number 169 (Wednesday, August 31, 2016)]
[Notices]
[Page 59993]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-20980]
[[Page 59993]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10887-027]
Climax Manufacturing Company; Notice of Application Accepted for
Filing, Soliciting Comments, Protests and Motions To Intervene
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Extension of License Term.
b. Project No.: P-10887-027.
c. Date Filed: August 4, 2016.
d. Licensee: Climax Manufacturing Company.
e. Name and Location of Project: Carthage Paper Makers
Hydroelectric Project, located on the Black River in Jefferson and
Lewis counties, New York.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
g. Licensee Contact Information: Mr. Fred Goutremout, 30 Champion
Street, Carthage, New York 13619, Phone: (315) 493-5518.
h. FERC Contact: Mr. Ashish Desai, (202) 502-8370,
ferc.gov">Ashish.Desai@ferc.gov.
i. Deadline for filing comments, motions to intervene and protests,
is 30 days from the issuance date of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file motions
to intervene, protests, comments, and recommendations, using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
ferc.gov">FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-10887-027.
j. Description of Proceeding: The licensee, Climax Manufacturing
Company, requests the Commission extend the term of the license by five
years, from October 31, 2021 to October 31, 2026. The licensee received
a 20-year license for the project on October 22, 1991. The licensee
states that in order to facilitate a basin-wide relicensing approach
with several other projects, it needs the five-year extension for the
license term. The licensee states that it has consulted with the U.S.
Fish and Wildlife Service (FWS) and New York State Department of
Environmental Conservation (DEC), and coordinated with other licensees
to develop a framework for relicensing. The licensee states that the
FWS and the New York DEC support the process.
k. This notice is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
Docket number (P-10887-027) excluding the last three digits in the
docket number field to access the notice. You may also register online
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call toll-free 1-866-208-3676 or email
ferc.gov">FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
n. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: August 25, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-20980 Filed 8-30-16; 8:45 am]
BILLING CODE 6717-01-P