Federal Register / Vol. 81, No. 131 / Friday, July 8, 2016 / Notices
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—August 23, 2016.
90-day Federal Authorization
Decision Deadline—November 21, 2016.
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Project Description
Tennessee proposes to construct and
operate pipeline facilities, modify
existing aboveground facilities, and add
new tie-in facilities in Wayne and Pike
Counties, Pennsylvania.
The Project would consist of the
following facilities:
• Approximately 12.9 miles of new
36-inch-diameter looping 1 pipeline in
Wayne and Pike Counties,
Pennsylvania;
• a new internal pipeline inspection
(‘‘pig’’) 2 launcher, crossover, and
connecting facilities at the beginning of
the proposed pipeline loop in Wayne
County;
• a new pig receiver, crossover, and
connecting facilities at the end of the
proposed pipeline loop in Pike County;
and
• modifications at Tennessee’s
existing Compressor Station 323,
including rewheeling/restaging of an
existing compressor and other piping
and appurtenant modifications.
Background
On November 23, 2015, the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Orion Project and
Request for Comments on
Environmental Issues (NOI). On
December 3, 2015, the Commission
issued a supplemental NOI extending
the scoping period for the Project. The
NOI and supplemental NOI were sent to
affected landowners; federal, state, and
local government agencies; elected
officials; environmental and public
interest groups; Native American tribes;
other interested parties; and local
libraries and newspapers. In response to
the NOIs, the Commission received
comments from the National Park
Service and several individuals. The
comments primarily concerned impacts
on water resources, land use, recreation,
air quality, and reliability and safety.
1 A pipeline loop is a segment of pipe constructed
parallel to an existing pipeline to increase capacity.
2 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
VerDate Sep<11>2014
17:00 Jul 07, 2016
Jkt 238001
The U.S. Army Corps of Engineers is
a cooperating agency in the preparation
of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP16–4), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: June 30, 2016.
Kimberly D. Bose,
Secretary.
Management Project, Review Period
Ends: 08/08/2016, Contact: Mickey
Sugg 910–251–4811.
EIS No. 20160149, Final, BIA, FL,
Seminole Tribe of Florida Fee to
Trust, Review Period Ends: 08/08/
2016, Contact: Chester McGhee 615–
564–6830.
EIS No. 20160150, Final Supplement,
NIGC, CA, Jamul Indian Village,
Review Period Ends: 08/08/2016,
Contact: Andrew Mendoza 202–634–
0012.
EIS No. 20160151, Final, BLM, CO, Bull
Mountain Unit Master Development
Plan, Review Period Ends: 08/08/
2016, Contact: Gina Jones 970–240–
5300.
EIS No. 20160152, Draft, USFS, NM,
Santa Fe National Forest Geothermal
Leasing, Comment Period Ends:
08/22/2016, Contact: Larry Gore 575–
289–3264.
Amended Notices
EIS No. 20160128, Final, USACE, NC,
Morehead City Harbor Integrated
Dredged Material Management Plan,
Review Period Ends: 08/11/2016,
Contact: Jennifer Owens 910–251–
4757.
Revision to FR Notice Published
06/10/2016; Extending Review Period
from 07/11/2016 to 08/11/2016.
Dated: July 1, 2016.
Dawn Roberts,
Management Analyst, NEPA Compliance
Division, Office of Federal Activities.
[FR Doc. 2016–16310 Filed 7–7–16; 8:45 am]
[FR Doc. 2016–16168 Filed 7–7–16; 8:45 am]
BILLING CODE 6560–50–P
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9027–9]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EISs)
Filed 06/27/2016 Through 07/01/2016
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20160148, Final, USACE, NC,
Figure Eight Island Shoreline
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2016–0289; FRL–9948–75–
OAR]
Draft Guidance on Progress Tracking
Metrics, Long-Term Strategies,
Reasonable Progress Goals and Other
Requirements for Regional Haze State
Implementation Plans for the Second
Implementation Period
Environmental Protection
Agency (EPA).
ACTION: Notice of availability and public
comment period.
