New England Hydropower Company, LLC, Hanover Pond Hydro, LLC; Notice of Transfer of Exemption, 51196 [2016-18359]
Download as PDF
51196
Federal Register / Vol. 81, No. 149 / Wednesday, August 3, 2016 / Notices
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
q. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
informed the Commission that the
exemption from licensing for the
Hanover Pond Dam Hydroelectric
Project No. 14550, originally issued May
19, 2016 1 has been transferred to
Hanover Pond Hydro, LLC. The project
is located on the Quinnipiac River in
New Haven County, Connecticut. The
transfer of an exemption does not
require Commission approval.
2. Hanover Pond Hydro, LLC is now
the exemptee of the Hanover Pond Dam
Hydroelectric Project, No. 14550. All
correspondence should be forwarded to:
Mr. Michael C. Kerr, CEO, Hanover
Pond Hydro, LLC, 100 Cummings
Center Drive, Suite 428N, Beverly, MA
01915.
Dated: July 28, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–18359 Filed 8–2–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Dated: July 28, 2016.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2016–18362 Filed 8–2–16; 8:45 am]
[Docket No. CD16–16–000]
BILLING CODE 6717–01–P
Metropolitan District; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14550–001]
New England Hydropower Company,
LLC, Hanover Pond Hydro, LLC; Notice
of Transfer of Exemption
1. By letter filed July 20, 2016, New
England Hydropower Company, LLC
of 2013 (HREA). The proposed
Barkhamsted Transmission Hydro No. 1
Project would have an installed capacity
of 250 kilowatts (kW) and would be
located at a 48-inch-diameter gravity
pressure raw water supply pipe. The
project would be located near the City
of New Hartford in Lichfield County,
Connecticut.
Applicant Contact: Scott Jellison,
Metropolitan District, 555 Main Street,
Hartford, CT 06142, Phone No. (860)
278–7850, Ext 3522.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
250-kW turbine replacing the existing
booster pump (which is unused) in the
Puddletown booster pump station and
(2) appurtenant facilities. The proposed
project would have an estimated annual
generating capacity of 1,475 megawatthours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
On July 22, 2016, the Metropolitan
District filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
asabaliauskas on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(i), as amended by HREA
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff has preliminarily determined that
the proposal satisfies the requirements
for a qualifying conduit hydropower
facility under 16 U.S.C. 823a, and is
exempted from the licensing
requirements of the FPA.
1 Order Granting Exemption From Licensing (10
MW or Less), 155 FERC ¶ 62,132 (2016).
VerDate Sep<11>2014
18:21 Aug 02, 2016
Jkt 238001
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
E:\FR\FM\03AUN1.SGM
03AUN1
Y
Y
Y
Agencies
[Federal Register Volume 81, Number 149 (Wednesday, August 3, 2016)]
[Notices]
[Page 51196]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-18359]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14550-001]
New England Hydropower Company, LLC, Hanover Pond Hydro, LLC;
Notice of Transfer of Exemption
1. By letter filed July 20, 2016, New England Hydropower Company,
LLC informed the Commission that the exemption from licensing for the
Hanover Pond Dam Hydroelectric Project No. 14550, originally issued May
19, 2016 \1\ has been transferred to Hanover Pond Hydro, LLC. The
project is located on the Quinnipiac River in New Haven County,
Connecticut. The transfer of an exemption does not require Commission
approval.
---------------------------------------------------------------------------
\1\ Order Granting Exemption From Licensing (10 MW or Less), 155
FERC ] 62,132 (2016).
---------------------------------------------------------------------------
2. Hanover Pond Hydro, LLC is now the exemptee of the Hanover Pond
Dam Hydroelectric Project, No. 14550. All correspondence should be
forwarded to: Mr. Michael C. Kerr, CEO, Hanover Pond Hydro, LLC, 100
Cummings Center Drive, Suite 428N, Beverly, MA 01915.
Dated: July 28, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18359 Filed 8-2-16; 8:45 am]