National Fuel Gas Supply Corporation; Notice of Schedule for Environmental Review of the Line T2KNY Install, Line TNY Replacement, and Line KNY Abandonment Project, 45467-45468 [2016-16668]
Download as PDF
Federal Register / Vol. 81, No. 135 / Thursday, July 14, 2016 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: CP14–112–003.
Applicants: National Fuel Gas Supply
Corporation and Empire Pipeline, Inc.
Description: Joint Petition to Amend
the Certificate of Public Convenience
and Necessity.
Filed Date: 6/28/16.
Accession Number: 20160628–5281.
Comments Due: 5 p.m. ET 7/18/16.
Docket Numbers: CP14–96–002.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Abbreviated application
for limited amendment of the certificate
of public convenience and necessity.
Filed Date: 7/01/16.
Accession Number: 20160701–5329.
Comments Due: 5 p.m. ET 7/18/16.
Docket Number: PR16–61–000.
Applicants: SourceGas Distribution
LLC.
Description: Tariff filing per
284.123(e) + (g): Statement of Operating
Conditions to be effective 6/1/2016;
Filing Type: 1280.
Filed Date: 6/30/2016.
Accession Number: 201606305111
https://elibrary.ferc.gov/idmws/doc_
info.asp?accession_num=201604155222.
Comments Due: 5 p.m. ET 7/21/16.
284.123(g) Protests Due: 5 p.m. ET 8/
29/16.
Docket Number: PR16–62–000.
Applicants: Columbia Gas of Ohio,
Inc.
Description: Tariff filing per
284.123(b)(1)/.: COH SOC 6–29–2016 to
be effective 6/29/2016; Filing Type: 980.
Filed Date: 7/1/16.
Accession Number: 201607015278.
Comments/Protests Due: 5 p.m. ET 7/
22/16.
Docket Numbers: RP10–837–000.
Applicants: Dominion Transmission,
Inc.
Description: Report Filing: DTI—
Operational Gas Sales Report—2016.
Filed Date: 6/30/16.
Accession Number: 20160630–5334.
Comments Due: 5 p.m. ET 7/12/16.
Docket Numbers: RP10–900–000.
Applicants: Dominion Transmission,
Inc.
Description: Report Filing: DTI—
Informational Fuel Report—2016.
VerDate Sep<11>2014
19:33 Jul 13, 2016
Jkt 238001
Filed Date: 6/30/16.
Accession Number: 20160630–5335.
Comments Due: 5 p.m. ET 7/12/16.
Docket Numbers: RP16–1084–000.
Applicants: Dominion Transmission,
Inc.
Description: Compliance filing DTI—
2016 Overrun and Penalty Revenue
Distribution.
Filed Date: 7/6/16.
Accession Number: 20160706–5033.
Comments Due: 5 p.m. ET 7/18/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
45467
therefore increasing the overall integrity
and reliability of National Fuel’s
pipeline system.
On April 15, 2016, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
Schedule for Environmental Review
Issuance of EA August 3, 2016
90-day Federal Authorization Decision
Deadline November 1, 2016
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
National Fuel Gas Supply Corporation;
Notice of Schedule for Environmental
Review of the Line T2KNY Install, Line
TNY Replacement, and Line KNY
Abandonment Project
Project Description
National Fuel proposes to install
approximately 1.2 miles of new 20-inchdiameter natural gas pipeline (Line
T2KNY), replace approximately 6.7
miles of 20-inch-diameter bare steel
pipeline with 7.0 miles of 24-inchdiameter coated natural gas pipeline
(Line TNY), abandon approximately
14.9 miles of 20-inch-diameter bare steel
natural gas pipeline (Line KNY), make
modifications at two existing National
Fuel meter and regulator stations (North
Boston and East Eden), and make
modifications at National Fuel’s existing
Zoar Compressor Station in Erie County,
New York. The Line T2KNY Install,
Line TNY Replacement, and Line KNY
Abandonment Project would allow
National Fuel to cure operating
deficiencies on Line TNY and would
provide an additional 2,600 dekatherms
per day of new firm capacity which
would be offered in an open season.
On April 4, 2016, National Fuel Gas
Supply Corporation (National Fuel)
filed an application in Docket No.
CP16–125–000 requesting a Certificate
of Public Convenience and Necessity
pursuant to sections 7(b) and (c) of the
Natural Gas Act to construct and
abandon certain natural gas pipeline
facilities. The proposed project is
known as the Line T2KNY Install, Line
TNY Replacement, and Line KNY
Abandonment Project (Project). The
Project would eliminate vintage bare
steel pipeline, replacing it with modern,
high strength, coated steel pipeline,
Background
On May 2, 2016, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Line T2KNY Install, Line TNY
Replacement, and Line KNY
Abandonment Project and Request for
Comments on Environmental Issues
(NOI). The NOI was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers.
Dated: July 7, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–16666 Filed 7–13–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–125–000]
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
E:\FR\FM\14JYN1.SGM
14JYN1
45468
Federal Register / Vol. 81, No. 135 / Thursday, July 14, 2016 / Notices
To date, no comments have been
received on the NOI. The New York
State Department of Agriculture and
Markets is a cooperating agency in the
preparation of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP16–125), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: July 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–16668 Filed 7–13–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1494–433; Oklahoma]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Grand River Dam Authority; Notice of
Tribal Consultation Meeting
On May 6, 2016, the Grand River Dam
Authority (GRDA) filed an application
to amend the rule curve specified in
Article 401 of the license for the
Pensacola Project. The rule curve sets
forth target water elevations for Grand
Lake O’ the Cherokees.
