Notice of Commission Staff Attendance, 44605-44606 [2016-16163]
Download as PDF
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 131 / Friday, July 8, 2016 / Notices
Docket No. ER14–1183, Southwestern
Electric Power Company
Docket No. ER14–2445, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2850, Southwest
Power Pool, Inc.
Docket No. ER15–1499, Southwest
Power Pool, Inc.
Docket No. ER15–1775, Southwest
Power Pool, Inc.
Docket No. ER15–1777, Southwest
Power Pool, Inc.
Docket No. ER15–1943, Southwest
Power Pool, Inc.
Docket No. ER15–1976, Southwest
Power Pool, Inc.
Docket No. ER15–2028, Southwest
Power Pool, Inc.
Docket No. ER15–2069, Northwestern
Corporation
Docket No. ER15–2115, Southwest
Power Pool, Inc.
Docket No. ER15–2265, Southwest
Power Pool, Inc.
Docket No. ER15–2324, Southwest
Power Pool, Inc.
Docket No. ER15–2347, Southwest
Power Pool, Inc.
Docket No. ER15–2351, Southwest
Power Pool, Inc.
Docket No. ER15–2356, Southwest
Power Pool, Inc.
Docket No. EC16–53, South Central
MCN, LLC
Docket No. EL16–20, Grid Assurance
LLC
Docket No. EL16–70, Cottonwood Wind
Project, LLC v. Nebraska Public Power
District
Docket No. ER16–13, Southwest Power
Pool, Inc.
Docket No. ER16–204, Southwest Power
Pool, Inc.
Docket No. ER16–209, Southwest Power
Pool, Inc.
Docket No. ER16–228, Southwest Power
Pool, Inc.
Docket No. ER16–791, Southwest Power
Pool, Inc.
Docket No. ER16–829, Southwest Power
Pool, Inc.
Docket No. ER16–846, Southwest Power
Pool, Inc.
Docket No. ER16–862, Southwest Power
Pool, Inc.
Docket No. ER16–863, Southwest Power
Pool, Inc.
Docket No. ER16–932, Southwest Power
Pool, Inc.
Docket No. ER16–1086, Southwest
Power Pool, Inc.
Docket No. ER16–1211, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–1286, Southwest
Power Pool, Inc.
Docket No. ER16–1305, Southwest
Power Pool, Inc.
Docket No. ER16–1351, Westar Energy,
Inc.
VerDate Sep<11>2014
17:00 Jul 07, 2016
Jkt 238001
Docket No. ER16–1355, Westar Energy,
Inc.
Docket No. ER16–1314, Southwest
Power Pool, Inc.
Docket No. ER16–1341, Southwest
Power Pool, Inc.
Docket No. ER16–1544, Southwest
Power Pool, Inc.
Docket No. ER16–1546, Southwest
Power Pool, Inc.
Docket No. ER16–1605, Southwestern
Electric Power Company
Docket No. ER16–1618, Southwest
Power Pool, Inc.
Docket No. ER16–1676, Southwest
Power Pool, Inc.
Docket No. ER16–1709, Southwest
Power Pool, Inc.
Docket No. ER16–1710, Southwest
Power Pool, Inc.
Docket No. ER16–1711, Southwest
Power Pool, Inc.
Docket No. ER16–1712, Southwest
Power Pool, Inc.
Docket No. ER16–1713, Southwest
Power Pool, Inc.
Docket No. ER16–1715, Southwest
Power Pool, Inc.
Docket No. ER16–1772, Public Service
Company of Colorado
Docket No. ER16–1774, Southwest
Power Pool, Inc.
Docket No. ER16–1797, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–1799, Southwest
Power Pool, Inc.
Docket No. ER16–1812, Southwestern
Electric Power Company
Docket No. ER16–1814, Southwest
Power Pool, Inc.
Docket No. ER16–1826, Southwest
Power Pool, Inc.
Docket No. ER16–1905, Southwest
Power Pool, Inc.
Docket No. ER16–1912, Southwest
Power Pool, Inc.
Docket No. ER16–1945, Southwest
Power Pool, Inc.
Docket No. ER16–1951, Southwest
Power Pool, Inc.
Docket No. ER16–1959, Southwest
Power Pool, Inc.
Docket No. ER16–1989, Southwest
Power Pool, Inc.
These meetings are open to the public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
Dated: July 1, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–16164 Filed 7–7–16; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
44605
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
New York Independent System
Operator, Inc.
The New York Independent System
Operator, Inc. Electric System Planning
Working Group Meeting
July 5, 2016, 10:00 a.m.–4:00 p.m. (EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic_
espwg&directory=2016-07-05.
The New York Independent System
Operator, Inc. Business Issues
Committee Meeting
July 13, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic&
directory=2016-07-13.
The New York Independent System
Operator, Inc. Operating Committee
Meeting
July 14, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?
com=oc&directory=2016-07-14.
The New York Independent System
Operator, Inc. Electric System Planning
Working Group Meeting
July 26, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
E:\FR\FM\08JYN1.SGM
08JYN1
44606
Federal Register / Vol. 81, No. 131 / Friday, July 8, 2016 / Notices
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic_
espwg&directory=2016-07-26.
DEPARTMENT OF ENERGY
The New York Independent System
Operator, Inc. Management Committee
Meeting
[Project No. 14787–000]
July 27, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com
=mc&directory=2016-07-27.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
New York Independent System
Operator, Inc., Docket No. ER13–102.
New York Independent System
Operator, Inc., Docket No. ER15–
2059.
