Notice of Commission Staff Attendance, 52671-52672 [2016-18829]
Download as PDF
Federal Register / Vol. 81, No. 153 / Tuesday, August 9, 2016 / Notices
52671
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
asabaliauskas on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff has preliminarily determined that
the proposal satisfies the requirements
for a qualifying conduit hydropower
facility under 16 U.S.C. 823a, and is
exempted from the licensing
requirements of the FPA.
Comments and Motions to Intervene:
The deadline for filing comments
contesting whether the facility meets the
qualifying criteria is 45 days from the
issuance date of this notice.
The deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
1 18
20:00 Aug 08, 2016
Dated: August 3, 2016.
Kimberly Bose,
Secretary.
[FR Doc. 2016–18827 Filed 8–8–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
CFR 385.2001–2005 (2015).
VerDate Sep<11>2014
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD16–18–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Jkt 238001
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
Y
Y
Y
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
PJM Interconnection, L.L.C. (PJM):
PJM Planning Committee
August 11, 2016, 9:30 a.m.–12:00 p.m.
(EST)
PJM Transmission Expansion Advisory
Committee
August 11, 2016, 11:00 a.m.—3:00 p.m.
(EST)
The above-referenced meetings will
be held at: PJM Conference and Training
Center, PJM Interconnection, 2750
Monroe Boulevard, Audubon, PA
19403.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.pjm.com.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER16–453, PJM
Interconnection, L.L.C. and Northeast
Transmission Development, LLC
Docket No. ER16–736, PJM
Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
Docket No. ER14–1485, PJM
Interconnection, L.L.C.
Docket Nos. ER13–1944, et al., PJM
Interconnection, L.L.C., et al.
Docket No. ER15–1344, PJM
Interconnection, L.L.C.
Docket No. ER15–1387, PJM
Interconnection, L.L.C. and Potomac
Electric Power Company
Docket No. ER15–2562, PJM
Interconnection, L.L.C.
Docket No. ER15–2563, PJM
Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, LLC, et. al. v. PJM
Interconnection, L.L.C.
E:\FR\FM\09AUN1.SGM
09AUN1
52672
Federal Register / Vol. 81, No. 153 / Tuesday, August 9, 2016 / Notices
Docket No. ER15–2114, PJM
Interconnection, L.L.C. and
Transource West Virginia, LLC
Docket No. EL15–79, TransSource, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Delaware Public
Service Commission, et. al., v. PJM
Interconnection, L.L.C., et. al.
Docket No. EL15–67, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER13–198, PJM
Interconnection, L.L.C.
Docket No. ER16–1335, PJM
Interconnection, L.L.C.
Docket No. ER16–1232, PJM
Interconnection, L.L.C.
Docket No. ER16–1499, PJM
Interconnection, L.L.C.
Docket No. ER16–1807, First Energy
Solutions Corp.
Docket No. EL16–96, PJM
Interconnection, L.L.C.
For more information, contact the
following:
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission, (202) 502–
6604, Jonathan.Fernandez@ferc.gov
Alina Halay, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, (202) 502–6474,
Alina.Halay@ferc.gov
Dated: August 3, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–18829 Filed 8–8–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–2293–000]
Dated: August 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Drift Sand Wind Project, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2016–18802 Filed 8–8–16; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of Drift
Sand Wind Project, LLC‘s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
VerDate Sep<11>2014
20:00 Aug 08, 2016
Jkt 238001
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 22,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–2285–000]
Desert Wind Farm LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Desert
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
Wind Farm LLC‘s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 22,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–18801 Filed 8–8–16; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\09AUN1.SGM
09AUN1
Agencies
[Federal Register Volume 81, Number 153 (Tuesday, August 9, 2016)]
[Notices]
[Pages 52671-52672]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-18829]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission's staff may attend the following
meetings related to the transmission planning activities of the PJM
Interconnection, L.L.C. (PJM):
PJM Planning Committee
August 11, 2016, 9:30 a.m.-12:00 p.m. (EST)
PJM Transmission Expansion Advisory Committee
August 11, 2016, 11:00 a.m.--3:00 p.m. (EST)
The above-referenced meetings will be held at: PJM Conference and
Training Center, PJM Interconnection, 2750 Monroe Boulevard, Audubon,
PA 19403.
The above-referenced meetings are open to stakeholders.
Further information may be found at www.pjm.com.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
Docket No. ER16-453, PJM Interconnection, L.L.C. and Northeast
Transmission Development, LLC
Docket No. ER16-736, PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
Docket No. ER14-1485, PJM Interconnection, L.L.C.
Docket Nos. ER13-1944, et al., PJM Interconnection, L.L.C., et al.
Docket No. ER15-1344, PJM Interconnection, L.L.C.
Docket No. ER15-1387, PJM Interconnection, L.L.C. and Potomac Electric
Power Company
Docket No. ER15-2562, PJM Interconnection, L.L.C.
Docket No. ER15-2563, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15-41, Essential Power Rock Springs, LLC, et. al. v. PJM
Interconnection, L.L.C.
[[Page 52672]]
Docket No. ER15-2114, PJM Interconnection, L.L.C. and Transource West
Virginia, LLC
Docket No. EL15-79, TransSource, LLC v. PJM Interconnection, L.L.C.
Docket No. EL15-95, Delaware Public Service Commission, et. al., v. PJM
Interconnection, L.L.C., et. al.
Docket No. EL15-67, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER13-198, PJM Interconnection, L.L.C.
Docket No. ER16-1335, PJM Interconnection, L.L.C.
Docket No. ER16-1232, PJM Interconnection, L.L.C.
Docket No. ER16-1499, PJM Interconnection, L.L.C.
Docket No. ER16-1807, First Energy Solutions Corp.
Docket No. EL16-96, PJM Interconnection, L.L.C.
For more information, contact the following:
Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy
Regulatory Commission, (202) 502-6604, Jonathan.Fernandez@ferc.gov
Alina Halay, Office of Energy Market Regulation, Federal Energy
Regulatory Commission, (202) 502-6474, Alina.Halay@ferc.gov
Dated: August 3, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18829 Filed 8-8-16; 8:45 am]
BILLING CODE 6717-01-P