Boyce Hydro Power, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 57896-57897 [2016-20283]

Download as PDF 57896 Federal Register / Vol. 81, No. 164 / Wednesday, August 24, 2016 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK3G9T082PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–1609–001. Applicants: ID SOLAR 1, LLC. Description: Report Filing: Supplement to 2 to be effective N/A. Filed Date: 8/17/16. Accession Number: 20160817–5350. Comments Due: 5 p.m. ET 9/7/16. Docket Numbers: ER16–1888–002. Applicants: Tidal Energy Marketing Inc. Description: Tariff Amendment: Amendment to be effective 8/6/2016. Filed Date: 8/17/16. Accession Number: 20160817–5330. Comments Due: 5 p.m. ET 8/31/16. Docket Numbers: ER16–2436–000. Applicants: Mesquite Solar 3, LLC. Description: § 205(d) Rate Filing: Notice of Non-Material Change in Status to be effective 5/20/2016. Filed Date: 8/16/16. Accession Number: 20160816–5228. Comments Due: 5 p.m. ET 9/6/16. Docket Numbers: ER16–2437–000. Applicants: Alcoa Power Generating Inc. Description: Alcoa Power Generating Inc. (Tapoca Division) submits Request for Waiver of Order No. 1000 Requirements. Filed Date: 8/16/16. Accession Number: 20160816–5272. Comments Due: 5 p.m. ET 9/6/16. Docket Numbers: ER16–2438–000. Applicants: Pedricktown Cogeneration Company LP. Description: Compliance filing: Reactive Service Resubmittal to be effective 9/13/2016. Filed Date: 8/17/16. Accession Number: 20160817–5382. Comments Due: 5 p.m. ET 9/7/16. Docket Numbers: ER16–2439–000. Applicants: H.A. Wagner LLC. Description: Compliance filing: Reactive Tariff Resubmittal to be effective 9/13/2016. Filed Date: 8/17/16. Accession Number: 20160817–5386. Comments Due: 5 p.m. ET 9/7/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s VerDate Sep<11>2014 20:16 Aug 23, 2016 Jkt 238001 Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 17, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–20280 Filed 8–23–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP16–1168–000. Applicants: Midcontinent Express Pipeline LLC. Description: § 4(d) Rate Filing: Buy Out Language Filing to be effective 9/ 10/2016. Filed Date: 8/11/16. Accession Number: 20160811–5062. Comments Due: 5 p.m. ET 8/23/16. Docket Numbers: RP16–1169–000. Applicants: Texas Eastern Transmission, LP. Description: § 4(d) Rate Filing: Negotiated Rates—8–12–2016 revision for Sequent Contract 911362 to be effective 8/12/2016. Filed Date: 8/11/16. Accession Number: 20160811–5156. Comments Due: 5 p.m. ET 8/23/16. Docket Numbers: RP16–1170–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20160811 Carlton Flow Obligations to be effective 11/1/2016. Filed Date: 8/11/16. Accession Number: 20160811–5190. Comments Due: 5 p.m. ET 8/23/16. Docket Numbers: RP16–1171–000. Applicants: Midcontinent Express Pipeline LLC. Description: § 4(d) Rate Filing: Removal of Expiring Devon Agreement to be effective 9/1/2016. Filed Date: 8/12/16. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Accession Number: 20160812–5048. Comments Due: 5 p.m. ET 8/24/16. Docket Numbers: RP16–1172–000. Applicants: ANR Storage Company. Description: Compliance filing ANRSC Compliance to Docket No. CP16–469 (Abandonment of Service) to be effective 7/1/2016. Filed Date: 8/12/16. Accession Number: 20160812–5057. Comments Due: 5 p.m. ET 8/24/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 15, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–20286 Filed 8–23–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2785–092] Boyce Hydro Power, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a.Application Type: Recreation Plan. b.Project No: 2785–092. c.Date Filed: August 16, 2016, as supplemented August 17, 2016. d.Applicant: Boyce Hydro Power, LLC. e.Name of Project: Sandford Water Power Project. f.Location: The project is located on the Tittabawssee River in Midland County, Michigan. g.Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. E:\FR\FM\24AUN1.SGM 24AUN1 mstockstill on DSK3G9T082PROD with NOTICES Federal Register / Vol. 81, No. 164 / Wednesday, August 24, 2016 / Notices h.Applicant Contact: Frank Christie, General Manager, Boyce Hydro Power, LLC, 6000 S. M–30, P.O. Box 15, Edenville, MI 48620, (989) 689–3161. i.FERC Contact: Mr. Mark Pawlowski, (202) 502–6052, mark.pawlowski@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: September 2, 2016. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2785–092. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k.Description of Request: The licensee filed a request for Commission approval of a temporary variance of the reservoir water surface elevation of the Sanford Water Power Project required by article 411 of the project’s license. To facilitate repair of the Edenville dam spillway located upstream of Sandford dam, the licensee requests to draw down the Sandford reservoir 3 feet to its winter elevation of 622 feet National Geodetic Vertical Datum (NGVD) beginning September 15, 2016. Because the licensee does not anticipate completing the work by November 15, the licensee would not return to reservoir to its normal water surface elevation of 625 feet NGVD until just prior to the surface water temperature of the reservoir reaching 39 degrees Fahrenheit as required by article 411 of the license l.Locations of the Application: A copy of the application is available for inspection and reproduction at the VerDate Sep<11>2014 20:16 Aug 23, 2016 Jkt 238001 Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o.Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 57897 Dated: August 18, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–20283 Filed 8–23–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP10–996–000. Applicants: Dominion Cove Point LNG, LP. Description: Report Filing: DCP–2016 Report of Operational Sales and Purchases of Gas. Filed Date: 7/29/16. Accession Number: 20160729–5131. Comments Due: 5 p.m. ET 8/10/16. Docket Numbers: RP16–1161–000. Applicants: Alliance Pipeline L.P. Description: § 4(d) Rate Filing: Negotiated Rate Interruptible Service to be effective 8/1/2016. Filed Date: 8/4/16. Accession Number: 20160804–5039. Comments Due: 5 p.m. ET 8/16/16. Docket Numbers: RP16–1162–000. Applicants: Gulf Crossing Pipeline Company LLC. Description: § 4(d) Rate Filing: Chesapeake Mutual Termination of Firm and Neg Rate Agmts to be effective 9/ 1/2016. Filed Date: 8/5/16. Accession Number: 20160805–5075. Comments Due: 5 p.m. ET 8/15/16. Docket Numbers: RP16–1163–000. Applicants: East Tennessee Natural Gas, LLC. Description: Compliance filing Loudon Expansion Recourse Rates in CP15–91–000 to be effective 9/1/2016. Filed Date: 8/5/16. Accession Number: 20160805–5097. Comments Due: 5 p.m. ET 8/17/16. Docket Numbers: RP16–1164–000. Applicants: East Tennessee Natural Gas, LLC. Description: § 4(d) Rate Filing: Negotiated Rate for Tate & Lyle Contract 410576 to be effective 9/1/2016. Filed Date: 8/5/16. Accession Number: 20160805–5101. Comments Due: 5 p.m. ET 8/17/16. Docket Numbers: RP16–1165–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: Revisions to Rate Schedules and GT&C to be effective 9/7/2016. E:\FR\FM\24AUN1.SGM 24AUN1

