Combined Notice of Filings #2, 48782-48783 [2016-17526]
Download as PDF
srobinson on DSK5SPTVN1PROD with NOTICES
48782
Federal Register / Vol. 81, No. 143 / Tuesday, July 26, 2016 / Notices
Borough, Alaska. The proposed project
would occupy 1,741.3 acres of federal
land within the Chugach National
Forest managed by the U.S. Forest
Service.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mikel Salzetti,
Manager of Fuel Supply & Renewable
Energy Development, 280 Airport Way,
Kenai, AK 99611. (907) 283–2375.
i. FERC Contact: Kenneth Hogan,
(202) 502–8434; Kenneth.Hogan@
ferc.gov.
j. Deadline for filing motions to
intervene and protests and requests for
cooperating agency status: 60 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file filing
motions to intervene and protests and
requests for cooperating agency status
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13212–005.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The proposed Grant Lake
Hydroelectric Project would consist of:
(1) An intake structure within Grant
Lake; (2) a 3,300-foot-long water
conveyance; (3) a 72-inch-diameter, 150feet-long, welded steel penstock; (4) a
power house containing two 2.5
megawatt Francis turbine/generator
units; (5) a 95-foot-long open channel
tailrace; (6) a 3.6-acre tailrace detention
pond; (6) a 1.1-mile-long, 115-kilovolt
transmission line; and (7) appurtenant
facilities. The project is estimated to
generate an average of 18,600 megawatt
hours (MWh) annually.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
VerDate Sep<11>2014
20:28 Jul 25, 2016
Jkt 238001
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Dated: July 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–17521 Filed 7–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–128–000.
Applicants: Solverde 1, LLC.
Description: Solverde 1 Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 7/15/16.
Accession Number: 20160715–5247.
Comments Due: 5 p.m. ET 8/5/16.
Docket Numbers: EG16–129–000.
Applicants: Antelope DSR 1, LLC.
Description: Antelope DSR 1 Notice of
Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 7/15/16.
Accession Number: 20160715–5248.
Comments Due: 5 p.m. ET 8/5/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2239–004.
Applicants: NextEra Energy
Transmission West, LLC.
Description: Compliance filing:
NextEra Energy Transmission West, LLC
Compliance Filing to be effective 10/20/
2015.
Filed Date: 7/18/16.
Accession Number: 20160718–5133.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–2194–000.
Applicants: Clinton Battery Utility,
LLC.
Description: Baseline eTariff Filing:
Clinton Battery Utility, LLC MBR
Application to be effective 8/15/2016.
Filed Date: 7/14/16.
Accession Number: 20160714–5175.
Comments Due: 5 p.m. ET 8/4/16.
Docket Numbers: ER16–2224–000.
Applicants: Solverde 1, LLC.
Description: Baseline eTariff Filing:
Solverde 1, LLC MBR Tariff to be
effective 7/19/2016.
Filed Date: 7/18/16.
E:\FR\FM\26JYN1.SGM
26JYN1
srobinson on DSK5SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 143 / Tuesday, July 26, 2016 / Notices
Accession Number: 20160718–5074.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–2225–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2016–
07–18 RSG Rhg Compliance Filing to be
effective 4/1/2011.
Filed Date: 7/18/16.
Accession Number: 20160718–5093.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–2226–000.
Applicants: McHenry Battery Storage,
LLC.
Description: Baseline eTariff Filing:
McHenry Battery Storage Initial
Baseline MBR Application & Notice
Waiver Request to be effective 7/19/
2016.
Filed Date: 7/18/16.
Accession Number: 20160718–5097.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–2227–000.
Applicants: Kelly Creek Wind, LLC.
Description: Baseline eTariff Filing:
Kelly Creek Wind Initial Baseline MBR
Application Filing to be effective 9/17/
2016.
Filed Date: 7/18/16.
Accession Number: 20160718–5132.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–2228–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
3354, Queue No. X2–054 to be effective
9/13/2016.
Filed Date: 7/18/16.
Accession Number: 20160718–5140.
Comments Due: 5 p.m. ET 8/8/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. Cp16–478–000]
[Project No. 9842–006]
Mr. Ray F. Ward; Notice Of Availability
Of Draft Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47879), the Office of Energy
Projects has reviewed the application
for a new license for the Ward Mill
Hydroelectric Project, located on the
Watauga River near Boone, Watauga
County, North Carolina, and has
prepared a draft Environmental
Assessment (draft EA) for the project.
