Otter Tail Power Company; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests, 51438-51439 [2016-18490]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
51438
Federal Register / Vol. 81, No. 150 / Thursday, August 4, 2016 / Notices
Accession Number: 20160728–5043.
Comments Due: 5 p.m. ET 8/18/16.
Docket Numbers: ER16–2301–000.
Applicants: Chaves County Solar,
LLC.
Description: Baseline eTariff Filing:
Chaves County Solar, LLC, Filing of
Shared Facilities Agreement to be
effective 9/26/2016.
Filed Date: 7/28/16.
Accession Number: 20160728–5053.
Comments Due: 5 p.m. ET 8/18/16.
Docket Numbers: ER16–2302–000.
Applicants: NorthWestern
Corporation.
Description: Section 205(d) Rate
Filing: SA 784—Agreement with CHS
Inc. dba CHS Big Sky re 69kV reroute
to be effective 7/29/2016.
Filed Date: 7/28/16.
Accession Number: 20160728–5060.
Comments Due: 5 p.m. ET 8/18/16.
Docket Numbers: ER16–2303–000.
Applicants: Pacific Gas and Electric
Company.
Description: Section 205(d) Rate
Filing: Quarterly Filing of City and
County of San Francisco’s WDT SA 275
for Q2 2016 to be effective 6/30/2016.
Filed Date: 7/28/16.
Accession Number: 20160728–5062.
Comments Due: 5 p.m. ET 8/18/16.
Docket Numbers: ER16–2304–000.
Applicants: Duke Energy Florida,
LLC.
Description: Section 205(d) Rate
Filing: DEF Telogia Power and G2
Energy GIAs to be effective 9/26/2016.
Filed Date: 7/28/16.
Accession Number: 20160728–5072.
Comments Due: 5 p.m. ET 8/18/16.
Docket Numbers: ER16–2305–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: Amendment to Original Service
Agreement No. 3771, Queue Position
Y1–033 to be effective 2/4/2014.
Filed Date: 7/28/16.
Accession Number: 20160728–5091.
Comments Due: 5 p.m. ET 8/18/16.
Docket Numbers: ER16–2306–000.
Applicants: Southern California
Edison Company.
Description: Section 205(d) Rate
Filing: SCE Amendments to WDAT GIP
to be effective 7/29/2016.
Filed Date: 7/28/16.
Accession Number: 20160728–5116.
Comments Due: 5 p.m. ET 8/18/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
VerDate Sep<11>2014
18:12 Aug 03, 2016
Jkt 238001
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 28, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–18456 Filed 8–3–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10853–021]
Otter Tail Power Company; Notice of
Intent To File License Application,
Filing of Pre-Application Document
(PAD), Commencement of Pre-Filing
Process, and Scoping; Request for
Comments on the PAD and Scoping
Document, and Identification of Issues
and Associated Study Requests
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process.
b. Project No.: 10853–021.
c. Date Filed: June 3, 2016.
d. Submitted by: Otter Tail Power
Company.
e. Name of Project: Otter Tail River
Hydroelectric Project.
f. Location: The Otter Tail River
Hydroelectric Project consists of five
developments on the Otter Tail River
that start in the Township of Friberg,
Minnesota and extend downstream
(south) of the City of Fergus Falls,
Minnesota. The project does not occupy
federal land.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact:
Michael Olson, Principal Engineer,
Otter Tail Power Company, 215 South
Cascade Street, Fergus Falls, Minnesota
56537; (218) 739–8411; mjolson@
otpco.com.
i. FERC Contact: Patrick Ely at (202)
502–8570 or email at patrick.ely@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in paragraph o below.
Cooperating agencies should note the
Commission’s policy that agencies that
cooperate in the preparation of the
environmental document cannot also
intervene. See 94 FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402 and (b) the State Historic
Preservation Officer, as required by
section 106, National Historic
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Otter Tail Power Company as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
106 of the National Historic
Preservation Act.
m. Otter Tail Power Company filed
with the Commission a Pre-Application
Document (PAD; including a proposed
process plan and schedule), pursuant to
18 CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. With this notice, we are soliciting
comments on the PAD and
Commission’s staff Scoping Document 1
(SD1), as well as study requests. All
comments on the PAD and SD1, and
study requests should be sent to the
address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
E:\FR\FM\04AUN1.SGM
04AUN1
Federal Register / Vol. 81, No. 150 / Thursday, August 4, 2016 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application must be filed
with the Commission.
