El Paso Natural Gas Company, L.L.C.; Notice of Request Under Blanket Authorization, 53137 [2016-19077]
Download as PDF
Federal Register / Vol. 81, No. 155 / Thursday, August 11, 2016 / Notices
Boundless Energy NE., LLC, CityGreen
Transmission, Inc., and Miller Bros. v.
New York Independent System
Operator, Inc., Docket No. EL16–84.
New York Independent System
Operator, Inc., Docket No. ER16–
1785.
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
Dated: August 4, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–19075 Filed 8–10–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–484–000]
sradovich on DSK3GMQ082PROD with NOTICES
El Paso Natural Gas Company, L.L.C.;
Notice of Request Under Blanket
Authorization
Take notice that on July 21, 2016, El
Paso Natural Gas Company, L.L.C.
(EPNG), Post Office Box 1087, Colorado
Springs, Colorado 80944 filed a prior
notice request pursuant to sections
157.205 and 157.208(f) of the
Commission’s regulations under the
Natural Gas Act for authorization to
decrease the Maximum Allowable
Operating Pressure (MAOP) of a
segment of its 6-inch O.D. Hayden Line
(Line No. 2023) located in Gila County,
Arizona. EPNG proposes to decrease the
MAOP of this section of Line No. 2023
from 474 pounds per square inch gauge
(psig) down to 85 psig to align the
MAOP with the existing operations of
Line No. 2023. The proposed MAOP
reduction will not alter the capacity of
EPNG’s system, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to
Francisco Tarin, Director Regulatory
Department, El Paso Natural Gas
Company, L.L.C., Post Office Box 1087,
Colorado Springs, Colorado 80944, or by
calling (719) 667–7517.
VerDate Sep<11>2014
17:44 Aug 10, 2016
Jkt 238001
Any person or the Commission’s staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention. Any person filing to
intervene or the Commission’s staff
may, pursuant to section 157.205 of the
Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with he Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
53137
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: August 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–19077 Filed 8–10–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2197–109]
Alcoa Power Generating Inc., Cube
Yadkin Generation LLC; Notice of
Application for Transfer of License and
Soliciting Comments, Motions To
Intervene, and Protests
On July 25, 2016, Alcoa Power
Generating Inc. (transferor) and Cube
Yadkin Generation LLC (transferee) filed
an application for the transfer of license
of the Yadkin Hydroelectric Project No.
2197. The project is located on the
Yadkin River in Stanly, Montgomery,
Davidson, and Rowan counties, North
Carolina. The project does not occupy
federal lands.
The applicants seek Commission
approval to transfer the license for the
Yadkin Hydroelectric Project from the
transferor to the transferee.
Applicants Contact: For transferor:
Ms. Coralyn M. Benhart, Esq., Alcoa
Inc., 201 Isabella Street, 6E04,
Pittsburgh, PA 15212–5858, Phone:
412–553–4237, Email:
Coralyn.Benhart@alcoa.com and Mr.
David R. Poe, Bracewell LLP, 2001 M
Street NW., Suite 900, Washington, DC
20036, Phone: 202–828–5800, Email:
dave.poe@bracewelllaw.com. For
Transferee: Mr. Eli W.L. Hopson, Cube
Hydro Partners, LLC, 2 Bethesda Metro
Center, Suite 1330, Bethesda, MD
20814, Phone: 240–482–2714, Email:
ehopson@cubehydro.com and Ms. Julia
S. Wood and Ms. Sharon L. White, Van
Ness Feldman, LLP, 1050 Thomas
Jefferson Street NW., Seventh Floor,
Washington, DC 20007, Phone: 202–
298–1800, Email: jsw@vnf.com and slw@
vnf.com.
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 81, Number 155 (Thursday, August 11, 2016)]
[Notices]
[Page 53137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-19077]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP16-484-000]
El Paso Natural Gas Company, L.L.C.; Notice of Request Under
Blanket Authorization
Take notice that on July 21, 2016, El Paso Natural Gas Company,
L.L.C. (EPNG), Post Office Box 1087, Colorado Springs, Colorado 80944
filed a prior notice request pursuant to sections 157.205 and
157.208(f) of the Commission's regulations under the Natural Gas Act
for authorization to decrease the Maximum Allowable Operating Pressure
(MAOP) of a segment of its 6-inch O.D. Hayden Line (Line No. 2023)
located in Gila County, Arizona. EPNG proposes to decrease the MAOP of
this section of Line No. 2023 from 474 pounds per square inch gauge
(psig) down to 85 psig to align the MAOP with the existing operations
of Line No. 2023. The proposed MAOP reduction will not alter the
capacity of EPNG's system, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this Application should be directed to
Francisco Tarin, Director Regulatory Department, El Paso Natural Gas
Company, L.L.C., Post Office Box 1087, Colorado Springs, Colorado
80944, or by calling (719) 667-7517.
Any person or the Commission's staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention. Any person filing to intervene or
the Commission's staff may, pursuant to section 157.205 of the
Commission's Regulations under the NGA (18 CFR 157.205) file a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for protest. If a protest is
filed and not withdrawn within 30 days after the time allowed for
filing a protest, the instant request shall be treated as an
application for authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with he Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file
electronically should submit original and 5 copies of the protest or
intervention to the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426.
Dated: August 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-19077 Filed 8-10-16; 8:45 am]
BILLING CODE 6717-01-P