The Domestic and Foreign Missionary Society of the Protestant Episcopal Diocese of Alabama; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 51874 [2016-18579]

Download as PDF 51874 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14793–000] The Domestic and Foreign Missionary Society of the Protestant Episcopal Diocese of Alabama; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: 10 Megawatt Exemption. b. Project No.: 14793–000. c. Date filed: July 12, 2016. d. Applicant: The Domestic and Foreign Missionary Society of the Protestant Episcopal Diocese of Alabama. e. Name of Project: Camp McDowell Project. f. Location: On Clear Creek, near Nauvoo in Winston County, Alabama. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Frazier Christy, 3621 Kingshill Road, Birmingham, Alabama 35223. i. FERC Contact: Michael Spencer, (202) 502–6093, michael.spencer@ ferc.gov. j. This application is not ready for environmental analysis at this time. k. The proposed project would consist of: (1) an Archimedean Screw installed in the spillway of the dam; (2) a 10 acre reservoir; (3) a powerhouse containing a generator with a total installed capacity of 140 kilowatts; and (4) a transmission line. The project is estimated to generate an average of 950 megawatt-hours annually. l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in item (h) above. m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis ................................................................................................ Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .............................................................. Commission issues EA ..................................................................................................................................................................... Comments on EA ............................................................................................................................................................................. October 2016. December 2016. June 2017. July 2017. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: July 27, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–18579 Filed 8–4–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK3G9T082PROD with NOTICES [Docket No. PF14–21–000] Alaska Gasline Development Corporation, BP Alaska LNG LLC, Conoco Phillips Alaska LNG Company, ExxonMobil Alaska LNG LLC; Supplemental Notice Requesting Comments on the Denali National Park and Preserve Alterative for the Planned Alaska LNG Project As previously noticed on March 4, 2015, the staff of the Federal Energy Regulatory Commission (FERC or Commission) is preparing an environmental impact statement (EIS) that will discuss the environmental VerDate Sep<11>2014 17:42 Aug 04, 2016 Jkt 238001 impacts of the Alaska LNG Project that could result from construction and operation of facilities by Alaska Gasline Development Corporation; BP Alaska LNG LLC; Conoco Phillips Alaska LNG Company; and ExxonMobil Alaska LNG LLC (Applicants) in Alaska. This notice explains the additional scoping process that will be used to gather input from the public and interested agencies on a route alternative to be evaluated for crossing the Denali National Park and Preserve (DNPP). The route currently planned by Alaska LNG is closely aligned with the Parks Highway, but deviates from the highway where the Parks Highway passes through the DNPP entrance area (see figure in appendix 1.1) In response to scoping comments, and in working with federal and state regulating agencies, as well as the local communities, Alaska LNG has identified an alternative route (the DNPP Alternative) that passes directly through 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 the DNPP entrance area and is closely aligned with the Parks Highway (see figure in appendix 1). In this general area, the planned route would be 8.05 miles long and not enter the DNPP, while the corresponding segment of the DNPP Alternative would be 8.50 miles long (6.16 miles of which would pass through the DNPP). This Supplemental Notice announces the opening of a limited scoping period to gather input from the public and interested agencies on the DNPP Alternative route. You can make a difference by providing us with your specific comments or concerns about the DNPP Alternative route. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EIS. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before September 25, 2016. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should E:\FR\FM\05AUN1.SGM 05AUN1

Agencies

[Federal Register Volume 81, Number 151 (Friday, August 5, 2016)]
[Notices]
[Page 51874]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-18579]



[[Page 51874]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14793-000]


The Domestic and Foreign Missionary Society of the Protestant 
Episcopal Diocese of Alabama; Notice of Application Tendered for Filing 
With the Commission and Establishing Procedural Schedule for Licensing 
and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: 10 Megawatt Exemption.
    b. Project No.: 14793-000.
    c. Date filed: July 12, 2016.
    d. Applicant: The Domestic and Foreign Missionary Society of the 
Protestant Episcopal Diocese of Alabama.
    e. Name of Project: Camp McDowell Project.
    f. Location: On Clear Creek, near Nauvoo in Winston County, 
Alabama. The project does not affect federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Frazier Christy, 3621 Kingshill Road, 
Birmingham, Alabama 35223.
    i. FERC Contact: Michael Spencer, (202) 502-6093, 
michael.spencer@ferc.gov.
    j. This application is not ready for environmental analysis at this 
time.
    k. The proposed project would consist of: (1) an Archimedean Screw 
installed in the spillway of the dam; (2) a 10 acre reservoir; (3) a 
powerhouse containing a generator with a total installed capacity of 
140 kilowatts; and (4) a transmission line. The project is estimated to 
generate an average of 950 megawatt-hours annually.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at https://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in item (h) above.
    m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready     October 2016.
 for Environmental Analysis.
Filing of recommendations, preliminary   December 2016.
 terms and conditions, and fishway
 prescriptions.
Commission issues EA...................  June 2017.
Comments on EA.........................  July 2017.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: July 27, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18579 Filed 8-4-16; 8:45 am]