Notice of Commission Staff Attendance, 53136-53137 [2016-19075]
Download as PDF
53136
Federal Register / Vol. 81, No. 155 / Thursday, August 11, 2016 / Notices
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If we publish and distribute the EA,
copies of the EA will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
would like to remove your name from
the mailing list, please return the
attached Information Request (appendix
B).
sradovich on DSK3GMQ082PROD with NOTICES
Becoming an Intervenor
Once Eastern Shore files its
application with the Commission, you
may want to become an ‘‘intervenor’’
which is an official party to the
Commission’s proceeding. Intervenors
play a more formal role in the process
and are able to file briefs, appear at
hearings, and be heard by the courts if
they choose to appeal the Commission’s
final ruling. An intervenor formally
participates in the proceeding by filing
a request to intervene. Motions to
intervene are more fully described at
https://www.ferc.gov/resources/guides/
how-to/intervene.asp. Instructions for
becoming an intervenor are in the
‘‘Document-less Intervention Guide’’
under the ‘‘e-filing’’ link on the
Commission’s Web site. Please note that
the Commission will not accept requests
for intervenor status at this time. You
must wait until the Commission
receives a formal application for the
project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF16–
7). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
VerDate Sep<11>2014
17:44 Aug 10, 2016
Jkt 238001
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: August 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–19082 Filed 8–10–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
New York Independent System
Operator, Inc.
The New York Independent System
Operator, Inc. Electric System Planning
Working Group Meeting
August 9, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic_
espwg&directory=2016-08-09.
The New York Independent System
Operator, Inc. Business Issues
Committee Meeting
August 17, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?
com=bic&directory=2016-08-17.
The New York Independent System
Operator, Inc. Operating Committee
Meeting
August 18, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=oc
&directory=2016-08-18.
The New York Independent System
Operator, Inc. Joint Electric System
Planning Working Group and
Transmission Planning Advisory
Subcommittee Meeting
August 25, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic_
espwg&directory=2016-08-25.
The New York Independent System
Operator, Inc. Management Committee
Meeting
August 31, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=
mc&directory=2016-08-31.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
New York Independent System
Operator, Inc., Docket No. ER13–102.
New York Independent System
Operator, Inc., Docket No. ER15–
2059.
New York Independent System
Operator, Inc., Docket No. ER13–
1942.
New York Transco, LLC, Docket No.
ER15–572.
New York Independent System
Operator, Inc., Docket No. ER16–966.
New York Independent System
Operator, Inc., Docket No. ER16–
1968.
E:\FR\FM\11AUN1.SGM
11AUN1
Federal Register / Vol. 81, No. 155 / Thursday, August 11, 2016 / Notices
Boundless Energy NE., LLC, CityGreen
Transmission, Inc., and Miller Bros. v.
New York Independent System
Operator, Inc., Docket No. EL16–84.
New York Independent System
Operator, Inc., Docket No. ER16–
1785.
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
Dated: August 4, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–19075 Filed 8–10–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–484–000]
sradovich on DSK3GMQ082PROD with NOTICES
El Paso Natural Gas Company, L.L.C.;
Notice of Request Under Blanket
Authorization
Take notice that on July 21, 2016, El
Paso Natural Gas Company, L.L.C.
(EPNG), Post Office Box 1087, Colorado
Springs, Colorado 80944 filed a prior
notice request pursuant to sections
157.205 and 157.208(f) of the
Commission’s regulations under the
Natural Gas Act for authorization to
decrease the Maximum Allowable
Operating Pressure (MAOP) of a
segment of its 6-inch O.D. Hayden Line
(Line No. 2023) located in Gila County,
Arizona. EPNG proposes to decrease the
MAOP of this section of Line No. 2023
from 474 pounds per square inch gauge
(psig) down to 85 psig to align the
MAOP with the existing operations of
Line No. 2023. The proposed MAOP
reduction will not alter the capacity of
EPNG’s system, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to
Francisco Tarin, Director Regulatory
Department, El Paso Natural Gas
Company, L.L.C., Post Office Box 1087,
Colorado Springs, Colorado 80944, or by
calling (719) 667–7517.