The Commission strongly encourages
electronic filing. Please file all
documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–10853–021.
All filings with the Commission must
bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by October 3, 2016.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
meeting will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or EIS is issued by the Commission.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Evening Scoping Meeting
Date and Time: Tuesday, August 30,
2016 at 6:00 p.m.
VerDate Sep<11>2014
18:12 Aug 03, 2016
Jkt 238001
51439
Location: Bigwood Event Center, 925
Western Avenue, Fergus Falls,
Minnesota 56537.
Phone Number: (218) 739–2211.
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in
paragraph n of this document.
Daytime Scoping Meeting
Date and Time: Wednesday, August
31, 2016 at 9:00 a.m.
Location: Bigwood Event Center, 925
Western Avenue, Fergus Falls,
Minnesota 56537.
Phone Number: (218) 739–2211.
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the Web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Meeting Procedures
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Tuesday, August 30, 2016,
starting at 9:00 a.m. All participants
should meet at Otter Tail Power
Company, located at 215 South Cascade
Street, Fergus Falls, Minnesota 56537.
All participants are responsible for their
own transportation. Please notify Sarah
Casey at 218–739–8694, or scasey@
otpco.com by August 25, 2016, if you
plan to attend the environmental site
review.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: July 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–18490 Filed 8–3–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL16–89–000]
Virginia Electric and Power Company;
Notice of Institution of Section 206
Proceeding and Refund Effective Date
On July 28, 2016, the Commission
issued an order in Docket No. EL16–89–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into the justness and reasonableness of
certain aspects of Virginia Electric and
Power Company’s Reactive Service
rates. Virginia Electric and Power
Company, 156 FERC ¶ 61,072 (2016).
The refund effective date in Docket
No. EL16–89–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Dated: July 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–18495 Filed 8–3–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–2201–000]
Antelope DSR 1, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Antelope DSR 1, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
E:\FR\FM\04AUN1.SGM
04AUN1
Agencies
[Federal Register Volume 81, Number 150 (Thursday, August 4, 2016)]
[Notices]
[Pages 51438-51439]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-18490]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10853-021]
Otter Tail Power Company; Notice of Intent To File License
Application, Filing of Pre-Application Document (PAD), Commencement of
Pre-Filing Process, and Scoping; Request for Comments on the PAD and
Scoping Document, and Identification of Issues and Associated Study
Requests
a. Type of Filing: Notice of Intent to File License Application for
a New License and Commencing Pre-filing Process.
b. Project No.: 10853-021.
c. Date Filed: June 3, 2016.
d. Submitted by: Otter Tail Power Company.
e. Name of Project: Otter Tail River Hydroelectric Project.
f. Location: The Otter Tail River Hydroelectric Project consists of
five developments on the Otter Tail River that start in the Township of
Friberg, Minnesota and extend downstream (south) of the City of Fergus
Falls, Minnesota. The project does not occupy federal land.
g. Filed Pursuant to: 18 CFR part 5 of the Commission's
Regulations.
h. Potential Applicant Contact: Michael Olson, Principal Engineer,
Otter Tail Power Company, 215 South Cascade Street, Fergus Falls,
Minnesota 56537; (218) 739-8411; mjolson@otpco.com.
i. FERC Contact: Patrick Ely at (202) 502-8570 or email at
patrick.ely@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in paragraph o below. Cooperating agencies should
note the Commission's policy that agencies that cooperate in the
preparation of the environmental document cannot also intervene. See 94
FERC ] 61,076 (2001).
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under
section 7 of the Endangered Species Act and the joint agency
regulations thereunder at 50 CFR part 402 and (b) the State Historic
Preservation Officer, as required by section 106, National Historic
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Otter Tail Power Company as
the Commission's non-federal representative for carrying out informal
consultation, pursuant to section 7 of the Endangered Species Act and
section 106 of the National Historic Preservation Act.
m. Otter Tail Power Company filed with the Commission a Pre-
Application Document (PAD; including a proposed process plan and
schedule), pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. With this notice, we are soliciting comments on the PAD and
Commission's staff Scoping Document 1 (SD1), as well as study requests.
