planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—August 23, 2016.
90-day Federal Authorization
Decision Deadline—November 21, 2016.
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Project Description
Tennessee proposes to construct and
operate pipeline facilities, modify
existing aboveground facilities, and add
new tie-in facilities in Wayne and Pike
Counties, Pennsylvania.
The Project would consist of the
following facilities:
• Approximately 12.9 miles of new
36-inch-diameter looping 1 pipeline in
Wayne and Pike Counties,
Pennsylvania;
• a new internal pipeline inspection
(‘‘pig’’) 2 launcher, crossover, and
connecting facilities at the beginning of
the proposed pipeline loop in Wayne
County;
• a new pig receiver, crossover, and
connecting facilities at the end of the
proposed pipeline loop in Pike County;
and
• modifications at Tennessee’s
existing Compressor Station 323,
including rewheeling/restaging of an
existing compressor and other piping
and appurtenant modifications.
Background
On November 23, 2015, the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Orion Project and
Request for Comments on
Environmental Issues (NOI). On
December 3, 2015, the Commission
issued a supplemental NOI extending
the scoping period for the Project. The
NOI and supplemental NOI were sent to
affected landowners; federal, state, and
local government agencies; elected
officials; environmental and public
interest groups; Native American tribes;
other interested parties; and local
libraries and newspapers. In response to
the NOIs, the Commission received
comments from the National Park
Service and several individuals. The
comments primarily concerned impacts
on water resources, land use, recreation,
air quality, and reliability and safety.
1 A pipeline loop is a segment of pipe constructed
parallel to an existing pipeline to increase capacity.
2 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
VerDate Sep<11>2014
17:00 Jul 07, 2016
Jkt 238001
The U.S. Army Corps of Engineers is
a cooperating agency in the preparation
of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP16–4), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: June 30, 2016.
Kimberly D. Bose,
Secretary.
Management Project, Review Period
Ends: 08/08/2016, Contact: Mickey
Sugg 910–251–4811.
EIS No. 20160149, Final, BIA, FL,
Seminole Tribe of Florida Fee to
Trust, Review Period Ends: 08/08/
2016, Contact: Chester McGhee 615–
564–6830.
EIS No. 20160150, Final Supplement,
NIGC, CA, Jamul Indian Village,
Review Period Ends: 08/08/2016,
Contact: Andrew Mendoza 202–634–
0012.
EIS No. 20160151, Final, BLM, CO, Bull
Mountain Unit Master Development
Plan, Review Period Ends: 08/08/
2016, Contact: Gina Jones 970–240–
5300.
EIS No. 20160152, Draft, USFS, NM,
Santa Fe National Forest Geothermal
Leasing, Comment Period Ends:
08/22/2016, Contact: Larry Gore 575–
289–3264.
Amended Notices
EIS No. 20160128, Final, USACE, NC,
Morehead City Harbor Integrated
Dredged Material Management Plan,
Review Period Ends: 08/11/2016,
Contact: Jennifer Owens 910–251–
4757.
Revision to FR Notice Published
06/10/2016; Extending Review Period
from 07/11/2016 to 08/11/2016.
Dated: July 1, 2016.
Dawn Roberts,
Management Analyst, NEPA Compliance
Division, Office of Federal Activities.
[FR Doc. 2016–16310 Filed 7–7–16; 8:45 am]
[FR Doc. 2016–16168 Filed 7–7–16; 8:45 am]
BILLING CODE 6560–50–P
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9027–9]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EISs)
Filed 06/27/2016 Through 07/01/2016
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20160148, Final, USACE, NC,
Figure Eight Island Shoreline
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2016–0289; FRL–9948–75–
OAR]
Draft Guidance on Progress Tracking
Metrics, Long-Term Strategies,
Reasonable Progress Goals and Other
Requirements for Regional Haze State
Implementation Plans for the Second
Implementation Period
Environmental Protection
Agency (EPA).
ACTION: Notice of availability and public
comment period.
AGENCY:
Notice is hereby given that
the Environmental Protection Agency
(EPA) has posted on its Web site a draft
guidance document titled, ‘‘Draft
Guidance on Progress Tracking Metrics,
Long-Term Strategies, Reasonable
Progress Goals and Other Requirements
for Regional Haze State Implementation
Plans for the Second Implementation
SUMMARY:
E:\FR\FM\08JYN1.SGM
08JYN1
Agencies
[Federal Register Volume 81, Number 131 (Friday, July 8, 2016)]
[Notices]
[Page 44608]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-16310]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9027-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact Statements (EISs)
Filed 06/27/2016 Through 07/01/2016
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20160148, Final, USACE, NC, Figure Eight Island Shoreline
Management Project, Review Period Ends: 08/08/2016, Contact: Mickey
Sugg 910-251-4811.
EIS No. 20160149, Final, BIA, FL, Seminole Tribe of Florida Fee to
Trust, Review Period Ends: 08/08/2016, Contact: Chester McGhee 615-564-
6830.
EIS No. 20160150, Final Supplement, NIGC, CA, Jamul Indian Village,
Review Period Ends: 08/08/2016, Contact: Andrew Mendoza 202-634-0012.
EIS No. 20160151, Final, BLM, CO, Bull Mountain Unit Master Development
Plan, Review Period Ends: 08/08/2016, Contact: Gina Jones 970-240-5300.
EIS No. 20160152, Draft, USFS, NM, Santa Fe National Forest Geothermal
Leasing, Comment Period Ends: 08/22/2016, Contact: Larry Gore 575-289-
3264.
Amended Notices
EIS No. 20160128, Final, USACE, NC, Morehead City Harbor Integrated
Dredged Material Management Plan, Review Period Ends: 08/11/2016,
Contact: Jennifer Owens 910-251-4757.
Revision to FR Notice Published 06/10/2016; Extending Review Period
from 07/11/2016 to 08/11/2016.
Dated: July 1, 2016.
Dawn Roberts,
Management Analyst, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2016-16310 Filed 7-7-16; 8:45 am]