Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act, 47162 [2016-17142]
Download as PDF
47162
Federal Register / Vol. 81, No. 139 / Wednesday, July 20, 2016 / Notices
Authority: Presidential Policy Directive
21—Critical Infrastructure Security and
Resilience (PPD–21), Presidential Policy
Directive 8—National Preparedness (PPD–8),
Fixing America’s Surface Transportation
(FAST) Act (Pub. L. 114–94) and Robert T.
Stafford Disaster Relief and Emergency
Assistance (Stafford) Act (Pub. L. 93–288) as
amended.
Issued at Washington, DC on July 14, 2016.
Patricia A. Hoffman,
Assistant Secretary, U.S. Department of
Energy, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. 2016–17133 Filed 7–19–16; 8:45 am]
BILLING CODE 6450–01–P
Issued in Washington, DC on July 14, 2016.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity
Delivery and Energy Reliability.
DEPARTMENT OF ENERGY
[Certification Notice—241]
Notice of Filing of Self-Certification of
Coal Capability Under the Powerplant
and Industrial Fuel Use Act
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of filing.
AGENCY:
mstockstill on DSK3G9T082PROD with NOTICES
VerDate Sep<11>2014
18:24 Jul 19, 2016
Jkt 238001
[FR Doc. 2016–17142 Filed 7–19–16; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
On June 30, 2016, C4GT, LLC,
as owner and operator of a new baseload
electric generating powerplant,
submitted a coal capability selfcertification to the Department of
Energy (DOE) pursuant to the
Powerplant and Industrial Fuel Use Act
of 1978 (FUA), as amended, and DOE
regulations. FUA and regulations
thereunder require DOE to publish a
notice of filing of self-certification in the
Federal Register.
ADDRESSES: Copies of coal capability
self-certification filings are available for
public inspection, upon request, in the
Office of Electricity Delivery and Energy
Reliability, Mail Code OE–20, Room
8G–024, Forrestal Building, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586–
5260.
SUPPLEMENTARY INFORMATION: Title II of
FUA, as amended (42 U.S.C. 8301 et
seq.), provides that no new base load
electric powerplant may be constructed
or operated without the capability to use
coal or another alternate fuel as a
primary energy source. Pursuant to FUA
in order to meet the requirement of coal
capability, the owner or operator of such
a facility proposing to use natural gas or
petroleum as its primary energy source
shall certify to the Secretary of Energy
(Secretary) prior to construction, or
prior to operation as a base load electric
powerplant, that such powerplant has
the capability to use coal or another
alternate fuel. Such certification
SUMMARY:
establishes compliance with FUA
section 201(a) as of the date it is filed
with the Secretary. 42 U.S.C. 8311.
The following owner of a proposed
new baseload electric generating
powerplant has filed a self-certification
of coal-capability with DOE pursuant to
FUA section 201(d) and in accordance
with DOE regulations in 10 CFR 501.60,
61:
OWNER: C4GT, LLC,
CAPACITY: 1060 megawatts (MW)
PLANT LOCATION: Near Roxbury, VA
off of VA106
IN–SERVICE DATE: Second quarter
2020
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–2302–005.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2016–
07–14_SSR 2016 Revisions Follow-Up
Compliance Filing to be effective 9/24/
2012.
Filed Date: 7/14/16.
Accession Number: 20160714–5045.
Comments Due: 5 p.m. ET 8/4/16.
Docket Numbers: ER13–1896–010;
ER14–594–008.
Applicants: AEP Generation
Resources Inc., Ohio Power Company.
Description: Notice of change in status
of AEP Generation Resources Inc. and
Ohio Power Company, et al.
Filed Date: 5/27/16.
Accession Number: 20160527–5263.
Comments Due: 5 p.m. ET 8/4/16.
Docket Numbers: ER16–2193–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Georgia-Pacific Construction
Agreement—Camas to be effective 9/13/
2016.
Filed Date: 7/14/16.
Accession Number: 20160714–5072.
Comments Due: 5 p.m. ET 8/4/16.
Docket Numbers: ER16–2195–000.
Applicants: Pacific Gas and Electric
Company.
Description: Notice of Termination of
Service Agreement Nos. 13 and 14 of
Pacific Gas and Electric Company.
PO 00000
Frm 00008
Fmt 4703
Sfmt 9990
Filed Date: 7/14/16.
Accession Number: 20160714–5089.
Comments Due: 5 p.m. ET 8/4/16.
Docket Numbers: ER16–2196–000.
Applicants: Alabama Power
Company.
Description: Tariff Cancellation: GCL
Lincoln Power SGIA Termination Filing
to be effective 7/1/2016.
Filed Date: 7/14/16.
Accession Number: 20160714–5091.
Comments Due: 5 p.m. ET 8/4/16.
Docket Numbers: ER16–2197–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Service Agreement No. 3831, Queue
Position Z1–072 to be effective 6/14/
2016.
Filed Date: 7/14/16.
Accession Number: 20160714–5108.
Comments Due: 5 p.m. ET 8/4/16.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF16–1046–000.
Applicants: Tate & Lyle Ingredients
Americas LLC.
Description: Form 556 of Tate & Lyle
Ingredients Americas LLC.
Filed Date: 7/13/16.
Accession Number: 20160713–5102.
Comments Due: None Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–17105 Filed 7–19–16; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\20JYN1.SGM
20JYN1
Agencies
[Federal Register Volume 81, Number 139 (Wednesday, July 20, 2016)]
[Notices]
[Page 47162]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-17142]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Certification Notice--241]
Notice of Filing of Self-Certification of Coal Capability Under
the Powerplant and Industrial Fuel Use Act
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of filing.
-----------------------------------------------------------------------
SUMMARY: On June 30, 2016, C4GT, LLC, as owner and operator of a new
baseload electric generating powerplant, submitted a coal capability
self-certification to the Department of Energy (DOE) pursuant to the
Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and
DOE regulations. FUA and regulations thereunder require DOE to publish
a notice of filing of self-certification in the Federal Register.
ADDRESSES: Copies of coal capability self-certification filings are
available for public inspection, upon request, in the Office of
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC
20585.
FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.
SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301
et seq.), provides that no new base load electric powerplant may be
constructed or operated without the capability to use coal or another
alternate fuel as a primary energy source. Pursuant to FUA in order to
meet the requirement of coal capability, the owner or operator of such
a facility proposing to use natural gas or petroleum as its primary
energy source shall certify to the Secretary of Energy (Secretary)
prior to construction, or prior to operation as a base load electric
powerplant, that such powerplant has the capability to use coal or
another alternate fuel. Such certification establishes compliance with
FUA section 201(a) as of the date it is filed with the Secretary. 42
U.S.C. 8311.
The following owner of a proposed new baseload electric generating
powerplant has filed a self-certification of coal-capability with DOE
pursuant to FUA section 201(d) and in accordance with DOE regulations
in 10 CFR 501.60, 61:
OWNER: C4GT, LLC,
CAPACITY: 1060 megawatts (MW)
PLANT LOCATION: Near Roxbury, VA off of VA106
IN-SERVICE DATE: Second quarter 2020
Issued in Washington, DC on July 14, 2016.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy
Reliability.
[FR Doc. 2016-17142 Filed 7-19-16; 8:45 am]
BILLING CODE 6450-01-P