AGENCY:
Notice is hereby given that
the Environmental Protection Agency
(EPA) has posted on its Web site a draft
guidance document titled, ‘‘Draft
Guidance on Progress Tracking Metrics,
Long-Term Strategies, Reasonable
Progress Goals and Other Requirements
for Regional Haze State Implementation
Plans for the Second Implementation
SUMMARY:
E:\FR\FM\08JYN1.SGM
08JYN1
Federal Register / Vol. 81, No. 131 / Friday, July 8, 2016 / Notices
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Period.’’ The EPA invites the public to
review and provide input on its draft
guidance document during the comment
period specified in the DATES section.
DATES: Comments must be received on
or before August 22, 2016. Please refer
to SUPPLEMENTARY INFORMATION for
additional information on the comment
period.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–HQ–
OAR–2016–0289, at https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Once submitted, comments cannot be
edited or removed from Regulations.gov.
The EPA may publish any comment
received to its public docket. Do not
submit electronically any information
you consider to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute. Multimedia
submissions (audio, video, etc.) must be
accompanied by a written comment.
The written comment is considered the
official comment and should include
discussion of all points you wish to
make. The EPA will generally not
consider comments or comment
contents located outside of the primary
submission (i.e., on the Web, Cloud, or
other file sharing system). For
additional submission methods, the full
EPA public comment policy,
information about CBI or multimedia
submissions and general guidance on
making effective comments, please visit
https://www2.epa.gov/dockets/
commenting-epa-dockets.
FOR FURTHER INFORMATION CONTACT: For
general questions concerning this draft
guidance document, please contact Phil
Lorang, U.S. EPA, Office of Air Quality
Planning and Standards, Air Quality
Policy Division, C539–04, Research
Triangle Park, NC 27711, telephone
(919) 541–5463, email at lorang.phil@
epa.gov. For questions about section 5 of
this draft guidance document, please
contact Melinda Beaver, U.S. EPA,
Office of Air Quality Planning and
Standards, Air Quality Policy Division,
C539–04, Research Triangle Park, NC
27711, telephone (919) 541–1062, email
at beaver.melinda@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Purpose
The purpose of the draft document on
which the EPA is inviting public
comment is to provide useful
background information and guidance
to states on how to develop and submit
regional haze state implementation
plans (SIPs) for the second
implementation period (2018–2028),
which under a proposed revision to the
VerDate Sep<11>2014
17:00 Jul 07, 2016
Jkt 238001
Regional Haze Rule published on May 4,
2016,1 would be due by July 31, 2021.
The required content of these SIPs is
specified in 40 CFR 51.308(f), which has
also been proposed for revision.2
II. Instructions for Submitting Public
Comments and Internet Web Site for
Guidance Document Information
A. What should I consider as I prepare
my comments for the EPA?
44609
The Web site provides related
information that the public may find
useful.
Dated: June 30, 2016.
Stephen Page,
Director, Office of Air Quality Planning and
Standards.
[FR Doc. 2016–16131 Filed 7–7–16; 8:45 am]
BILLING CODE 6560–50–P
1. Submitting CBI. Do not submit this
information to the EPA through
www.regulations.gov or email. Clearly
mark the part or all of the information
that you claim to be CBI. For CBI in a
disk or CD ROM that you mail to the
EPA, mark the outside of the disk or CD
ROM as CBI and then identify
electronically within the disk or CD
ROM the specific information that is
claimed as CBI. In addition to one
complete version of the comment that
includes information claimed as CBI, a
copy of the comment that does not
contain the information claimed as CBI
must be submitted for inclusion in the
public docket. Information so marked
will not be disclosed except in
accordance with procedures set forth in
40 CFR part 2. Send or deliver
information identified as CBI only to the
following address: Tiffany Purifoy,
OAQPS CBI Officer, U.S. EPA, Office of
Air Quality Planning and Standards,
Mail Code C404–02, Research Triangle
Park, NC 27711, telephone (919) 541–
0878, email at purifoy.tiffany@epa.gov,
Attention Docket ID No. EPA–HQ–
OAR–2016–0289.