The project would not occupy federal
land.
In the draft EA, Commission staff
analyze the potential environmental
effects of relicensing the project and
conclude that continued project
operation under a new license, with
appropriate measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the draft EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free number at 1–866–
208–3676, or for TTY, 202–502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, please
contact Adam Peer by telephone at (202)
502–8449 or by email at Adam.Peer@
ferc.gov.
Dated: July 18, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–17520 Filed 7–25–16; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2016–17526 Filed 7–25–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:28 Jul 25, 2016
Jkt 238001
48783
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Gulf South Pipeline Company, LP;
Notice of Application
Take notice that on July 11, 2016, Gulf
South Pipeline Company, LP (Gulf
South), 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, filed an
application pursuant to section 7(c) of
the Natural Gas Act (NGA) requesting
authorization to construct and operate
its St. Charles Parish Expansion Project
to provide 133,333 dekatherms per day
to serve Entergy Louisiana, LLC.
Specifically, Gulf South proposes to
construct: (i) A new 5,000 horsepower
compressor station near Montz,
Louisiana (Montz Compressor Station);
and (ii) approximately 900 ft of new 16inch-diameter pipeline, all facilities
located in St. Charles and St. John the
Baptist Parishes, Louisiana. Gulf South
estimates the cost of the St. Charles
Parish Expansion Project to be
$29,721,360, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application may be directed to J. Kyle
Stephens, Vice President of Regulatory
Affairs, Gulf South Pipeline Company,
LP, 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, by telephone at
(713) 479–8252, by facsimile at (713)
479–1745 or by email to kyle.stephens@
bwpmlp.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice, the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
E:\FR\FM\26JYN1.SGM
26JYN1
Agencies
[Federal Register Volume 81, Number 143 (Tuesday, July 26, 2016)]
[Notices]
[Pages 48782-48783]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-17526]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG16-128-000.
Applicants: Solverde 1, LLC.
Description: Solverde 1 Notice of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 7/15/16.
Accession Number: 20160715-5247.
Comments Due: 5 p.m. ET 8/5/16.
Docket Numbers: EG16-129-000.
Applicants: Antelope DSR 1, LLC.
Description: Antelope DSR 1 Notice of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 7/15/16.
Accession Number: 20160715-5248.
Comments Due: 5 p.m. ET 8/5/16.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-2239-004.
Applicants: NextEra Energy Transmission West, LLC.
Description: Compliance filing: NextEra Energy Transmission West,
LLC Compliance Filing to be effective 10/20/2015.
Filed Date: 7/18/16.
Accession Number: 20160718-5133.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16-2194-000.
Applicants: Clinton Battery Utility, LLC.
Description: Baseline eTariff Filing: Clinton Battery Utility, LLC
MBR Application to be effective 8/15/2016.
Filed Date: 7/14/16.
Accession Number: 20160714-5175.
Comments Due: 5 p.m. ET 8/4/16.
Docket Numbers: ER16-2224-000.
Applicants: Solverde 1, LLC.
Description: Baseline eTariff Filing: Solverde 1, LLC MBR Tariff to
be effective 7/19/2016.
Filed Date: 7/18/16.
[[Page 48783]]
Accession Number: 20160718-5074.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16-2225-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2016-07-18 RSG Rhg Compliance
Filing to be effective 4/1/2011.
Filed Date: 7/18/16.
Accession Number: 20160718-5093.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16-2226-000.
Applicants: McHenry Battery Storage, LLC.
Description: Baseline eTariff Filing: McHenry Battery Storage
Initial Baseline MBR Application & Notice Waiver Request to be
effective 7/19/2016.
Filed Date: 7/18/16.
Accession Number: 20160718-5097.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16-2227-000.
Applicants: Kelly Creek Wind, LLC.
Description: Baseline eTariff Filing: Kelly Creek Wind Initial
Baseline MBR Application Filing to be effective 9/17/2016.
Filed Date: 7/18/16.
Accession Number: 20160718-5132.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16-2228-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA SA
No. 3354, Queue No. X2-054 to be effective 9/13/2016.
Filed Date: 7/18/16.
Accession Number: 20160718-5140.
Comments Due: 5 p.m. ET 8/8/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-17526 Filed 7-25-16; 8:45 am]