Extension of Deadline for Action on the July 2016 Section 126 Petition From Delaware, 57461-57463 [2016-20140]
Download as PDF
Federal Register / Vol. 81, No. 163 / Tuesday, August 23, 2016 / Rules and Regulations
U.S.C. 4321–4370f), and have
determined that this action is one of a
category of actions that do not
individually or cumulatively have a
significant effect on the human
environment. This rule involves a safety
zone lasting two hours that will prohibit
entry from mile 180 to 180.5 on the
UMR. It is categorically excluded from
further review under paragraph 34(g) of
Figure 2–1 of the Commandant
Instruction. An environmental analysis
checklist supporting this determination
and a Categorical Exclusion
Determination are available in the
docket where indicated under
ADDRESSES. We seek any comments or
information that may lead to the
discovery of a significant environmental
impact from this rule.
G. Protest Activities
The Coast Guard respects the First
Amendment rights of protesters.
Protesters are asked to contact the
person listed in the FOR FURTHER
INFORMATION CONTACT section to
coordinate protest activities so that your
message can be received without
jeopardizing the safety or security of
people, places or vessels.
(COTP) in the enforcement of the safety
zone.
(c) Regulations. (1) Under the general
safety zone regulations in subpart C of
this part, you may not enter the safety
zone described in paragraph (a) of this
section unless authorized by the COTP
or the COTP’s designated representative.
(2) To seek permission to enter,
contact the COTP or the COTP’s
representative via VHF–FM channel 16,
or through Coast Guard Sector Upper
Mississippi River at 314–269–2332.
Those in the safety zone must comply
with all lawful orders or directions
given to them by the COTP or the
COTP’s designated representative.
(d) Enforcement periods. This section
will be enforced from 8:30 p.m. to 10:30
p.m. on September 3, 2016.
(e) Informational Broadcasts. The
COTP or a designated representative
will inform the public through
broadcast notices to mariners of the
enforcement period for the safety zone
as well as any changes in the dates and
times of enforcement.
Dated: August 17, 2016.
M.L. Malloy
Captain, U.S. Coast Guard, Captain of the
Port Upper Mississippi River.
List of Subjects in 33 CFR Part 165
[FR Doc. 2016–20084 Filed 8–22–16; 8:45 am]
Harbors, Marine safety, Navigation
(water), Reporting and recordkeeping
requirements, Security measures, and
Waterways.
For the reasons discussed in the
preamble, the Coast Guard amends 33
CFR part 165 as follows:
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
Authority: 33 U.S.C. 1231; 50 U.S.C. 191;
33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5;
Department of Homeland Security Delegation
No. 0170.1.
2. Add § 165.T08–0689 to read as
follows:
■
ehiers on DSK5VPTVN1PROD with RULES
I. Background and Legal Requirements
for Interstate Air Pollution
This is a procedural action to extend
the deadline for the EPA to respond to
a petition from the state of Delaware
filed pursuant to CAA section 126(b).
The EPA received the petition on July
7, 2016. The petition requests that the
EPA make a finding under section
126(b) of the CAA that the Brunner
Island Steam Electric Station located in
York County, Pennsylvania, is operating
in a manner that emits air pollutants in
violation of the provisions of section
110(a)(2)(D)(i)(I) of the CAA with
respect to the 2008 and 2015 ozone
NAAQS.
Section 126(b) of the CAA authorizes
states to petition the EPA to find that a
major source or group of stationary
sources in upwind states emits or would
emit any air pollutant in violation of the
prohibition of CAA section
110(a)(2)(D)(i) 1 by contributing
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
In this action, the
Environmental Protection Agency (EPA)
is determining that 60 days is
insufficient time to complete the
technical and other analyses and public
notice-and-comment process required
for our review of a petition submitted by
the state of Delaware pursuant to section
126 of the Clean Air Act (CAA). The
petition requests that the EPA make a
finding that the Brunner Island Steam
Electric Station located in York County,
Pennsylvania, emit air pollution that
significantly contributes to
nonattainment and interferes with
maintenance of the 2008 and 2015
ozone national ambient air quality
standards (NAAQS) in state of
SUMMARY:
§ 165.T08–0689 Safety Zone; Upper
Mississippi River between miles 180 and
180.5; St. Louis, MO.
