Filed Date: 7/1/16.
Accession Number: 20160701–5084.
Comments Due: 5 p.m. ET 7/22/16.
Docket Numbers: ER16–2116–000.
Applicants: Virginia Electric and
Power Company, PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: VEPCO submits revisions to
OATT, Attach. H–16A to address
income tax issues to be effective
9/1/2016.
Filed Date: 7/1/16.
Accession Number: 20160701–5095.
Comments Due: 5 p.m. ET 7/22/16.
Docket Numbers: ER16–2117–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: 2881R3 City of Chanute, KS
NITSA NOA to be effective 9/1/2016.
Filed Date: 7/1/16.
Accession Number: 20160701–5103.
Comments Due: 5 p.m. ET 7/22/16.
sradovich on DSK3GDR082PROD with NOTICES
Docket Numbers: ER16–2118–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) Rate
Filing: 2016–07–01_SA 2925 ITC
Midwest-Prairie Wind Energy GIA
(J344) to be effective 7/2/2016.
Filed Date: 7/1/16.
Accession Number: 20160701–5116.
Comments Due: 5 p.m. ET 7/22/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–16242 Filed 7–8–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:55 Jul 08, 2016
Jkt 238001
Background
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–64–000]
ANR Pipeline Company; Notice of
Schedule for Environmental Review of
the Collierville Expansion Project
On January 20, 2016, ANR Pipeline
Company (ANR) filed an application in
Docket No. CP16–64–000 requesting a
Certificate of Public Convenience and
Necessity pursuant to section 7(c) of the
Natural Gas Act to construct and operate
certain natural gas pipeline facilities.
The proposed project is known as the
Collierville Expansion Project (Project).
The Project would expand the delivery
capability of the existing Collierville
Meter Station by an additional 200,000
dekatherms per day, enabling ANR to
provide requested service to the
Tennessee Valley Authority’s pending
Allen Combined Cycle Power Plant in
Memphis, Tennessee.
On February 3, 2016, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—July 29, 2016
90-day Federal Authorization Decision
Deadline—October 27, 2016
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
The Project would consist of the
following:
• A new Collierville Compressor
Station containing one 4,700
horsepower gas turbine compressor unit
and ancillary equipment, including an
emergency generator unit, a condensate
tank, new control building, and
compressor building;
• suction and discharge interconnect
station piping; and
• upgrades to the existing Collierville
Meter Station.
Frm 00017
Fmt 4703
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP16–64), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: June 30, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–16236 Filed 7–8–16; 8:45 am]
BILLING CODE 6717–01–P
Project Description
PO 00000
On February 26, 2016, the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Collierville Expansion
Project and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. The
Commission did not receive comments
in response to the NOI.
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2249–005.
Applicants: Portland General Electric
Company.
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 81, Number 132 (Monday, July 11, 2016)]
[Notices]
[Page 44854]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-16236]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP16-64-000]
ANR Pipeline Company; Notice of Schedule for Environmental Review
of the Collierville Expansion Project
On January 20, 2016, ANR Pipeline Company (ANR) filed an
application in Docket No. CP16-64-000 requesting a Certificate of
Public Convenience and Necessity pursuant to section 7(c) of the
Natural Gas Act to construct and operate certain natural gas pipeline
facilities. The proposed project is known as the Collierville Expansion
Project (Project). The Project would expand the delivery capability of
the existing Collierville Meter Station by an additional 200,000
dekatherms per day, enabling ANR to provide requested service to the
Tennessee Valley Authority's pending Allen Combined Cycle Power Plant
in Memphis, Tennessee.
On February 3, 2016, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--July 29, 2016
90-day Federal Authorization Decision Deadline--October 27, 2016
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
The Project would consist of the following:
A new Collierville Compressor Station containing one 4,700
horsepower gas turbine compressor unit and ancillary equipment,
including an emergency generator unit, a condensate tank, new control
building, and compressor building;
suction and discharge interconnect station piping; and
upgrades to the existing Collierville Meter Station.
Background
On February 26, 2016, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Collierville
Expansion Project and Request for Comments on Environmental Issues
(NOI). The NOI was sent to affected landowners; federal, state, and
local government agencies; elected officials; environmental and public
interest groups; Native American tribes; other interested parties; and
local libraries and newspapers. The Commission did not receive comments
in response to the NOI.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP16-64), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC
Web site also provides access to the texts of formal documents issued
by the Commission, such as orders, notices, and rule makings.
Dated: June 30, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-16236 Filed 7-8-16; 8:45 am]
BILLING CODE 6717-01-P