2. Tips for Preparing Your Comments.
When submitting comments, remember
to:
• Identify the draft guidance by
docket number and other identifying
information (subject heading, Federal
Register date and page number).
• Follow directions.
• Explain why you agree or disagree;
suggest alternatives and substitute
language for your requested changes.
FEDERAL DEPOSIT INSURANCE
CORPORATION
B. Where can I find additional
information for this draft guidance?
FEDERAL ELECTION COMMISSION
The EPA has also established a Web
site for this draft guidance at https://
www.epa.gov/visibility. From this page,
please click on ‘‘Guidance Documents.’’
Sunshine Act Meeting
1 Protection of Visibility: Amendments to
Requirements for State Plans: Proposed Rule, May
4, 2016, 81 FR 26942.
2 For clarity for purposes of comment, the draft
guidance document available for public comment is
written as if the revisions of the Regional Haze Rule
proposed in May 2016 have been finalized as
proposed. If the final revisions to the Regional Haze
Rule differ from this assumption, corresponding
changes will be made in the final guidance
document.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Notice of Termination; 10293, Haven
Trust Bank Florida, Ponte Vedra
Beach, Florida
The Federal Deposit Insurance
Corporation (FDIC), as Receiver for
10293, Haven Trust Bank Florida, Ponte
Vedra Beach, Florida (Receiver) has
been authorized to take all actions
necessary to terminate the receivership
estate of Haven Trust Bank Florida
(Receivership Estate); the Receiver has
made all dividend distributions
required by law.
The Receiver has further irrevocably
authorized and appointed FDICCorporate as its attorney-in-fact to
execute and file any and all documents
that may be required to be executed by
the Receiver which FDIC-Corporate, in
its sole discretion, deems necessary;
including but not limited to releases,
discharges, satisfactions, endorsements,
assignments and deeds.
Effective July 1, 2016, the
Receivership Estate has been
terminated, the Receiver discharged,
and the Receivership Estate has ceased
to exist as a legal entity.
Dated: July 5, 2016.
Federal Deposit Insurance Corporation.
Robert E. Feldman,
Executive Secretary.
[FR Doc. 2016–16202 Filed 7–7–16; 8:45 am]
BILLING CODE 6714–01–P
Federal Election Commission.
Tuesday, July 12, 2016
at 10:00 a.m.
PLACE: 999 E Street NW., Washington,
DC.
STATUS: This meeting will be closed to
the public.
ITEMS TO BE DISCUSSED: Compliance
matters pursuant to 52 U.S.C. 30109.
Matters concerning participation in civil
actions or proceeding, or arbitration.
Information the premature disclosure of
AGENCY:
DATES AND TIMES:
E:\FR\FM\08JYN1.SGM
08JYN1
Agencies
[Federal Register Volume 81, Number 131 (Friday, July 8, 2016)]
[Notices]
[Pages 44608-44609]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-16131]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OAR-2016-0289; FRL-9948-75-OAR]
Draft Guidance on Progress Tracking Metrics, Long-Term
Strategies, Reasonable Progress Goals and Other Requirements for
Regional Haze State Implementation Plans for the Second Implementation
Period
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice of availability and public comment period.
-----------------------------------------------------------------------
SUMMARY: Notice is hereby given that the Environmental Protection
Agency (EPA) has posted on its Web site a draft guidance document
titled, ``Draft Guidance on Progress Tracking Metrics, Long-Term
Strategies, Reasonable Progress Goals and Other Requirements for
Regional Haze State Implementation Plans for the Second Implementation
[[Page 44609]]
Period.'' The EPA invites the public to review and provide input on its
draft guidance document during the comment period specified in the
DATES section.
DATES: Comments must be received on or before August 22, 2016. Please
refer to SUPPLEMENTARY INFORMATION for additional information on the
comment period.
ADDRESSES: Submit your comments, identified by Docket ID No. EPA-HQ-
OAR-2016-0289, at https://www.regulations.gov. Follow the online
instructions for submitting comments. Once submitted, comments cannot
be edited or removed from Regulations.gov. The EPA may publish any
comment received to its public docket. Do not submit electronically any
information you consider to be Confidential Business Information (CBI)
or other information whose disclosure is restricted by statute.