(a) Location. The following area is a
safety zone: All waters of the Upper
Mississippi River between miles 180 to
180.5, St. Louis, MO.
(b) Definitions. As used in this
section, designated representative
means a Coast Guard Patrol
Commander, including a Coast Guard
coxswain, petty officer, or other officer
operating a Coast Guard vessel and a
Federal, State, and local officer
designated by or assisting the Captain of
the Port Upper Mississippi River
Jkt 238001
SUPPLEMENTARY INFORMATION:
[EPA–HQ–OAR–2016–0402; FRL–9951–18OAR]
Extension of Deadline for Action on
the July 2016 Section 126 Petition
From Delaware
1. The authority citation for part 165
continues to read as follows:
■
14:39 Aug 22, 2016
Delaware. Under section 307(d)(10) of
CAA, the EPA is authorized to grant a
time extension for responding to a
petition if the EPA determines that the
extension is necessary to afford the
public, and the agency, adequate
opportunity to carry out the purposes of
the section 307(d)’s notice-andcomment rulemaking requirements. By
this action, the EPA is making that
determination. The EPA is therefore
extending the deadline for acting on the
petition to no later than March 5, 2017.
DATES: This final rule is effective on
August 23, 2016.
ADDRESSES: The EPA has established a
docket for this action under Docket ID
No. EPA–HQ–OAR–2016–0402. All
documents in the docket are listed on
the https://www.regulations.gov Web
site. Although listed in the index, some
information is not publicly available,
e.g., Confidential Business Information
or other information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
is not placed on the Internet and will be
publicly available only in hard copy
form. Publicly available docket
materials are available electronically
through https://www.regulations.gov.
FOR FURTHER INFORMATION CONTACT: Ms.
Gobeail McKinley, Office of Air Quality
Planning and Standards (C504–04), U.S.
EPA, Research Triangle Park, North
Carolina 27709, telephone number (919)
541–5246, email: mckinley.gobeail@
epa.gov.
40 CFR Part 52
PART 165—REGULATED NAVIGATION
AREAS AND LIMITED ACCESS AREAS
VerDate Sep<11>2014
57461
PO 00000
Frm 00023
Fmt 4700
Sfmt 4700
1 The text of CAA section 126 codified in the
United States Code cross references CAA section
E:\FR\FM\23AUR1.SGM
Continued
23AUR1
57462
Federal Register / Vol. 81, No. 163 / Tuesday, August 23, 2016 / Rules and Regulations
significantly to nonattainment or
maintenance problems in downwind
states. Section 110(a)(2)(D)(i)(I) of the
CAA prohibits emissions of any air
pollutant in amounts which will
contribute significantly to
nonattainment in, or interfere with
maintenance by, any other state with
respect to any NAAQS. The petition
asserts that emissions from the Brunner
Island’s three major boiler units
significantly contribute to Delaware’s
nonattainment of the 2008 8-hour ozone
NAAQS, set at 0.075 parts per million
(ppm), and the revised 2015 8-hour
ozone NAAQS, set at 0.070 ppm.2
Pursuant to CAA section 126(b), the
EPA must make the finding requested in
the petition, or must deny the petition
within 60 days of its receipt. Under
CAA section 126(c), any existing
sources for which the EPA makes the
requested finding must cease operations
within 3 months of the finding, except
that the source may continue to operate
if it complies with emission limitations
and compliance schedules (containing
increments of progress) that the EPA
may provide to bring about compliance
with the applicable requirements as
expeditiously as practical but no later
than 3 years from the date of the
finding.