VerDate Sep<11>2014
17:44 Aug 10, 2016
Jkt 238001
Any person or the Commission’s staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention. Any person filing to
intervene or the Commission’s staff
may, pursuant to section 157.205 of the
Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with he Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
53137
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: August 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–19077 Filed 8–10–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2197–109]
Alcoa Power Generating Inc., Cube
Yadkin Generation LLC; Notice of
Application for Transfer of License and
Soliciting Comments, Motions To
Intervene, and Protests
On July 25, 2016, Alcoa Power
Generating Inc. (transferor) and Cube
Yadkin Generation LLC (transferee) filed
an application for the transfer of license
of the Yadkin Hydroelectric Project No.
2197. The project is located on the
Yadkin River in Stanly, Montgomery,
Davidson, and Rowan counties, North
Carolina. The project does not occupy
federal lands.
The applicants seek Commission
approval to transfer the license for the
Yadkin Hydroelectric Project from the
transferor to the transferee.
Applicants Contact: For transferor:
Ms. Coralyn M. Benhart, Esq., Alcoa
Inc., 201 Isabella Street, 6E04,
Pittsburgh, PA 15212–5858, Phone:
412–553–4237, Email:
Coralyn.Benhart@alcoa.com and Mr.
David R. Poe, Bracewell LLP, 2001 M
Street NW., Suite 900, Washington, DC
20036, Phone: 202–828–5800, Email:
dave.poe@bracewelllaw.com. For
Transferee: Mr. Eli W.L. Hopson, Cube
Hydro Partners, LLC, 2 Bethesda Metro
Center, Suite 1330, Bethesda, MD
20814, Phone: 240–482–2714, Email:
ehopson@cubehydro.com and Ms. Julia
S. Wood and Ms. Sharon L. White, Van
Ness Feldman, LLP, 1050 Thomas
Jefferson Street NW., Seventh Floor,
Washington, DC 20007, Phone: 202–
298–1800, Email: jsw@vnf.com and slw@
vnf.com.
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 81, Number 155 (Thursday, August 11, 2016)]
[Notices]
[Pages 53136-53137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-19075]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission's staff may attend the following
meetings related to the transmission planning activities of the New
York Independent System Operator, Inc.
The New York Independent System Operator, Inc. Electric System Planning
Working Group Meeting
August 9, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=bic_espwg&directory=2016-08-09.
The New York Independent System Operator, Inc. Business Issues
Committee Meeting
August 17, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=bic&directory=2016-08-17.
The New York Independent System Operator, Inc. Operating Committee
Meeting
August 18, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=oc&directory=2016-08-18.
The New York Independent System Operator, Inc. Joint Electric System
Planning Working Group and Transmission Planning Advisory Subcommittee
Meeting
August 25, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=bic_espwg&directory=2016-08-25.
The New York Independent System Operator, Inc. Management Committee
Meeting
August 31, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=mc&directory=2016-08-31.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
New York Independent System Operator, Inc., Docket No. ER13-102.
New York Independent System Operator, Inc., Docket No. ER15-2059.
New York Independent System Operator, Inc., Docket No. ER13-1942.
New York Transco, LLC, Docket No. ER15-572.
New York Independent System Operator, Inc., Docket No. ER16-966.
New York Independent System Operator, Inc., Docket No. ER16-1968.
[[Page 53137]]
Boundless Energy NE., LLC, CityGreen Transmission, Inc., and Miller
Bros. v. New York Independent System Operator, Inc., Docket No. EL16-
84.
New York Independent System Operator, Inc., Docket No. ER16-1785.
For more information, contact James Eason, Office of Energy Market
Regulation, Federal Energy Regulatory Commission at (202) 502-8622 or
James.Eason@ferc.gov.
Dated: August 4, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-19075 Filed 8-10-16; 8:45 am]