Combined Notice of Filings #2, 55189 [2016-19750]
Download as PDF
Federal Register / Vol. 81, No. 160 / Thursday, August 18, 2016 / Notices
Dated: August 12, 2016.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2016–19750 Filed 8–17–16; 8:45 am]
BILLING CODE 6717–01–P
rmajette on DSK2TPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–2414–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Service Agreement Nos. 4511 and 4512,
Queue Positions AB1–127 and AB1–128
to be effective 7/13/2016.
Filed Date: 8/12/16.
Accession Number: 20160812–5145.
Comments Due: 5 p.m. ET 9/2/16.
Docket Numbers: ER16–2415–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits Second Quarter 2016 Capital
Budget Report.
Filed Date: 8/12/16.
Accession Number: 20160812–5153.
Comments Due: 5 p.m. ET 9/2/16.
Docket Numbers: ER16–2416–000.
Applicants: Central Maine Power
Company.
Description: § 205(d) Rate Filing:
Amended CSIA with Brookfield White
Pine Hydro LLC to be effective 8/1/
2016.
Filed Date: 8/12/16.
Accession Number: 20160812–5160.
Comments Due: 5 p.m. ET 9/2/16.
Docket Numbers: ER16–2417–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2016–
08–12_Removal of MVP Pricing
Limitation to PJM (ER10–1791) to be
effective 7/13/2016.
Filed Date: 8/12/16.
Accession Number: 20160812–5197.
Comments Due: 5 p.m. ET 9/2/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
18:53 Aug 17, 2016
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
55189
Schedule for Environmental Review
Issuance of Notice of Availability of
the final EIS: June 30, 2017.
90-day Federal Authorization
Decision Deadline: September 28, 2017.
If a schedule change becomes
necessary for the final EIS, an additional
notice will be provided so that the
relevant agencies are kept informed of
the projects’ progress.
Project Description
The Atlantic Coast Pipeline consists
of 333.1 miles of 42-inch-diameter
mainline pipeline in West Virginia,
Virginia, and North Carolina; 186.0
miles of 36-inch-diameter mainline
Docket Nos.
pipeline in North Carolina; 83.0 miles of
Atlantic Coast Pipeline,
CP15–554–000 20-inch-diameter lateral pipeline in
LLC .................................
CP15–554–001 North Carolina and Virginia; and two
Dominion Transmission,
short 16-inch-diameter lateral pipelines
Inc ...............................
CP15–555–000 in Brunswick and Greenville Counties,
Virginia. In addition, Atlantic proposes
to construct and operate three new
On September 18, 2015, Atlantic
compressor stations totaling 130,345
Coast Pipeline, LLC (Atlantic) and
horsepower in Lewis County, West
Dominion Transmission, Inc.
(Dominion) filed applications in Docket Virginia; Buckingham County, Virginia;
Nos. CP15–554–000 and CP15–555–000 and Northampton County, North
Carolina, along with other aboveground
requesting a Certificate of Public
facilities along the mainline and lateral
Convenience and Necessity pursuant to
Sections 7(b) and 7(c) of the Natural Gas pipelines.
The Supply Header Project consists of
Act to construct, operate, and maintain
3.9 miles of 30-inch-diameter pipeline
certain natural gas pipeline facilities.
loop in Westmoreland County,
Atlantic’s proposed Atlantic Coast
Pennsylvania; 33.6 miles of 30-inchPipeline in West Virginia, Virginia, and
diameter pipeline loop in West Virginia;
North Carolina would transport about
and modifications to four existing
1.5 billion cubic feet per day of natural
compressor stations in Westmoreland
gas from production areas in the
County, Pennsylvania; Greene County,
Appalachian Basin to markets in
Pennsylvania; and Marshall and Wetzel
Virginia and North Carolina.
Counties, West Virginia.
Dominion’s proposed Supply Header
Project in Pennsylvania and West
Background
Virginia would allow additional gas
On November 13, 2014, the
transportation on its existing system and
Commission staff granted Atlantic’s and
would transport gas to various
Dominion’s request to use the FERC’s
customers, including Atlantic. Because
Pre-filing environmental review process
these are interrelated projects, the
and assigned the Atlantic Coast Pipeline
Federal Energy Regulatory Commission
temporary Docket No. PF15–6–000 and
(FERC or Commission) deemed it was
the Supply Header Project temporary
appropriate to analyze them in a single
Docket No. PF15–5–000. On February
environmental impact statement (EIS).
27, 2015, the Commission issued a
On October 2, 2015, the FERC issued
Notice of Intent to Prepare an
its Notice of Application for the
Environmental Impact Statement for the
projects. Among other things, that
Planned Supply Header Project and
notice alerted other agencies issuing
Atlantic Coast Pipeline Project, Request
federal authorizations of the
for Comments on Environmental Issues,
requirement to complete all necessary
and Notice of Public Scoping Meetings
reviews and to reach a final decision on (NOI). On March 22, 2016, the FERC
the request for a federal authorization
issued a Notice of Amendment to
within 90 days of the date of issuance
Application announcing that Atlantic
of the Commission staff’s final EIS for
had filed an amendment to its
the Atlantic Coast Pipeline and Supply
application. On May 3, 2016, the
Header Project. This instant notice
Commission issued a Supplemental NOI
identifies the FERC staff’s planned
that discussed the amendments to
schedule for completion of the final EIS Atlantic’s application and opened a
for the projects, which is based on an
scoping period for route modifications
issuance of the draft EIS in December
that Atlantic incorporated into the
2016.
Atlantic Coast Pipeline.
Notice of Schedule for Environmental
Review of the Atlantic Coast Pipeline
and the Supply Header Project
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
E:\FR\FM\18AUN1.SGM
18AUN1
Agencies
[Federal Register Volume 81, Number 160 (Thursday, August 18, 2016)]
[Notices]
[Page 55189]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-19750]
[[Page 55189]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER16-2414-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Service Agreement Nos. 4511
and 4512, Queue Positions AB1-127 and AB1-128 to be effective 7/13/
2016.
Filed Date: 8/12/16.
Accession Number: 20160812-5145.
Comments Due: 5 p.m. ET 9/2/16.
Docket Numbers: ER16-2415-000.
Applicants: ISO New England Inc.
Description: ISO New England Inc. submits Second Quarter 2016
Capital Budget Report.
Filed Date: 8/12/16.
Accession Number: 20160812-5153.
Comments Due: 5 p.m. ET 9/2/16.
Docket Numbers: ER16-2416-000.
Applicants: Central Maine Power Company.
Description: Sec. 205(d) Rate Filing: Amended CSIA with Brookfield
White Pine Hydro LLC to be effective 8/1/2016.
Filed Date: 8/12/16.
Accession Number: 20160812-5160.
Comments Due: 5 p.m. ET 9/2/16.
Docket Numbers: ER16-2417-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2016-08-12_Removal of MVP Pricing
Limitation to PJM (ER10-1791) to be effective 7/13/2016.
Filed Date: 8/12/16.
Accession Number: 20160812-5197.
Comments Due: 5 p.m. ET 9/2/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 12, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-19750 Filed 8-17-16; 8:45 am]