Combined Notice of Filings, 44016-44017 [2016-15874]

Download as PDF ehiers on DSK5VPTVN1PROD with NOTICES 44016 Federal Register / Vol. 81, No. 129 / Wednesday, July 6, 2016 / Notices Filed Date: 6/28/16. Accession Number: 20160628–5283. Comments Due: 5 p.m. ET 7/19/16. Docket Numbers: ER16–999–003. Applicants: Greenleaf Energy Unit 1 LLC. Description: Triennial Update for Southwest Region of Greenleaf Energy Unit 1 LLC. Filed Date: 6/28/16. Accession Number: 20160628–5285. Comments Due: 5 p.m. ET 8/29/16. Docket Numbers: ER16–2062–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2045R5 Westar Energy, Inc. NITSA and NOA to be effective 9/1/2016. Filed Date: 6/29/16. Accession Number: 20160629–5063. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2063–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2390R4 Westar Energy, Inc. NITSA and NOA (Herington) to be effective 9/1/ 2016. Filed Date: 6/29/16. Accession Number: 20160629–5070. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2064–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended LGIA NextEra Blythe Solar Energy Center, LLC—Dracker Project to be effective 6/30/2016. Filed Date: 6/29/16. Accession Number: 20160629–5076. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2065–000. Applicants: Otter Tail Power Company. Description: § 205(d) Rate Filing: Notice of Termination of Service Agreement for Ancillary Services for Otter Tail to be effective 5/12/2016. Filed Date: 6/29/16. Accession Number: 20160629–5077. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2066–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2491R4 Westar Energy, Inc. NITSA and NOA (Scranton) to be effective 9/1/ 2016. Filed Date: 6/29/16. Accession Number: 20160629–5082. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2067–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1890R5 Westar Energy, Inc. NITSA and NOA (Moran) to be effective 9/1/2016. VerDate Sep<11>2014 15:04 Jul 05, 2016 Jkt 238001 Filed Date: 6/29/16. Accession Number: 20160629–5083. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2067–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 1890R5 Westar Energy, Inc. NITSA and NOA (Moran) to be effective 9/1/2016. Filed Date: 6/29/16. Accession Number: 20160629–5180. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2068–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised Service Agreement No. 4288; Queue No. AB1–064 to be effective 6/1/ 2016. Filed Date: 6/29/16. Accession Number: 20160629–5089. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2069–000. Applicants: MidAmerican Energy Company. Description: § 205(d) Rate Filing: Market-Based Rate Tariff—5th Rev. to be effective 6/30/2016. Filed Date: 6/29/16. Accession Number: 20160629–5127. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2070–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1978R5 Westar Energy, Inc. NITSA and NOA (Toronto) to be effective 9/1/2016. Filed Date: 6/29/16. Accession Number: 20160629–5130. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2071–000. Applicants: Innovative Solar 43, LLC. Description: Baseline eTariff Filing: Innovative Solar 43, LLC MBR Tariff to be effective 6/30/2016. Filed Date: 6/29/16. Accession Number: 20160629–5155. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2072–000. Applicants: PacifiCorp. Description: Tariff Cancellation: Termination of BPA Construction Agmt (USBR Green Springs R1) to be effective 8/29/2016. Filed Date: 6/29/16. Accession Number: 20160629–5170. Comments Due: 5 p.m. ET 7/20/16. Docket Numbers: ER16–2073–000. Applicants: Shell Energy North America (US), L.P. Description: Market-Based Triennial Review Filing: Southwest Triennial & 819 Revisions to be effective 6/30/2016. Filed Date: 6/29/16. Accession Number: 20160629–5191. Comments Due: 5 p.m. ET 8/29/16. The filings are accessible in the Commission’s eLibrary system by PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 29, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–15944 Filed 7–5–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP16–1040–000. Applicants: National Fuel Gas Supply Corporation. Description: Compliance filing Notice Regarding Non-Jurisdictional Gathering Facilities. Filed Date: 6/22/16. Accession Number: 20160622–5057. Comments Due: 5 p.m. ET 7/5/16. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP16–943–001. Applicants: Vector Pipeline L.P. Description: Compliance filing Negotiated Rate RP16–943. Compliance Filing to be effective 6/1/2016. Filed Date: 6/22/16. Accession Number: 20160622–5017. Comments Due: 5 p.m. ET 7/5/16. Any person desiring to protest in any of the above proceedings must file in E:\FR\FM\06JYN1.SGM 06JYN1 Federal Register / Vol. 81, No. 129 / Wednesday, July 6, 2016 / Notices accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 23, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–15874 Filed 7–5–16; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2013–0547; FRL–9948– 66–OECA] Proposed Information Collection Request; Comment Request; Performance Evaluation Studies on Wastewater Laboratories (Renewal); EPA ICR No. 0234.12, OMB Control No. 2080–0021 Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency is planning to submit an information collection request (ICR), ‘‘Performance Evaluation Studies on Wastewater Laboratories’’ (EPA ICR No. 0234.12, OMB Control No. 2080–0021) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. This is a proposed extension of the ICR, which is currently approved through March 31, 2017. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. DATES: Comments must be submitted on or before September 6, 2016. ADDRESSES: Submit your comments, referencing Docket ID No. EPA–HQ– OECA–2013–0547, online using www.regulations.gov (our preferred method), by email to docket.oeca@ epa.gov, or by mail to: EPA Docket ehiers on DSK5VPTVN1PROD with NOTICES SUMMARY: VerDate Sep<11>2014 15:04 Jul 05, 2016 Jkt 238001 Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW., Washington, DC 20460. EPA’s policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Brian Krausz, Monitoring, Assistance, and Media Programs Division, Office of Compliance, (2227A), Environmental Protection Agency, 1200 Pennsylvania Avenue NW., Washington, DC 20460; telephone number: (202) 564–3069; fax number: (202) 564–0038; email address: Krausz.Brian@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov or in person at the EPA Docket Center, WJC West, Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit https://www.epa.gov/ dockets. Pursuant to section 3506(c)(2)(A) of the PRA, EPA is soliciting comments and information to enable it to: (i) Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the Agency, including whether the information will have practical utility; (ii) evaluate the accuracy of the Agency’s estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (iii) enhance the quality, utility, and clarity of the information to be collected; and (iv) minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submission of responses. EPA will consider the comments received and amend the ICR as appropriate. The final ICR package will then be submitted to OMB for review and approval. At that time, EPA will issue another Federal Register notice to announce the submission of the ICR to OMB and the opportunity to submit additional comments to OMB. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 44017 Abstract: Discharge Monitoring Report-Quality Assurance (DMR–QA) study program participation is mandatory for major and selected minor National Pollution Discharge Elimination System (NPDES) permit holders in accordance with Clean Water Act Section 308. The DMR–QA study program is designed to evaluate the analytic ability of laboratories that perform chemical, microbiological and whole effluent toxicity (WET) analyses required in NPDES permits for reporting results in the Discharge Monitoring Reports (DMR). Under DMR–QA, the permit holder is responsible for having their in-house and/or contract laboratories perform proficiency test samples, and submit results for grading to proficiency testing (PT) providers. Graded results are transmitted by either the permittee or PT provider to the appropriate federal or state NPDES regulatory authority. Permit holders are responsible for submitting corrective action reports to the appropriate regulatory authority. Form Numbers: 6400–01. Respondents/affected entities: Major and selected minor permit holders under the Clean Water Act’s National Pollution Discharge Elimination System (NPDES). Respondent’s obligation to respond: Mandatory under Clean Water Act Section 308(a). Estimated number of respondents: 5,700 (total). Frequency of response: Major permit holders must participate annually. Minor permit holders must participate if selected by the state or EPA DMR–QA coordinator. Total estimated burden: 37,620 hours (per year). Burden is defined at 5 CFR 1320.03(b). Total estimated cost: $4,378,968 (per year), includes $2,459,037 annualized capital or operation & maintenance costs. Changes in estimates: There will be an approximate increase of 1,261 hours in the total estimated respondent burden compared with the ICR currently approved by OMB. This is due to increased discretionary selection of NPDES minor permit holders for DMR– QA participation in the most recent year. Labor costs will be revised upward to take into account changes in employee benefit compensation costs and inflation. Non-labor costs for obtaining proficiency test samples will also likely increase. E:\FR\FM\06JYN1.SGM 06JYN1