Agencies

[Federal Register Volume 81, Number 164 (Wednesday, August 24, 2016)]
[Notices]
[Pages 57896-57897]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-20283]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2785-092]


Boyce Hydro Power, LLC; Notice of Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a.Application Type: Recreation Plan.
    b.Project No: 2785-092.
    c.Date Filed: August 16, 2016, as supplemented August 17, 2016.
    d.Applicant: Boyce Hydro Power, LLC.
    e.Name of Project: Sandford Water Power Project.
    f.Location: The project is located on the Tittabawssee River in 
Midland County, Michigan.
    g.Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

[[Page 57897]]

    h.Applicant Contact: Frank Christie, General Manager, Boyce Hydro 
Power, LLC, 6000 S. M-30, P.O. Box 15, Edenville, MI 48620, (989) 689-
3161.
    i.FERC Contact: Mr. Mark Pawlowski, (202) 502-6052, 
mark.pawlowski@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: September 2, 2016.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426. The first page of any 
filing should include docket number P-2785-092.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k.Description of Request: The licensee filed a request for 
Commission approval of a temporary variance of the reservoir water 
surface elevation of the Sanford Water Power Project required by 
article 411 of the project's license. To facilitate repair of the 
Edenville dam spillway located upstream of Sandford dam, the licensee 
requests to draw down the Sandford reservoir 3 feet to its winter 
elevation of 622 feet National Geodetic Vertical Datum (NGVD) beginning 
September 15, 2016. Because the licensee does not anticipate completing 
the work by November 15, the licensee would not return to reservoir to 
its normal water surface elevation of 625 feet NGVD until just prior to 
the surface water temperature of the reservoir reaching 39 degrees 
Fahrenheit as required by article 411 of the license
    l.Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions To Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, 
385.211, and 385.214, respectively. In determining the appropriate 
action to take, the Commission will consider all protests or other 
comments filed, but only those who file a motion to intervene in 
accordance with the Commission's Rules may become a party to the 
proceeding. Any comments, protests, or motions to intervene must be 
received on or before the specified comment date for the particular 
application.
    o.Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: August 18, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-20283 Filed 8-23-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.