CAA section 126(b) further provides
that the EPA must hold a public hearing
on the petition. The EPA’s action under
section 126 is also subject to the
procedural requirements of CAA section
307(d). See CAA section 307(d)(1)(N).
One of these requirements is notice-andcomment rulemaking, under section
307(d)(3)–(6).
In addition, CAA section 307(d)(10)
provides for a time extension, under
certain circumstances, for a rulemaking
subject to CAA section 307(d).
Specifically, CAA section 307(d)(10)
provides:
ehiers on DSK5VPTVN1PROD with RULES
Each statutory deadline for promulgation
of rules to which this subsection applies
which requires promulgation less than six
months after date of proposal may be
extended to not more than six months after
date of proposal by the Administrator upon
a determination that such extension is
necessary to afford the public, and the
agency, adequate opportunity to carry out the
purposes of the subsection.
110(a)(2)(D)(ii) instead of CAA section
110(a)(2)(D)(i). The courts have confirmed that this
is a scrivener’s error and the correct cross reference
is to CAA section 110(a)(2)(D)(i). See Appalachian
Power Co. v. EPA, 249 F.3d 1032, 1040-44 (D.C. Cir.
2001).
2 On October 1, 2015, the EPA strengthened the
ground-level ozone NAAQS, based on extensive
scientific evidence about ozone’s effects on public
health and welfare. See 80 FR 65291 (October 26,
2015).
VerDate Sep<11>2014
14:39 Aug 22, 2016
Jkt 238001
CAA section 307(d)(10) may be
applied to section 126 rulemakings
because the 60-day time limit under
CAA section 126(b) necessarily limits
the period for promulgation of a final
rule after proposal to less than 6
months.
II. Final Rule
A. Rule
In accordance with CAA section
307(d)(10), the EPA is determining that
the 60-day period afforded by CAA
section 126(b) for responding to the
petition from the state of Delaware is
not adequate to allow the public and the
agency the opportunity to carry out the
purposes of CAA section 307(d).
Specifically, the 60-day period is
insufficient for the EPA to complete the
necessary technical review, develop an
adequate proposal, and allow time for
notice and comment, including an
opportunity for public hearing, on a
proposed finding regarding whether the
Brunner Island Steam Electric Station
identified in the CAA section 126
petition contributes significantly to
nonattainment or interferes with
maintenance of the 2008 ozone NAAQS
or the 2015 ozone NAAQS in Delaware.
Moreover, the 60-day period is
insufficient for the EPA to review and
develop response to any public
comments on a proposed finding, or
testimony supplied at a public hearing,
and to develop and promulgate a final
finding in response to the petition. The
EPA is in the process of determining an
appropriate schedule for action on the
CAA section 126 petition. This schedule
must afford the EPA adequate time to
prepare a proposal that clearly
elucidates the issues to facilitate public
comment, and must provide adequate
time for the public to comment and for
the EPA to review and develop
responses to those comments prior to
issuing the final rule. As a result of this
extension, the deadline for the EPA to
act on the petition is March 5, 2017.
B. Notice and Comment Under the
Administrative Procedures Act (APA)
This document is a final agency
action, but may not be subject to the
notice-and-comment requirements of
the APA, 5 U.S.C. 553(b). The EPA
believes that, because of the limited
time provided to make a determination,
the deadline for action on the CAA
section 126 petition should be extended.
Congress may not have intended such a
determination to be subject to noticeand-comment rulemaking. However, to
the extent that this determination
otherwise would require notice and
opportunity for public comment, there
PO 00000
Frm 00024
Fmt 4700
Sfmt 4700
is good cause within the meaning of 5
U.S.C. 553(b)(3)(B) not to apply those
requirements here. Providing for notice
and comment would be impracticable
because of the limited time provided for
making this determination, and would
be contrary to the public interest
because it would divert agency
resources from the substantive review of
the CAA section 126 petition.
