Staff Notice of Alleged Violations, 52676 [2016-18828]
Download as PDF
asabaliauskas on DSK3SPTVN1PROD with NOTICES
52676
Federal Register / Vol. 81, No. 153 / Tuesday, August 9, 2016 / Notices
Filed Date: 8/1/16.
Accession Number: 20160801–5088.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2345–000.
Applicants: Rumford Power Inc.
Description: § 205(d) Rate Filing:
Amend Market-Based Rate Tariff to be
effective 7/1/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5089.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2346–000.
Applicants: Tiverton Power LLC.
Description: § 205(d) Rate Filing:
Amend Market-Based Rate Tariff to be
effective 7/1/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5090.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2347–000.
Applicants: Bridgeport Energy LLC.
Description: § 205(d) Rate Filing:
Amend Market-Based Rate Tariffs to be
effective 7/1/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5091.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2348–000.
Applicants: Mesquite Solar 3, LLC.
Description: Initial rate filing:
Mesquite Solar 3, LLC LGIA Co-Tenancy
Agreement to be effective 8/5/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5110.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2349–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Service Agreement No. 4504, Queue
Position Z2–081 to be effective 7/1/
2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5111.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2350–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: 2nd
Quarter 2016 Update to OA and RAA
Member Lists to be effective 6/30/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5113.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2351–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 217, Exhibit B.KOF to be
effective 10/1/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5116.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2352–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Union Electric Company.
VerDate Sep<11>2014
20:00 Aug 08, 2016
Jkt 238001
Description: § 205(d) Rate Filing:
2016–08–01_SA 2934 Ameren MissouriCity of Farmington Construction
Agreement to be effective 7/7/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5127.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2353–000.
Applicants: Pacific Gas and Electric
Company.
Description: Notice of Termination of
Small Generator Interconnection Service
Agreement No. 316 of Pacific Gas and
Electric Company.
Filed Date: 8/1/16.
Accession Number: 20160801–5132.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2354–000.
Applicants: PacifiCorp.
Description: Tariff Cancellation:
Termination of Georgia-Pacific E&P
Agmt ? Troutdale Sub to be effective 10/
3/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5158.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2355–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2016–
08–01_RSG Exemptions Compliance
Filing to be effective 8/31/2010.
Filed Date: 8/1/16.
Accession Number: 20160801–5179.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2356–000.
Applicants: SEP II, LLC.
Description: Initial rate filing: SEP II,
LLC Certificate of Concurrence to LGIA
Co-Tenancy Agreement to be effective 8/
5/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5180.
Comments Due: 5 p.m. ET 8/22/16.
Docket Numbers: ER16–2357–000.
Applicants: Emera Energy Services,
Inc.
Description: § 205(d) Rate Filing:
Amend Market-Based Rate Tariff to be
effective 7/1/2016.
Filed Date: 8/1/16.
Accession Number: 20160801–5189.
Comments Due: 5 p.m. ET 8/22/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–18799 Filed 8–8–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Staff Notice of Alleged Violations
Take notice that in a preliminary,
non-public investigation pursuant to 18
CFR part 1b, the staff of the Office of
Enforcement of the Federal Energy
Regulatory Commission (Commission)
has preliminarily determined that
National Energy & Trade, L.P. (National
Energy) violated the Commission’s
Prohibition of Natural Gas Market
Manipulation, 18 CFR 1c.1 (2016).
Staff alleges that National Energy
violated 18 CFR 1c.1 by fraudulently
trading physical basis at Texas Eastern
M3 (Tetco M3) during the January 2012
bidweek to increase the value of its
financial basis position. Specifically,
staff alleges that National Energy
accomplished this fraud by selling
physical basis at Tetco M3 at arbitrarily
low prices early in the morning to
benefit a large short financial basis
position acquired before bidweek, a
large part of which it repurchased after
making its physical basis sales. Staff
also alleges that National Energy
violated 18 CFR 1c.1 by fraudulently
trading physical basis at Henry Hub
during the April 2014 bidweek to
increase the value of its financial
exposure. Specifically, staff alleges that
National Energy accomplished this
fraud by trading physical basis after the
close of the NYMEX solely to benefit
National Energy’s exposure to the Henry
Hub Inside FERC index.
This Notice does not confer a right on
third parties to intervene in the
investigation or any other right with
respect to the investigation.1
Dated: August 3, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–18828 Filed 8–8–16; 8:45 am]
BILLING CODE 6717–01–P
1 Enforcement of Statutes, Regulations, and
Orders, 129 FERC ¶ 61,247 (2009).
E:\FR\FM\09AUN1.SGM
09AUN1
Agencies
[Federal Register Volume 81, Number 153 (Tuesday, August 9, 2016)]
[Notices]
[Page 52676]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-18828]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Staff Notice of Alleged Violations
Take notice that in a preliminary, non-public investigation
pursuant to 18 CFR part 1b, the staff of the Office of Enforcement of
the Federal Energy Regulatory Commission (Commission) has preliminarily
determined that National Energy & Trade, L.P. (National Energy)
violated the Commission's Prohibition of Natural Gas Market
Manipulation, 18 CFR 1c.1 (2016).
Staff alleges that National Energy violated 18 CFR 1c.1 by
fraudulently trading physical basis at Texas Eastern M3 (Tetco M3)
during the January 2012 bidweek to increase the value of its financial
basis position. Specifically, staff alleges that National Energy
accomplished this fraud by selling physical basis at Tetco M3 at
arbitrarily low prices early in the morning to benefit a large short
financial basis position acquired before bidweek, a large part of which
it repurchased after making its physical basis sales. Staff also
alleges that National Energy violated 18 CFR 1c.1 by fraudulently
trading physical basis at Henry Hub during the April 2014 bidweek to
increase the value of its financial exposure. Specifically, staff
alleges that National Energy accomplished this fraud by trading
physical basis after the close of the NYMEX solely to benefit National
Energy's exposure to the Henry Hub Inside FERC index.
This Notice does not confer a right on third parties to intervene
in the investigation or any other right with respect to the
investigation.\1\
---------------------------------------------------------------------------
\1\ Enforcement of Statutes, Regulations, and Orders, 129 FERC ]
61,247 (2009).
Dated: August 3, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18828 Filed 8-8-16; 8:45 am]
BILLING CODE 6717-01-P