All comments on the PAD and SD1, and study requests should be sent to
the address above in paragraph h. In addition, all comments on the PAD
and SD1, study requests, requests for
[[Page 51439]]
cooperating agency status, and all communications to and from
Commission staff related to the merits of the potential application
must be filed with the Commission.
The Commission strongly encourages electronic filing. Please file
all documents using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426. The first page of any filing
should include docket number P-10853-021.
All filings with the Commission must bear the appropriate heading:
``Comments on Pre-Application Document,'' ``Study Requests,''
``Comments on Scoping Document 1,'' ``Request for Cooperating Agency
Status,'' or ``Communications to and from Commission Staff.'' Any
individual or entity interested in submitting study requests,
commenting on the PAD or SD1, and any agency requesting cooperating
status must do so by October 3, 2016.
p. Although our current intent is to prepare an environmental
assessment (EA), there is the possibility that an Environmental Impact
Statement (EIS) will be required. Nevertheless, this meeting will
satisfy the NEPA scoping requirements, irrespective of whether an EA or
EIS is issued by the Commission.
Scoping Meetings
Commission staff will hold two scoping meetings in the vicinity of
the project at the time and place noted below. The daytime meeting will
focus on resource agency, Indian tribes, and non-governmental
organization concerns, while the evening meeting is primarily for
receiving input from the public. We invite all interested individuals,
organizations, and agencies to attend one or both of the meetings, and
to assist staff in identifying particular study needs, as well as the
scope of environmental issues to be addressed in the environmental
document. The times and locations of these meetings are as follows:
Evening Scoping Meeting
Date and Time: Tuesday, August 30, 2016 at 6:00 p.m.
Location: Bigwood Event Center, 925 Western Avenue, Fergus Falls,
Minnesota 56537.
Phone Number: (218) 739-2211.
Daytime Scoping Meeting
Date and Time: Wednesday, August 31, 2016 at 9:00 a.m.
Location: Bigwood Event Center, 925 Western Avenue, Fergus Falls,
Minnesota 56537.
Phone Number: (218) 739-2211.
Scoping Document 1 (SD1), which outlines the subject areas to be
addressed in the environmental document, was mailed to the individuals
and entities on the Commission's mailing list. Copies of SD1 will be
available at the scoping meetings, or may be viewed on the Web at
https://www.ferc.gov, using the ``eLibrary'' link. Follow the directions
for accessing information in paragraph n. Based on all oral and written
comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a
revised process plan and schedule, as well as a list of issues,
identified through the scoping process.
Environmental Site Review
The potential applicant and Commission staff will conduct an
Environmental Site Review of the project on Tuesday, August 30, 2016,
starting at 9:00 a.m. All participants should meet at Otter Tail Power
Company, located at 215 South Cascade Street, Fergus Falls, Minnesota
56537. All participants are responsible for their own transportation.
Please notify Sarah Casey at 218-739-8694, or scasey@otpco.com by
August 25, 2016, if you plan to attend the environmental site review.
Meeting Objectives
At the scoping meetings, staff will: (1) Initiate scoping of the
issues; (2) review and discuss existing conditions and resource
management objectives; (3) review and discuss existing information and
identify preliminary information and study needs; (4) review and
discuss the process plan and schedule for pre-filing activity that
incorporates the time frames provided for in Part 5 of the Commission's
regulations and, to the extent possible, maximizes coordination of
federal, state, and tribal permitting and certification processes; and
(5) discuss the appropriateness of any federal or state agency or
Indian tribe acting as a cooperating agency for development of an
environmental document.
Meeting participants should come prepared to discuss their issues
and/or concerns. Please review the PAD in preparation for the scoping
meetings. Directions on how to obtain a copy of the PAD and SD1 are
included in paragraph n of this document.
Meeting Procedures
The meetings will be recorded by a stenographer and will be placed
in the public records of the project.
Dated: July 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18490 Filed 8-3-16; 8:45 am]
BILLING CODE 6717-01-P