C. Effective Date Under the APA
This action is effective on August 23,
2016. Under the APA, 5 U.S.C.
553(d)(3), agency rulemaking may take
effect before 30 days after the date of
publication in the Federal Register if
the agency has good cause to mandate
an earlier effective date. This action—a
deadline extension—must take effect
immediately because its purpose is to
extend by 6 months the deadline for
action on the petition. As discussed
earlier, the EPA intends to use the 6month extension period to develop a
proposal on the petition and provide
time for public comment before issuing
the final rule. It would not be possible
for the EPA to complete the required
notice and comment and public hearing
process within the original 60-day
period noted in the statute. These
reasons support an immediate effective
date.
III. Statutory and Executive Order
Reviews
A. Executive Orders 12866: Regulatory
Planning and Review and Executive
Order 13563: Improving Regulation and
Regulatory
This action is not a significant
regulatory action and was therefore not
submitted to the Office of Management
and Budget (OMB) for review.
B. Paperwork Reduction Act (PRA)
This action does not impose an
information collection burden under the
PRA. This good cause final action
simply extends the date for the EPA to
take action on a petition and does not
impose any new obligations or
enforceable duties on any state, local or
tribal governments or the private sector.
It does not contain any recordkeeping or
reporting requirements.
C. Regulatory Flexibility Act (RFA)
This action is not subject to the RFA.
The RFA applies only to rules subject to
notice-and-comment rulemaking
requirements under the APA, 5 U.S.C.
553, or any other statute. This rule is not
subject to notice-and-comment
requirements because the agency has
invoked the APA ‘‘good cause’’
exemption under 5 U.S.C. 553(b).
E:\FR\FM\23AUR1.SGM
23AUR1
Federal Register / Vol. 81, No. 163 / Tuesday, August 23, 2016 / Rules and Regulations
D. Unfunded Mandates Reform Act
(UMRA)
This action does not contain any
unfunded mandate of $100 million or
more as described in UMRA, 2 U.S.C.
1531–1538, and does not significantly or
uniquely affect small governments. The
action imposes no enforceable duty on
any state, local or tribal governments or
the private sector.
E. Executive Order 13132: Federalism
This action does not have federalism
implications. It will not have substantial
direct effects on the states, on the
relationship between the national
government and the states, or on the
distribution of power and
responsibilities among the various
levels of government.
F. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
This action does not have tribal
implications, as specified in Executive
Order 13175. This good cause final
action simply extends the date for the
EPA to take action on a petition. Thus,
Executive Order 13175 does not apply
to this rule.
G. Executive Order 13045: Protection of
Children From Environmental Health
and Safety Risks
The EPA interprets Executive Order
13045 as applying only to those
regulatory actions that concern
environmental health or safety risks that
the EPA has reason to believe may
disproportionately affect children, per
the definition of ‘‘covered regulatory
action’’ in section 2–202 of the
Executive Order. This action is not
subject to Executive Order 13045
because it does not concern an
environmental health risk or safety risk.
H. Executive Order 13211: Actions That
Significantly Affect Energy Supply,
Distribution or Use
This action is not subject to Executive
Order 13211, because it is not a
significant regulatory action under
Executive Order 12866.
ehiers on DSK5VPTVN1PROD with RULES
I. National Technology Transfer and
Advancement Act (NTTAA)
This rulemaking does not involve
technical standards.
health or safety standard. This good
cause final action simply extends the
date for the EPA to take action on a
petition and does not have any impact
on human health or the environment.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and
the EPA will submit a rule report to
each House of the Congress and to the
Comptroller General of the United
States. The CRA allows the issuing
agency to make a rule effective sooner
than otherwise provided by the CRA if
the agency makes a good cause finding
that notice-and-comment rulemaking
procedures are impracticable,
unnecessary or contrary to the public
interest (5 U.S.C. 808(2)). The EPA has
made a good cause finding for this rule
as discussed in Section II.B of this
document, including the basis for that
finding.
IV. Statutory Authority
The statutory authority for this action
is provided by sections 110, 126 and
307 of the CAA as amended (42 U.S.C.