Multimedia submissions (audio, video, etc.) must be accompanied by a
written comment. The written comment is considered the official comment
and should include discussion of all points you wish to make. The EPA
will generally not consider comments or comment contents located
outside of the primary submission (i.e., on the Web, Cloud, or other
file sharing system). For additional submission methods, the full EPA
public comment policy, information about CBI or multimedia submissions
and general guidance on making effective comments, please visit https://www2.epa.gov/dockets/commenting-epa-dockets.
FOR FURTHER INFORMATION CONTACT: For general questions concerning this
draft guidance document, please contact Phil Lorang, U.S. EPA, Office
of Air Quality Planning and Standards, Air Quality Policy Division,
C539-04, Research Triangle Park, NC 27711, telephone (919) 541-5463,
email at lorang.phil@epa.gov. For questions about section 5 of this
draft guidance document, please contact Melinda Beaver, U.S. EPA,
Office of Air Quality Planning and Standards, Air Quality Policy
Division, C539-04, Research Triangle Park, NC 27711, telephone (919)
541-1062, email at beaver.melinda@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Purpose
The purpose of the draft document on which the EPA is inviting
public comment is to provide useful background information and guidance
to states on how to develop and submit regional haze state
implementation plans (SIPs) for the second implementation period (2018-
2028), which under a proposed revision to the Regional Haze Rule
published on May 4, 2016,\1\ would be due by July 31, 2021. The
required content of these SIPs is specified in 40 CFR 51.308(f), which
has also been proposed for revision.\2\
---------------------------------------------------------------------------
\1\ Protection of Visibility: Amendments to Requirements for
State Plans: Proposed Rule, May 4, 2016, 81 FR 26942.
\2\ For clarity for purposes of comment, the draft guidance
document available for public comment is written as if the revisions
of the Regional Haze Rule proposed in May 2016 have been finalized
as proposed. If the final revisions to the Regional Haze Rule differ
from this assumption, corresponding changes will be made in the
final guidance document.
---------------------------------------------------------------------------
II. Instructions for Submitting Public Comments and Internet Web Site
for Guidance Document Information
A. What should I consider as I prepare my comments for the EPA?
1. Submitting CBI. Do not submit this information to the EPA
through www.regulations.gov or email. Clearly mark the part or all of
the information that you claim to be CBI. For CBI in a disk or CD ROM
that you mail to the EPA, mark the outside of the disk or CD ROM as CBI
and then identify electronically within the disk or CD ROM the specific
information that is claimed as CBI. In addition to one complete version
of the comment that includes information claimed as CBI, a copy of the
comment that does not contain the information claimed as CBI must be
submitted for inclusion in the public docket. Information so marked
will not be disclosed except in accordance with procedures set forth in
40 CFR part 2. Send or deliver information identified as CBI only to
the following address: Tiffany Purifoy, OAQPS CBI Officer, U.S. EPA,
Office of Air Quality Planning and Standards, Mail Code C404-02,
Research Triangle Park, NC 27711, telephone (919) 541-0878, email at
purifoy.tiffany@epa.gov, Attention Docket ID No. EPA-HQ-OAR-2016-0289.
2. Tips for Preparing Your Comments. When submitting comments,
remember to:
Identify the draft guidance by docket number and other
identifying information (subject heading, Federal Register date and
page number).
Follow directions.
Explain why you agree or disagree; suggest alternatives
and substitute language for your requested changes.
B. Where can I find additional information for this draft guidance?
The EPA has also established a Web site for this draft guidance at
https://www.epa.gov/visibility. From this page, please click on
``Guidance Documents.'' The Web site provides related information that
the public may find useful.
Dated: June 30, 2016.
Stephen Page,
Director, Office of Air Quality Planning and Standards.
[FR Doc. 2016-16131 Filed 7-7-16; 8:45 am]
BILLING CODE 6560-50-P