Gulf South Pipeline Company, LP; Notice of Application, 48783-48784 [2016-17522]
Download as PDF
srobinson on DSK5SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 143 / Tuesday, July 26, 2016 / Notices
Accession Number: 20160718–5074.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–2225–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2016–
07–18 RSG Rhg Compliance Filing to be
effective 4/1/2011.
Filed Date: 7/18/16.
Accession Number: 20160718–5093.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–2226–000.
Applicants: McHenry Battery Storage,
LLC.
Description: Baseline eTariff Filing:
McHenry Battery Storage Initial
Baseline MBR Application & Notice
Waiver Request to be effective 7/19/
2016.
Filed Date: 7/18/16.
Accession Number: 20160718–5097.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–2227–000.
Applicants: Kelly Creek Wind, LLC.
Description: Baseline eTariff Filing:
Kelly Creek Wind Initial Baseline MBR
Application Filing to be effective 9/17/
2016.
Filed Date: 7/18/16.
Accession Number: 20160718–5132.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–2228–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
3354, Queue No. X2–054 to be effective
9/13/2016.
Filed Date: 7/18/16.
Accession Number: 20160718–5140.
Comments Due: 5 p.m. ET 8/8/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. Cp16–478–000]
[Project No. 9842–006]
Mr. Ray F. Ward; Notice Of Availability
Of Draft Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47879), the Office of Energy
Projects has reviewed the application
for a new license for the Ward Mill
Hydroelectric Project, located on the
Watauga River near Boone, Watauga
County, North Carolina, and has
prepared a draft Environmental
Assessment (draft EA) for the project.
The project would not occupy federal
land.
In the draft EA, Commission staff
analyze the potential environmental
effects of relicensing the project and
conclude that continued project
operation under a new license, with
appropriate measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the draft EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free number at 1–866–
208–3676, or for TTY, 202–502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, please
contact Adam Peer by telephone at (202)
502–8449 or by email at Adam.Peer@
ferc.gov.
Dated: July 18, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–17520 Filed 7–25–16; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2016–17526 Filed 7–25–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:28 Jul 25, 2016
Jkt 238001
48783
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Gulf South Pipeline Company, LP;
Notice of Application
Take notice that on July 11, 2016, Gulf
South Pipeline Company, LP (Gulf
South), 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, filed an
application pursuant to section 7(c) of
the Natural Gas Act (NGA) requesting
authorization to construct and operate
its St. Charles Parish Expansion Project
to provide 133,333 dekatherms per day
to serve Entergy Louisiana, LLC.
Specifically, Gulf South proposes to
construct: (i) A new 5,000 horsepower
compressor station near Montz,
Louisiana (Montz Compressor Station);
and (ii) approximately 900 ft of new 16inch-diameter pipeline, all facilities
located in St. Charles and St. John the
Baptist Parishes, Louisiana. Gulf South
estimates the cost of the St. Charles
Parish Expansion Project to be
$29,721,360, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application may be directed to J. Kyle
Stephens, Vice President of Regulatory
Affairs, Gulf South Pipeline Company,
LP, 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, by telephone at
(713) 479–8252, by facsimile at (713)
479–1745 or by email to kyle.stephens@
bwpmlp.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice, the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
E:\FR\FM\26JYN1.SGM
26JYN1
srobinson on DSK5SPTVN1PROD with NOTICES
48784
Federal Register / Vol. 81, No. 143 / Tuesday, July 26, 2016 / Notices
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
five copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
VerDate Sep<11>2014
20:28 Jul 25, 2016
Jkt 238001
LLC, Essential Power Rock Springs,
LLC, James River Genco, LLC,
Lakewood Cogeneration, L.P.,
Portsmouth Genco, LLC, Red Oak
Power, LLC, Rhode Island State Energy
Center, LP, SEPG Energy Marketing
Services, LLC.
Description: Notice of Non-Material
Change in Status of Cogentrix Virginia
Financing Holding Company, LLC, et al.
Filed Date: 7/18/16.
Accession Number: 20160718–5201.
Comments Due: 5 p.m. ET 8/8/16.
Docket Numbers: ER16–1483–001.
Applicants: California Independent
System Operator Corporation.
Description: Tariff Amendment:
2016–07–18 Frequency Response
Deficiency Letter Response to be
effective 8/15/2016.
Dated: July 18, 2016.
Filed Date: 7/18/16.
Kimberly D. Bose,
Accession Number: 20160718–5169.
Secretary.
Comments Due: 5 p.m. ET 8/8/16.
[FR Doc. 2016–17522 Filed 7–25–16; 8:45 am]
Docket Numbers: ER16–1791–001.
BILLING CODE 6717–01–P
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
DEPARTMENT OF ENERGY
Amendment to 5/26/16 Filing of
Revisions to MISO/PJM JOA re CMP–
Federal Energy Regulatory
ICP Baseline to be effective 7/25/2016.