7410, 7426 and 7607).
V. Judicial Review
Under section 307(b)(1) of the CAA,
judicial review of this final rule is
available only by the filing of a petition
for review in the U.S. Court of Appeals
for the appropriate circuit by October
24, 2016. Under section 307(b)(2) of the
CAA, the requirements that are the
subject of this final rule may not be
challenged later in civil or criminal
proceedings brought by us to enforce
these requirements.
List of Subjects in 40 CFR Part 52
Environmental protection,
Administrative practices and
procedures, Air pollution control,
Electric utilities, Incorporation by
reference, Intergovernmental relations,
Nitrogen oxides, Ozone.
Dated: August 15, 2016.
Gina McCarthy,
Administrator.
[FR Doc. 2016–20140 Filed 8–22–16; 8:45 am]
BILLING CODE 6560–50–P
J. Executive Order 12898: Federal
Actions To Address Environmental
Justice in Minority Populations and
Low-Income Populations
The EPA believes that this action is
not subject to Executive Order 12898 (59
FR 7629, February 16, 1994) because it
does not establish an environmental
VerDate Sep<11>2014
14:39 Aug 22, 2016
Jkt 238001
PO 00000
Frm 00025
Fmt 4700
Sfmt 4700
57463
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R05–OAR–2015–0075; FRL–9950–86–
Region 5]
Air Plan Approval; Wisconsin;
Kenosha County 2008 8-Hour Ozone
Nonattainment Area Reasonable
Further Progress Plan
Environmental Protection
Agency (EPA).
ACTION: Direct final rule.
AGENCY:
The Environmental Protection
Agency (EPA) is approving an Early
Progress Plan and motor vehicle
emissions budgets (MVEBs) for volatile
organic compounds (VOCs) and oxides
of nitrogen (NOX) for the Kenosha
County, Wisconsin 8-hour ozone
nonattainment area. Wisconsin
submitted an Early Progress Plan for
Kenosha County on January 16, 2015.
This submittal was developed to
establish MVEBs for the Kenosha 2008
8-hour ozone nonattainment area. This
approval of the Early Progress Plan for
the Kenosha 2008 8-hour ozone
nonattainment area is based on EPA’s
determination that Wisconsin has
demonstrated that the State
Implementation Plan (SIP) revision
containing these MVEBs, when
considered with the emissions from all
sources, shows progress toward
attainment from the 2011 base year
through a 2015 target year.
DATES: This direct final rule will be
effective October 24, 2016, unless EPA
receives adverse comments by
September 22, 2016. If adverse
comments are received, EPA will
publish a timely withdrawal of the
direct final rule in the Federal Register
informing the public that the rule will
not take effect.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–R05–
OAR–2015–0075 at https://
www.regulations.gov or via email to
persoon.carolyn@epa.gov. For
comments submitted at Regulations.gov,
follow the online instructions for
submitting comments. Once submitted,
comments cannot be edited or removed
from Regulations.gov. For either manner
of submission, EPA may publish any
comment received to its public docket.
Do not submit electronically any
information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. Multimedia
submissions (audio, video, etc.) must be
accompanied by a written comment.
The written comment is considered the
SUMMARY:
E:\FR\FM\23AUR1.SGM
23AUR1
Agencies
[Federal Register Volume 81, Number 163 (Tuesday, August 23, 2016)]
[Rules and Regulations]
[Pages 57461-57463]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-20140]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-HQ-OAR-2016-0402; FRL-9951-18-OAR]
Extension of Deadline for Action on the July 2016 Section 126
Petition From Delaware
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: In this action, the Environmental Protection Agency (EPA) is
determining that 60 days is insufficient time to complete the technical
and other analyses and public notice-and-comment process required for
our review of a petition submitted by the state of Delaware pursuant to
section 126 of the Clean Air Act (CAA). The petition requests that the
EPA make a finding that the Brunner Island Steam Electric Station
located in York County, Pennsylvania, emit air pollution that
significantly contributes to nonattainment and interferes with
maintenance of the 2008 and 2015 ozone national ambient air quality
standards (NAAQS) in state of Delaware. Under section 307(d)(10) of
CAA, the EPA is authorized to grant a time extension for responding to
a petition if the EPA determines that the extension is necessary to
afford the public, and the agency, adequate opportunity to carry out
the purposes of the section 307(d)'s notice-and-comment rulemaking
requirements. By this action, the EPA is making that determination. The
EPA is therefore extending the deadline for acting on the petition to
no later than March 5, 2017.