New York Independent System
Operator, Inc., Docket No. ER13–
1942.
New York Transco, LLC, Docket No.
ER15–572.
New York Independent System
Operator, Inc., Docket No. ER16–966.
New York Independent System
Operator, Inc., Docket No. ER16–
1968.
Boundless Energy NE, LLC, CityGreen
Transmission, Inc., and Miller Bros. v.
New York Independent System
Operator, Inc., Docket No. EL16–84.
New York Independent System
Operator, Inc., Docket No. ER16–
1785.
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
Dated: June 30, 2016.
Kimberly D. Bose,
Secretary.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
[FR Doc. 2016–16163 Filed 7–7–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:00 Jul 07, 2016
Jkt 238001
Federal Energy Regulatory
Commission
Black Canyon Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 13, 2016, the Black Canyon
Hydro, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Seminoe Pumped Storage Project
(project) to be located at the U.S. Bureau
of Reclamation’s (Reclamation) Seminoe
Reservoir on the North Platte River, near
Rawlins, Carbon County, Wyoming. The
project would occupy lands managed by
the U.S. Bureau of Reclamation and the
U.S. Bureau of Land Management. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) Two new intake
structures located in Reclamation’s
20,291-acre Seminoe Reservoir; (2) two
new concrete-faced, rock-fill upper
reservoirs—one 85 acres and one 63
acres—located on either side of, and
about 1,000 feet above, Seminoe
Reservoir; (3) a 3,000-foot-long, 18.8foot diameter, low pressure tunnel and
1,250-foot-long, 18.8-foot-diameter,
pressure shaft leading to a 250-foot-long,
65-foot-wide, 170-foot-high powerhouse
located 1,300 feet east of Seminoe
Reservoir in an underground cavern
with a 2,800-foot-long access tunnel and
a 1,300-foot-long, 22.6-foot wide
tailrace; (5) a 1,300-foot-long, 22.6-footdiameter, low pressure tunnel and
1,800-foot-long, 16.1-foot-diameter
pressure shaft leading to a 220-foot-long,
55-foot-wide, 120-foot-high powerhouse
located 2,800 feet north-northwest of
Seminoe reservoir in an underground
cavern with a 800-foot-long access
tunnel and a 2,800-foot-long, 19.3-footdiameter tailrace; (6) three 133.3megawatt (MW) adjustable-speed,
reversible pump turbines in the east
powerhouse; and (7) three 100-MW
adjustable-speed reversible pumpturbines in the west powerhouse. The
project would also include a doublecircuit, 230-kilovolt (kV) transmission
line connecting either at PacifiCorp’s
PO 00000
Frm 00027
Fmt 4703
Sfmt 9990
planned Aeolus Substation located
northwest of Medicine Bow, Wyoming,
or the planned northern terminal for the
TransWest Express DC Line near
Sinclair, Wyoming. If the Aeolus
interconnection alternative is built, the
line would parallel the existing Western
Area Power Administration’s (WAPA)
Miracle Mile-Cheyenne-Ault 230-kV
transmission line. If the TransWest
interconnection alternative is built, the
line would parallel or consist of a
rebuild of the existing WAPA Miracle
Mile-Sinclair, 115 kV transmission line.
The estimated annual generation would
be 1,839,600 MW-hours.
Applicant Contact: Mr. Matthew
Shapiro, Chief Executive Officer,
Gridflex Energy, LLC, 1210 W. Franklin
Street, Suite 2, Boise, ID 83702, phone:
(208) 246–9925.
FERC Contact: Suzanne Novak;
phone: (202) 502–6665.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14787–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14787) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: June 30, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–16167 Filed 7–7–16; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\08JYN1.SGM
08JYN1
Agencies
[Federal Register Volume 81, Number 131 (Friday, July 8, 2016)]
[Notices]
[Pages 44605-44606]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-16163]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission's staff may attend the following
meetings related to the transmission planning activities of the New
York Independent System Operator, Inc.
The New York Independent System Operator, Inc. Electric System Planning
Working Group Meeting
July 5, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=bic_espwg&directory=2016-07-05.
The New York Independent System Operator, Inc. Business Issues
Committee Meeting
July 13, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=bic&directory=2016-07-13.
The New York Independent System Operator, Inc. Operating Committee
Meeting
July 14, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=oc&directory=2016-07-14.
The New York Independent System Operator, Inc. Electric System Planning
Working Group Meeting
July 26, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
[[Page 44606]]
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=bic_espwg&directory=2016-07-26.
The New York Independent System Operator, Inc. Management Committee
Meeting
July 27, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/committees/documents.jsp?com=mc&directory=2016-07-27.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
New York Independent System Operator, Inc., Docket No. ER13-102.
New York Independent System Operator, Inc., Docket No. ER15-2059.
New York Independent System Operator, Inc., Docket No. ER13-1942.
New York Transco, LLC, Docket No. ER15-572.
New York Independent System Operator, Inc., Docket No. ER16-966.
New York Independent System Operator, Inc., Docket No. ER16-1968.
Boundless Energy NE, LLC, CityGreen Transmission, Inc., and Miller
Bros. v. New York Independent System Operator, Inc., Docket No. EL16-
84.
New York Independent System Operator, Inc., Docket No. ER16-1785.
For more information, contact James Eason, Office of Energy Market
Regulation, Federal Energy Regulatory Commission at (202) 502-8622 or
James.Eason@ferc.gov.
Dated: June 30, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-16163 Filed 7-7-16; 8:45 am]
BILLING CODE 6717-01-P