Agencies

[Federal Register Volume 81, Number 129 (Wednesday, July 6, 2016)]
[Notices]
[Pages 44016-44017]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-15874]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP16-1040-000.
    Applicants: National Fuel Gas Supply Corporation.
    Description: Compliance filing Notice Regarding Non-Jurisdictional 
Gathering Facilities.
    Filed Date: 6/22/16.
    Accession Number: 20160622-5057.
    Comments Due: 5 p.m. ET 7/5/16.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and Sec.  385.214) on or 
before 5:00 p.m. Eastern time on the specified comment date. Protests 
may be considered, but intervention is necessary to become a party to 
the proceeding.

Filings in Existing Proceedings

    Docket Numbers: RP16-943-001.
    Applicants: Vector Pipeline L.P.
    Description: Compliance filing Negotiated Rate RP16-943. Compliance 
Filing to be effective 6/1/2016.
    Filed Date: 6/22/16.
    Accession Number: 20160622-5017.
    Comments Due: 5 p.m. ET 7/5/16.
    Any person desiring to protest in any of the above proceedings must 
file in

[[Page 44017]]

accordance with Rule 211 of the Commission's Regulations (18 CFR 
385.211) on or before 5:00 p.m. Eastern time on the specified comment 
date.
    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 23, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-15874 Filed 7-5-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.