City of Sheridan, WY; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 46669-46670 [2016-16896]
Download as PDF
Federal Register / Vol. 81, No. 137 / Monday, July 18, 2016 / Notices
Filed Date: 7/11/16.
Accession Number: 20160711–5149.
Comments Due: 5 p.m. ET 8/1/16.
Docket Numbers: ER16–2167–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2880R1 Rattlesnake Creek Wind Project
GIA to be effective 6/10/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5174.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2168–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Interim Transmission Access Charge
Balancing Account Adjustment
(TACBAA) 2016 to be effective 10/1/
2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5192.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2169–000.
Applicants: Algonquin SKIC 20 Solar,
LLC.
Description: Baseline eTariff Filing:
Application for Initial Tariff to be
effective 7/14/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5193.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2171–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
3439, Queue No. Y1–027 to be effective
5/26/2016.
Filed Date: 7/11/16.
Accession Number: 20160711–5061.
Comments Due: 5 p.m. ET 8/1/16.
Docket Numbers: ER16–2172–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2016–07–11_SA 2926 GRE—Oliver
Wind III FCA (C023) to be effective 7/
12/2016.
Filed Date: 7/11/16.
Accession Number: 20160711–5071.
Comments Due: 5 p.m. ET 8/1/16.
Docket Numbers: ER16–2173–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2016–07–11_SA 2927 Duke Energy
Business Services—Duke Energy
Indiana GIA (J453) to be effective 7/12/
2016.
Filed Date: 7/11/16.
Accession Number: 20160711–5078.
Comments Due: 5 p.m. ET 8/1/16.
Docket Numbers: ER16–2174–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
3251, Queue No. W3–025 and X1–077 to
be effective 8/22/2016.
Filed Date: 7/11/16.
Accession Number: 20160711–5164.
Comments Due: 5 p.m. ET 8/1/16.
Docket Numbers: ER16–2175–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2016–07–11_2nd Quarter MISO Tariff
Clean-Up Filing to be effective 7/12/
2016.
Filed Date: 7/11/16.
Accession Number: 20160711–5168.
Comments Due: 5 p.m. ET 8/1/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–16877 Filed 7–15–16; 8:45 am]
46669
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD16–15–000]
City of Sheridan, WY; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On July 6, 2016, the City of Sheridan,
WY filed a notice of intent to construct
a qualifying conduit hydropower
facility, pursuant to section 30 of the
Federal Power Act (FPA), as amended
by section 4 of the Hydropower
Regulatory Efficiency Act of 2013
(HREA). The proposed Beckton Hall
Road PRV Vault Project would have an
installed capacity of 240 kilowatts (kW)
and would be located within the
Beckton Hall Road PRV Vault, which is
part of the City of Sheridan’s existing
raw water transmission system. The
project would be located near the City
of Sheridan in Sheridan County,
Wyoming.
Applicant Contact: Dan Roberts, City
of Sheridan, 55 Grinnell Plaza,
Sheridan, WY 82801, Phone No. (307)
675–4233.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
240-kW turbine placed inside a 30-inchdiameter pipeline, with the facility
entirely housed within the Beckton Hall
Road PRV Vault, and (2) appurtenant
facilities. The proposed project would
have an estimated annual generating
capacity of 836.5 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
BILLING CODE 6717–01–P
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
FPA 30(a)(3)(C)(ii),
HREA.
VerDate Sep<11>2014
as
amended
17:52 Jul 15, 2016
by
Jkt 238001
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
E:\FR\FM\18JYN1.SGM
18JYN1
Y
Y
46670
Federal Register / Vol. 81, No. 137 / Monday, July 18, 2016 / Notices
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
Description
Satisfies
(Y/N)
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
Statutory provision
asabaliauskas on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(iii),
HREA.
as
amended
by
Preliminary Determination: Based
upon the above criteria, Commission
staff has preliminarily determined that
the proposal satisfies the requirements
for a qualifying conduit hydropower
facility under 16 U.S.C. 823a, and is
exempted from the licensing
requirements of the FPA.
Comments and Motions to Intervene:
The deadline for filing comments
contesting whether the facility meets the
qualifying criteria is 45 days from the
issuance date of this notice.
The deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
1 18
CFR 385.2001–2005 (2015).