DATES: This final rule is effective on August 23, 2016.
ADDRESSES: The EPA has established a docket for this action under
Docket ID No. EPA-HQ-OAR-2016-0402. All documents in the docket are
listed on the https://www.regulations.gov Web site. Although listed in
the index, some information is not publicly available, e.g.,
Confidential Business Information or other information whose disclosure
is restricted by statute. Certain other material, such as copyrighted
material, is not placed on the Internet and will be publicly available
only in hard copy form. Publicly available docket materials are
available electronically through https://www.regulations.gov.
FOR FURTHER INFORMATION CONTACT: Ms. Gobeail McKinley, Office of Air
Quality Planning and Standards (C504-04), U.S. EPA, Research Triangle
Park, North Carolina 27709, telephone number (919) 541-5246, email:
mckinley.gobeail@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background and Legal Requirements for Interstate Air Pollution
This is a procedural action to extend the deadline for the EPA to
respond to a petition from the state of Delaware filed pursuant to CAA
section 126(b). The EPA received the petition on July 7, 2016. The
petition requests that the EPA make a finding under section 126(b) of
the CAA that the Brunner Island Steam Electric Station located in York
County, Pennsylvania, is operating in a manner that emits air
pollutants in violation of the provisions of section 110(a)(2)(D)(i)(I)
of the CAA with respect to the 2008 and 2015 ozone NAAQS.
Section 126(b) of the CAA authorizes states to petition the EPA to
find that a major source or group of stationary sources in upwind
states emits or would emit any air pollutant in violation of the
prohibition of CAA section 110(a)(2)(D)(i) \1\ by contributing
[[Page 57462]]
significantly to nonattainment or maintenance problems in downwind
states. Section 110(a)(2)(D)(i)(I) of the CAA prohibits emissions of
any air pollutant in amounts which will contribute significantly to
nonattainment in, or interfere with maintenance by, any other state
with respect to any NAAQS. The petition asserts that emissions from the
Brunner Island's three major boiler units significantly contribute to
Delaware's nonattainment of the 2008 8-hour ozone NAAQS, set at 0.075
parts per million (ppm), and the revised 2015 8-hour ozone NAAQS, set
at 0.070 ppm.\2\
---------------------------------------------------------------------------
\1\ The text of CAA section 126 codified in the United States
Code cross references CAA section 110(a)(2)(D)(ii) instead of CAA
section 110(a)(2)(D)(i). The courts have confirmed that this is a
scrivener's error and the correct cross reference is to CAA section
110(a)(2)(D)(i). See Appalachian Power Co. v. EPA, 249 F.3d 1032,
1040-44 (D.C. Cir. 2001).
\2\ On October 1, 2015, the EPA strengthened the ground-level
ozone NAAQS, based on extensive scientific evidence about ozone's
effects on public health and welfare. See 80 FR 65291 (October 26,
2015).
---------------------------------------------------------------------------
Pursuant to CAA section 126(b), the EPA must make the finding
requested in the petition, or must deny the petition within 60 days of
its receipt. Under CAA section 126(c), any existing sources for which
the EPA makes the requested finding must cease operations within 3
months of the finding, except that the source may continue to operate
if it complies with emission limitations and compliance schedules
(containing increments of progress) that the EPA may provide to bring
about compliance with the applicable requirements as expeditiously as
practical but no later than 3 years from the date of the finding.