The Commission will hold a meeting
with representatives of the tribes
comprising the Inter-Tribal Council, Inc.
potentially affected by GRDA’s
application to amend the rule curve.
The meeting will be held from 9:00 a.m.
to about 4:00 p.m. on Wednesday
VerDate Sep<11>2014
19:33 Jul 13, 2016
Jkt 238001
August 3, 2016, at the Miami Tribe of
Oklahoma Council House, 2319
Newman Road, Miami, Oklahoma
74354.
Interested parties may attend the
meeting as observers. The meeting will
be transcribed by a court reporter and
the transcript will be placed in the
record of this proceeding.
For further information on this
meeting please contact either B. Peter
Yarrington at (202) 502–6129 or Linda
Stewart at (202) 502–6680.
Dated: July 8, 2016
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–16650 Filed 7–13–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–145–000.
Applicants: NSTAR Electric
Company.
Description: Application of NSTAR
Electric Company Seeking
Authorization for the Acquisition of
Jurisdictional Facilities under FPA
Section 203.
Filed Date: 7/8/16.
Accession Number: 20160708–5159.
Comments Due: 5 p.m. ET 7/29/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1861–000.
Applicants: Tucson Electric Power
Company.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 7/8/16.
Accession Number: 20160708–5117.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER15–1862–000.
Applicants: Tucson Electric Power
Company.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 7/8/16.
Accession Number: 20160708–5119.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–1707–002.
Applicants: Upper Peninsula Power
Company.
Description: Tariff Amendment: 2nd
Amended Project Services Agreement to
be effective 7/16/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5113.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2145–000.
Applicants: PacifiCorp.
Description: Compliance filing:
PacifiCorp MBR Sales Tariff Compliance
Filing per 155 FERC 61,249 to be
effective 6/9/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5100.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2146–000.
Applicants: Bishop Hill Energy II
LLC.
Description: Compliance filing: BHE
MBR Sellers Compliance Filing to be
effective 6/9/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5125.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2147–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA No. 3383,
Queue No. X4–004 due to Withdraw to
be effective 8/6/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5127.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2148–000.
Applicants: CalEnergy, LLC.
Description: Compliance filing: BHE
MBR Sellers Compliance Filing to be
effective 6/9/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5128.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2149–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended LGIA Added Facilities Rate—
Garland Project to be effective 1/3/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5129.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2150–000.
Applicants: CE Leathers Company.
Description: Compliance filing: BHE
MBR Sellers Compliance Filing to be
effective 6/9/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5130.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2151–000.
Applicants: Cordova Energy Company
LLC.
Description: Compliance filing: BHE
MBR Sellers Compliance Filing to be
effective 6/9/2016.
Filed Date: 7/8/16.
Accession Number: 20160708–5131.
Comments Due: 5 p.m. ET 7/29/16.
Docket Numbers: ER16–2152–000.
Applicants: Del Ranch Company.
Description: Compliance filing: BHE
MBR Sellers Compliance Filing to be
effective 6/9/2016.
E:\FR\FM\14JYN1.SGM
14JYN1
Agencies
[Federal Register Volume 81, Number 135 (Thursday, July 14, 2016)]
[Notices]
[Pages 45467-45468]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-16668]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP16-125-000]
National Fuel Gas Supply Corporation; Notice of Schedule for
Environmental Review of the Line T2KNY Install, Line TNY Replacement,
and Line KNY Abandonment Project
On April 4, 2016, National Fuel Gas Supply Corporation (National
Fuel) filed an application in Docket No. CP16-125-000 requesting a
Certificate of Public Convenience and Necessity pursuant to sections
7(b) and (c) of the Natural Gas Act to construct and abandon certain
natural gas pipeline facilities. The proposed project is known as the
Line T2KNY Install, Line TNY Replacement, and Line KNY Abandonment
Project (Project). The Project would eliminate vintage bare steel
pipeline, replacing it with modern, high strength, coated steel
pipeline, therefore increasing the overall integrity and reliability of
National Fuel's pipeline system.
On April 15, 2016, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA August 3, 2016
90-day Federal Authorization Decision Deadline November 1, 2016
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
National Fuel proposes to install approximately 1.2 miles of new
20-inch-diameter natural gas pipeline (Line T2KNY), replace
approximately 6.7 miles of 20-inch-diameter bare steel pipeline with
7.0 miles of 24-inch-diameter coated natural gas pipeline (Line TNY),
abandon approximately 14.9 miles of 20-inch-diameter bare steel natural
gas pipeline (Line KNY), make modifications at two existing National
Fuel meter and regulator stations (North Boston and East Eden), and
make modifications at National Fuel's existing Zoar Compressor Station
in Erie County, New York. The Line T2KNY Install, Line TNY Replacement,
and Line KNY Abandonment Project would allow National Fuel to cure
operating deficiencies on Line TNY and would provide an additional
2,600 dekatherms per day of new firm capacity which would be offered in
an open season.
Background
On May 2, 2016, the Commission issued a Notice of Intent to Prepare
an Environmental Assessment for the Proposed Line T2KNY Install, Line
TNY Replacement, and Line KNY Abandonment Project and Request for
Comments on Environmental Issues (NOI). The NOI was sent to affected
landowners; federal, state, and local government agencies; elected
officials; environmental and public interest groups; Native American
tribes; other interested parties; and local libraries and newspapers.
[[Page 45468]]
To date, no comments have been received on the NOI. The New York
State Department of Agriculture and Markets is a cooperating agency in
the preparation of the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP16-125), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC
Web site also provides access to the texts of formal documents issued
by the Commission, such as orders, notices, and rule makings.
Dated: July 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-16668 Filed 7-13-16; 8:45 am]