VerDate Sep<11>2014
17:52 Jul 15, 2016
Jkt 238001
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD16–15–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: July 12, 2016.
Kimberly Bose,
Secretary.
[FR Doc. 2016–16896 Filed 7–15–16; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2016–0346; FRL–9949–14–
OAR]
RIN 2060–AS30
Oil and Natural Gas Sector: Request
for Information, Emerging
Technologies
Environmental Protection
Agency (EPA).
ACTION: Notice; request for information.
AGENCY:
The Environmental Protection
Agency (EPA) is issuing this request for
information to the public to obtain
information about monitoring, detection
of fugitive emissions, and alternative
mitigation approaches in the oil and
natural gas sector.
DATES: Responses must be received on
or before November 15, 2016.
ADDRESSES: Submit your information,
identified by Docket ID No. EPA–HQ–
SUMMARY:
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
OAR–2016–0346, to the Federal
eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting responses.
Once submitted, responses cannot be
edited or withdrawn. The EPA may
publish any response received to its
public docket. Do not submit
electronically any information you
consider to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Additional information on submission
of CBI can be found below in this
document. Multimedia submissions
(audio, video, etc.) must be
accompanied by a written response. The
written response is considered the
official response and should include
discussion of all points you wish to
make. The EPA will generally not
consider information or content located
outside of the primary submission (i.e.,
on the Web, cloud, or other file sharing
system). For additional submission
methods, the full EPA public comment
policy, information about CBI or
multimedia submissions, and general
guidance on making effective
comments, please visit https://
www2.epa.gov/dockets/commentingepa-dockets.
Docket. All documents in the docket
are listed in the https://
www.regulations.gov index. Although
listed in the index, some information is
not publicly available, e.g., CBI or other
information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
will be publicly available only in hard
copy. Publicly available docket
materials are available either
electronically at https://
www.regulations.gov or in hard copy at
the U.S. Environmental Protection
Agency, EPA Docket Center, EPA WJC
West Building, Room 3334, 1301
Constitution Ave. NW., Washington,
DC. The Public Reading Room is open
from 8:30 a.m. to 4:30 p.m., Monday
through Friday, excluding legal
holidays. The telephone number for the
Public Reading Room is (202) 566–1744,
and the telephone number for the Air
Docket is (202) 566–1742.
FOR FURTHER INFORMATION CONTACT: For
further information about this action,
contact Mr. Matthew Witosky, Sector
Policies and Programs Division (E143–
E:\FR\FM\18JYN1.SGM
18JYN1
Agencies
[Federal Register Volume 81, Number 137 (Monday, July 18, 2016)]
[Notices]
[Pages 46669-46670]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-16896]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD16-15-000]
City of Sheridan, WY; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On July 6, 2016, the City of Sheridan, WY filed a notice of intent
to construct a qualifying conduit hydropower facility, pursuant to
section 30 of the Federal Power Act (FPA), as amended by section 4 of
the Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed
Beckton Hall Road PRV Vault Project would have an installed capacity of
240 kilowatts (kW) and would be located within the Beckton Hall Road
PRV Vault, which is part of the City of Sheridan's existing raw water
transmission system. The project would be located near the City of
Sheridan in Sheridan County, Wyoming.
Applicant Contact: Dan Roberts, City of Sheridan, 55 Grinnell
Plaza, Sheridan, WY 82801, Phone No. (307) 675-4233.
FERC Contact: Robert Bell, Phone No. (202) 502-6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A proposed 240-kW turbine placed inside a
30-inch-diameter pipeline, with the facility entirely housed within the
Beckton Hall Road PRV Vault, and (2) appurtenant facilities. The
proposed project would have an estimated annual generating capacity of
836.5 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit is a Y
HREA. tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity
that does not exceed
5 megawatts.
[[Page 46670]]
FPA 30(a)(3)(C)(iii), as On or before August 9, Y
amended by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff has preliminarily determined that the proposal
satisfies the requirements for a qualifying conduit hydropower facility
under 16 U.S.C. 823a, and is exempted from the licensing requirements
of the FPA.
Comments and Motions to Intervene: The deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
The deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD16-15-000) in
the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502-8659.
Dated: July 12, 2016.
Kimberly Bose,
Secretary.
[FR Doc. 2016-16896 Filed 7-15-16; 8:45 am]
BILLING CODE 6717-01-P