CAA section 126(b) further provides that the EPA must hold a public
hearing on the petition. The EPA's action under section 126 is also
subject to the procedural requirements of CAA section 307(d). See CAA
section 307(d)(1)(N). One of these requirements is notice-and-comment
rulemaking, under section 307(d)(3)-(6).
In addition, CAA section 307(d)(10) provides for a time extension,
under certain circumstances, for a rulemaking subject to CAA section
307(d). Specifically, CAA section 307(d)(10) provides:
Each statutory deadline for promulgation of rules to which this
subsection applies which requires promulgation less than six months
after date of proposal may be extended to not more than six months
after date of proposal by the Administrator upon a determination
that such extension is necessary to afford the public, and the
agency, adequate opportunity to carry out the purposes of the
subsection.
CAA section 307(d)(10) may be applied to section 126 rulemakings
because the 60-day time limit under CAA section 126(b) necessarily
limits the period for promulgation of a final rule after proposal to
less than 6 months.
II. Final Rule
A. Rule
In accordance with CAA section 307(d)(10), the EPA is determining
that the 60-day period afforded by CAA section 126(b) for responding to
the petition from the state of Delaware is not adequate to allow the
public and the agency the opportunity to carry out the purposes of CAA
section 307(d). Specifically, the 60-day period is insufficient for the
EPA to complete the necessary technical review, develop an adequate
proposal, and allow time for notice and comment, including an
opportunity for public hearing, on a proposed finding regarding whether
the Brunner Island Steam Electric Station identified in the CAA section
126 petition contributes significantly to nonattainment or interferes
with maintenance of the 2008 ozone NAAQS or the 2015 ozone NAAQS in
Delaware. Moreover, the 60-day period is insufficient for the EPA to
review and develop response to any public comments on a proposed
finding, or testimony supplied at a public hearing, and to develop and
promulgate a final finding in response to the petition. The EPA is in
the process of determining an appropriate schedule for action on the
CAA section 126 petition. This schedule must afford the EPA adequate
time to prepare a proposal that clearly elucidates the issues to
facilitate public comment, and must provide adequate time for the
public to comment and for the EPA to review and develop responses to
those comments prior to issuing the final rule. As a result of this
extension, the deadline for the EPA to act on the petition is March 5,
2017.
B. Notice and Comment Under the Administrative Procedures Act (APA)
This document is a final agency action, but may not be subject to
the notice-and-comment requirements of the APA, 5 U.S.C. 553(b). The
EPA believes that, because of the limited time provided to make a
determination, the deadline for action on the CAA section 126 petition
should be extended. Congress may not have intended such a determination
to be subject to notice-and-comment rulemaking. However, to the extent
that this determination otherwise would require notice and opportunity
for public comment, there is good cause within the meaning of 5 U.S.C.
553(b)(3)(B) not to apply those requirements here. Providing for notice
and comment would be impracticable because of the limited time provided
for making this determination, and would be contrary to the public
interest because it would divert agency resources from the substantive
review of the CAA section 126 petition.
C. Effective Date Under the APA
This action is effective on August 23, 2016. Under the APA, 5
U.S.C. 553(d)(3), agency rulemaking may take effect before 30 days
after the date of publication in the Federal Register if the agency has
good cause to mandate an earlier effective date. This action--a
deadline extension--must take effect immediately because its purpose is
to extend by 6 months the deadline for action on the petition. As
discussed earlier, the EPA intends to use the 6-month extension period
to develop a proposal on the petition and provide time for public
comment before issuing the final rule. It would not be possible for the
EPA to complete the required notice and comment and public hearing
process within the original 60-day period noted in the statute. These
reasons support an immediate effective date.
III. Statutory and Executive Order Reviews
A. Executive Orders 12866: Regulatory Planning and Review and Executive
Order 13563: Improving Regulation and Regulatory
This action is not a significant regulatory action and was
therefore not submitted to the Office of Management and Budget (OMB)
for review.
