Federal Register / Vol. 81, No. 137 / Monday, July 18, 2016 / Notices
approximately 10 percent (or 94) of the
registered generator owners have
interconnection facilities that meet the
requirements for applicability under the
new standard. The estimated annual
burden and cost of the new standard
follow.13
FERC–725M—CHANGES DUE TO FAC–003–4 IN DOCKET NO. RD16–4–000
Number of
respondents 15
Number of
responses per
respondent
Total number
of responses
Average burden hours
and
cost per response
(2)
(1)*(2)=(3)
(4)
(3)*(4)=(5)
Strategies, documentation, processes, &
procedures (M3)
[one-time].
Record Retention
(Compliance 1.2) [ongoing].
Total Net Change,
due to RD16–4.
414
1
414
4 hrs.; $248.64 ............
1,656 hrs.;
$102,936.96
[@$62.16/hr.].
414
1
414
1 hr.; $31.76 ................
414 hrs.; $13,148.64
[@$31.76/hr.].
........................
........................
........................
.....................................
2,070 hrs.;
$116,085.60 16.
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collections of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collection; and (4) ways to
minimize the burden of the collection of
information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
Dated: July 11, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–16899 Filed 7–15–16; 8:45 am]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Jkt 238001
........................
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket Nos. CP16–3–000 and CP16–3–001]
[Project No. 12965–002]
Wickiup Hydro Group, LLC; Notice of
Schedule Change
On June 27, 2016, the Commission
issued a ‘‘Notice of Teleconference to
Discuss Endangered Species Act
Consultation’’ for the Wickiup Dam
Hydroelectric Project, FERC Project No.
12965. This teleconference has been
rescheduled due to unforeseen
scheduling conflicts to August 1, 2016
at 1:00 p.m. Pacific Daylight Time (4:00
p.m. Eastern Daylight Time). Please
email Karen Sughrue at karen.sughrue@
ferc.gov to RSVP.
BILLING CODE 6717–01–P
17:52 Jul 15, 2016
31.76
DEPARTMENT OF ENERGY
[FR Doc. 2016–16898 Filed 7–15–16; 8:45 am]
13 The estimates for cost per hour (for salary plus
benefits) are derived from the Bureau of Labor and
Statistics’ figures for May 2015 (at https://
www.bls.gov/oes/current/naics2_22.htm#11-0000
and benefits [updated March 10, 2016] at https://
www.bls.gov/news.release/ecec.nr0.htm), as
follows:
• $62.16/hour for salary plus benefits [based on
the average for an electrical engineer (code 17–
2071, at $64.20/hour), a first-line supervisor of
forestry workers (code 45–1011, at $33.34/hour),
and a manager (code 11–0000, at $88.94/hour)]
• $31.76/hour, salary plus benefits for an
information and record clerk (code 43–4000).
$248.64
DEPARTMENT OF ENERGY
Dated: July 11, 2016.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
VerDate Sep<11>2014
Total annual
cost per
respondent
($)
Total annual burden
hours and cost
(1)
Requirements/measures 14
14 The Order in Docket No. RD16–4 does not
modify the following requirements. However, due
to normal fluctuations in industry, the number of
respondents (TOs and GOs), in the submittal to
OMB will be updated as follows.
• The Quarterly Reporting (Compliance 1.4) is
required of 102 respondents (94 GOs and 8 Regional
Entities), rather than 96 respondents.
• The requirements for Annual Vegetation
Inspection Document (M6), annual vegetation work
plan (M7), evidence of management of vegetation
(M1 and M2), confirmed vegetation condition (M4),
and corrective action (M5) are required of 94
respondents (rather than 88).
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Texas Eastern Transmission, LP;
Notice of Schedule for Environmental
Review of the Access South, Adair
Southwest, and Lebanon Extension
Projects
On October 8, 2015, Texas Eastern
Transmission, LP (Texas Eastern) filed
an application requesting a Certificate of
Public Convenience and Necessity
pursuant to Section 7(c) of the Natural
Gas Act to construct, operate, and
maintain pipeline loops, install
additional compression, and allow for
reverse flow capabilities. The proposed
projects, known as Access South, Adair
Southwest, and the Lebanon Extension
Projects would enable Texas Eastern to
transport up to an additional 622,000
dekatherms per day of natural gas on its
mainline system from Uniontown,
Pennsylvania to points in Ohio,
Kentucky, and Mississippi.
On October 22, 2015, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the projects. Among
15 We estimate a total of 414 respondents (320
TOs and 94 GOs) are affected.
16 This is the estimate for Year 1 (including onetime implementation cost plus ongoing record
retention costs). In subsequent years, only the
record retention costs ($13,148.64, annual total for
all respondents) will continue.
For the submittal to OMB (available in
reginfo.gov), the one-time implementation burden
and cost (which will be completed in Year 1) will
be averaged over Years 1–3.
E:\FR\FM\18JYN1.SGM
18JYN1
Agencies
[Federal Register Volume 81, Number 137 (Monday, July 18, 2016)]
[Notices]
[Page 46666]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-16898]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12965-002]
Wickiup Hydro Group, LLC; Notice of Schedule Change
On June 27, 2016, the Commission issued a ``Notice of
Teleconference to Discuss Endangered Species Act Consultation'' for the
Wickiup Dam Hydroelectric Project, FERC Project No. 12965. This
teleconference has been rescheduled due to unforeseen scheduling
conflicts to August 1, 2016 at 1:00 p.m. Pacific Daylight Time (4:00
p.m. Eastern Daylight Time). Please email Karen Sughrue at
karen.sughrue@ferc.gov to RSVP.
Dated: July 11, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-16898 Filed 7-15-16; 8:45 am]