Download as PDF 44604 Federal Register / Vol. 81, No. 131 / Friday, July 8, 2016 / Notices Program (NACTEP) Performance Reports. OMB Control Number: 1830–0573. Type of Review: An extension of an existing information collection. Respondents/Affected Public: State, Local, and Tribal Governments. Total Estimated Number of Annual Responses: 30. Total Estimated Number of Annual Burden Hours: 1,200. Abstract: The Native American Career and Technical Education Program (NACTEP) is requesting an extension to collect semi-annual, annual/ continuation reports, and final performance reports from currently funded NACTEP grantees. This information is necessary to (1) manage and monitor the current NACTEP grantees, and (2) award continuation grants for years four and five of the grantees’ performance periods. The continuation performance reports will include budgets, performance/statistical reports, GPRA reports, and evaluation reports. The data, collected from the performance reports, will be used to determine if the grantees successfully met their project goals and objectives, so that NACTEP staff can award continuation grants. Final performance reports are required to determine whether or not the grant can be closed our in compliance with the grant’s requirements. Dated: July 5, 2016. Tomakie Washington, Acting Director, Information Collection Clearance Division, Office of the Chief Privacy Officer, Office of Management. [FR Doc. 2016–16218 Filed 7–7–16; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14786–000] asabaliauskas on DSK3SPTVN1PROD with NOTICES Owyhee Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 30, 2016, Owyhee Hydro LLC filed a revised application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Owyhee Pumped Storage Project (Owyhee Project or project) to be located on Lake Owyhee near Adrian in Malheur County, Oregon. The sole purpose of a preliminary permit, if issued, is to grant the permit holder VerDate Sep<11>2014 17:00 Jul 07, 2016 Jkt 238001 priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new 1,200-foot-long zoned earth and rockfill or concrete-face rockfill dam forming a lined upper reservoir with a surface area of 109 acres and a storage capacity of 4,035 acre-feet at a maximum surface elevation of 4,320 feet mean sea level (msl); (2) an existing 833 foot-long concrete arch dam forming the existing Lake Owyhee (lower reservoir) with a surface area of 13,900 acres and a storage capacity of 1,120,000 acre-feet at a maximum surface elevation of 2,650 msl; (3) a new 14,100 foot-long conduit connecting the upper and lower reservoirs consisting of a 2,200 foot-long, 17.1 foot-diameter concrete lined low-pressure tunnel, a 7,100 foot-long, 17.1 foot-diameter concrete and steel-lined pressure shaft, and a 4,800-foot-long, 20.5 foot-diameter concrete-lined tailrace; (4) a new 80 feet long by 280 feet wide by 120 feet high powerhouse containing four reversible pump-turbine units rated at 125 megawatts (MW) each for a total capacity of 500 MW; (5) either 2.6 or 8 miles of 500-kilovolt transmission line interconnecting with the BoardmanHemingway Line, depending on design of infrastructure; and (6) appurtenant facilities. The estimated annual generation of the Owyhee Project would be 1,533,000 megawatt-hours. Applicant Contact: Mr. Matthew Shapiro, CEO, Gridflex Energy, LLC, 1210 W. Franklin St., Ste. 2, Boise, Idaho 83702; phone: (208) 246–9925. FERC Contact: Julia Kolberg; phone: (202) 502–8261. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14786–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14768) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: July 1, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–16166 Filed 7–7–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Staff Attendance at the Southwest Power Pool Markets and Operations Policy Committee Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting of the Southwest Power Pool, Inc. Markets and Operations Policy Committee as noted below. Their attendance is part of the Commission’s ongoing outreach efforts. The meeting will be held on July 12, 2016 from 8:00 a.m. to 5:00 p.m. and July 13, 2016 from 8:00 a.m. to 3:00 p.m. Mountain Time. The location of the meeting is at the Rushmore Plaza Holiday Inn, 505 North Fifth St., Rapid City, SD 57701. The hotel phone number is (605) 348–4000. The discussions may address matters at issue in the following proceedings: Docket No. ER11–1844, Midcontinent Independent System Operator, Inc. Docket No. EL12–60, Southwest Power Pool, Inc., et al. Docket No. ER12–959, Southwest Power Pool, Inc. Docket No. ER12–1179, Southwest Power Pool, Inc. Docket No. ER12–1586, Southwest Power Pool, Inc. Docket No. EL15–66, Southern Company Services, et al. v. Midcontinent Independent System Operator, Inc. Docket No. EL15–77, Morgan Stanley Capital Group Inc. v. Midcontinent Independent System Operator, Inc. E:\FR\FM\08JYN1.SGM 08JYN1

Agencies

[Federal Register Volume 81, Number 131 (Friday, July 8, 2016)]
[Notices]
[Page 44604]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-16166]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14786-000]


Owyhee Hydro LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On June 30, 2016, Owyhee Hydro LLC filed a revised application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Owyhee Pumped Storage 
Project (Owyhee Project or project) to be located on Lake Owyhee near 
Adrian in Malheur County, Oregon. The sole purpose of a preliminary 
permit, if issued, is to grant the permit holder priority to file a 
license application during the permit term. A preliminary permit does 
not authorize the permit holder to perform any land-disturbing 
activities or otherwise enter upon lands or waters owned by others 
without the owners' express permission.
    The proposed project would consist of the following: (1) A new 
1,200-foot-long zoned earth and rockfill or concrete-face rockfill dam 
forming a lined upper reservoir with a surface area of 109 acres and a 
storage capacity of 4,035 acre-feet at a maximum surface elevation of 
4,320 feet mean sea level (msl); (2) an existing 833 foot-long concrete 
arch dam forming the existing Lake Owyhee (lower reservoir) with a 
surface area of 13,900 acres and a storage capacity of 1,120,000 acre-
feet at a maximum surface elevation of 2,650 msl; (3) a new 14,100 
foot-long conduit connecting the upper and lower reservoirs consisting 
of a 2,200 foot-long, 17.1 foot-diameter concrete lined low-pressure 
tunnel, a 7,100 foot-long, 17.1 foot-diameter concrete and steel-lined 
pressure shaft, and a 4,800-foot-long, 20.5 foot-diameter concrete-
lined tailrace; (4) a new 80 feet long by 280 feet wide by 120 feet 
high powerhouse containing four reversible pump-turbine units rated at 
125 megawatts (MW) each for a total capacity of 500 MW; (5) either 2.6 
or 8 miles of 500-kilovolt transmission line interconnecting with the 
Boardman-Hemingway Line, depending on design of infrastructure; and (6) 
appurtenant facilities. The estimated annual generation of the Owyhee 
Project would be 1,533,000 megawatt-hours.
    Applicant Contact: Mr. Matthew Shapiro, CEO, Gridflex Energy, LLC, 
1210 W. Franklin St., Ste. 2, Boise, Idaho 83702; phone: (208) 246-
9925.
    FERC Contact: Julia Kolberg; phone: (202) 502-8261.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14786-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14768) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: July 1, 2016.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-16166 Filed 7-7-16; 8:45 am]