Commission
Filed Date: 7/19/16.
Accession Number: 20160719–5029.
Combined Notice of Filings #1
Comments Due: 5 p.m. ET 8/9/16.
Take notice that the Commission
Docket Numbers: ER16–2229–000.
received the following electric rate
Applicants: NorthWestern
filings:
Corporation.
Docket Numbers: ER10–1257–006;
Description: § 205(d) Rate Filing: SA
ER10–1258–006; ER11–3117–002.
642 3rd Rev—NITSA with General Mills
Applicants: Wabash Valley Power
Operations, LLC to be effective 9/1/
Association, Inc., Wabash Valley Energy 2016.
Marketing, Inc., Lively Grove Energy
Filed Date: 7/18/16.
Partners, LLC.
Accession Number: 20160718–5160.
Description: Notice of Change of
Comments Due: 5 p.m. ET 8/8/16.
Status of Wabash Valley Power
Docket Numbers: ER16–2230–000.
Association, et al.
Applicants: PJM Interconnection,
Filed Date: 7/18/16.
L.L.C.
Accession Number: 20160718–5219.
Description: § 205(d) Rate Filing:
Comments Due: 5 p.m. ET 8/8/16.
Amendment to ISA No. 3388 and ICSA
Docket Numbers: ER10–2575–008.
No. 3409 Queue Position #T107, X3–004
Applicants: Watson Cogeneration
& Y2–01 to be effective 11/20/2012.
Filed Date: 7/19/16.
Company.
Accession Number: 20160719–5023.
Description: Updated Market Power
Comments Due: 5 p.m. ET 8/9/16.
Analysis of Watson Cogeneration
Company.
Docket Numbers: ER16–2231–000.
Filed Date: 7/18/16.
Applicants: NorthWestern
Accession Number: 20160718–5197.
Corporation.
Comments Due: 5 p.m. ET 9/16/16.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariff to
Docket Numbers: ER16–328–002;
ER12–952–003; ER13–1141–002; ER13– be effective 9/18/2016.
Filed Date: 7/19/16.
1142–002; ER13–1143–003; ER13–1144–
Accession Number: 20160719–5024.
003; ER11–4027–007; ER10–2196–002;
Comments Due: 5 p.m. ET 8/9/16.
ER11–4028–007; ER12–1275–002;
ER16–918–001; ER15–1657–003.
Docket Numbers: ER16–2232–000.
Applicants: Cogentrix Virginia
Applicants: Public Service Company
Financing Holding Company, LLC,
of Colorado.
Essential Power, LLC, Essential Power
Description: § 205(d) Rate Filing:
Massachusetts, LLC, Essential Power
20160719_Production Wind Credit to be
Newington, LLC, Essential Power OPP,
effective 9/16/2016.
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and five copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on August 8, 2016.
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
E:\FR\FM\26JYN1.SGM
26JYN1
Agencies
[Federal Register Volume 81, Number 143 (Tuesday, July 26, 2016)]
[Notices]
[Pages 48783-48784]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-17522]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. Cp16-478-000]
Gulf South Pipeline Company, LP; Notice of Application
Take notice that on July 11, 2016, Gulf South Pipeline Company, LP
(Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed
an application pursuant to section 7(c) of the Natural Gas Act (NGA)
requesting authorization to construct and operate its St. Charles
Parish Expansion Project to provide 133,333 dekatherms per day to serve
Entergy Louisiana, LLC. Specifically, Gulf South proposes to construct:
(i) A new 5,000 horsepower compressor station near Montz, Louisiana
(Montz Compressor Station); and (ii) approximately 900 ft of new 16-
inch-diameter pipeline, all facilities located in St. Charles and St.
John the Baptist Parishes, Louisiana. Gulf South estimates the cost of
the St. Charles Parish Expansion Project to be $29,721,360, all as more
fully set forth in the application which is on file with the Commission
and open to public inspection. The filing is available for review at
the Commission in the Public Reference Room or may be viewed on the
Commission's Web site web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or
TYY, (202) 502-8659.
Any questions regarding this application may be directed to J. Kyle
Stephens, Vice President of Regulatory Affairs, Gulf South Pipeline
Company, LP, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, by
telephone at (713) 479-8252, by facsimile at (713) 479-1745 or by email
to kyle.stephens@bwpmlp.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice, the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record
[[Page 48784]]
for this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit five copies of filings made in the proceeding with the
Commission and must mail a copy to the applicant and to every other
party. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenters will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and five copies of the protest or intervention to
the Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern Time on August 8, 2016.
Dated: July 18, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-17522 Filed 7-25-16; 8:45 am]
BILLING CODE 6717-01-P