B. Paperwork Reduction Act (PRA)
This action does not impose an information collection burden under
the PRA. This good cause final action simply extends the date for the
EPA to take action on a petition and does not impose any new
obligations or enforceable duties on any state, local or tribal
governments or the private sector. It does not contain any
recordkeeping or reporting requirements.
C. Regulatory Flexibility Act (RFA)
This action is not subject to the RFA. The RFA applies only to
rules subject to notice-and-comment rulemaking requirements under the
APA, 5 U.S.C. 553, or any other statute. This rule is not subject to
notice-and-comment requirements because the agency has invoked the APA
``good cause'' exemption under 5 U.S.C. 553(b).
[[Page 57463]]
D. Unfunded Mandates Reform Act (UMRA)
This action does not contain any unfunded mandate of $100 million
or more as described in UMRA, 2 U.S.C. 1531-1538, and does not
significantly or uniquely affect small governments. The action imposes
no enforceable duty on any state, local or tribal governments or the
private sector.
E. Executive Order 13132: Federalism
This action does not have federalism implications. It will not have
substantial direct effects on the states, on the relationship between
the national government and the states, or on the distribution of power
and responsibilities among the various levels of government.
F. Executive Order 13175: Consultation and Coordination With Indian
Tribal Governments
This action does not have tribal implications, as specified in
Executive Order 13175. This good cause final action simply extends the
date for the EPA to take action on a petition. Thus, Executive Order
13175 does not apply to this rule.
G. Executive Order 13045: Protection of Children From Environmental
Health and Safety Risks
The EPA interprets Executive Order 13045 as applying only to those
regulatory actions that concern environmental health or safety risks
that the EPA has reason to believe may disproportionately affect
children, per the definition of ``covered regulatory action'' in
section 2-202 of the Executive Order. This action is not subject to
Executive Order 13045 because it does not concern an environmental
health risk or safety risk.
H. Executive Order 13211: Actions That Significantly Affect Energy
Supply, Distribution or Use
This action is not subject to Executive Order 13211, because it is
not a significant regulatory action under Executive Order 12866.
I. National Technology Transfer and Advancement Act (NTTAA)
This rulemaking does not involve technical standards.
J. Executive Order 12898: Federal Actions To Address Environmental
Justice in Minority Populations and Low-Income Populations
The EPA believes that this action is not subject to Executive Order
12898 (59 FR 7629, February 16, 1994) because it does not establish an
environmental health or safety standard. This good cause final action
simply extends the date for the EPA to take action on a petition and
does not have any impact on human health or the environment.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and the EPA will submit a rule
report to each House of the Congress and to the Comptroller General of
the United States. The CRA allows the issuing agency to make a rule
effective sooner than otherwise provided by the CRA if the agency makes
a good cause finding that notice-and-comment rulemaking procedures are
impracticable, unnecessary or contrary to the public interest (5 U.S.C.
808(2)). The EPA has made a good cause finding for this rule as
discussed in Section II.B of this document, including the basis for
that finding.
IV. Statutory Authority
The statutory authority for this action is provided by sections
110, 126 and 307 of the CAA as amended (42 U.S.C. 7410, 7426 and 7607).
V. Judicial Review
Under section 307(b)(1) of the CAA, judicial review of this final
rule is available only by the filing of a petition for review in the
U.S. Court of Appeals for the appropriate circuit by October 24, 2016.
Under section 307(b)(2) of the CAA, the requirements that are the
subject of this final rule may not be challenged later in civil or
criminal proceedings brought by us to enforce these requirements.
List of Subjects in 40 CFR Part 52
Environmental protection, Administrative practices and procedures,
Air pollution control, Electric utilities, Incorporation by reference,
Intergovernmental relations, Nitrogen oxides, Ozone.
Dated: August 15, 2016.
Gina McCarthy,
Administrator.
[FR Doc. 2016-20140 Filed 8-22-16; 8:45 am]
BILLING CODE 6560-50-P