Combined Notice of Filings #2, 40692-40693 [2016-14765]
Download as PDF
mstockstill on DSK3G9T082PROD with NOTICES
40692
Federal Register / Vol. 81, No. 120 / Wednesday, June 22, 2016 / Notices
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2146–199.
k. Description of Request: Alabama
Power requests approval to modify Unit
1 at the Jordan Development to address
significant maintenance needs and to
improve power and efficiency. The
proposed scope of work for Unit 1
includes complete turbine replacement,
wicket gate replacement, governor and
servomotor system replacement, turbine
and thrust bearing refurbishment, and
related component replacement.
Alabama Power also proposes to extend
of vacuum breaker piping to enhance
Unit 1’s aerating capability through a
draft tube aeration system that will be
operated in a similar manner as Units 2,
3, and 4. Alabama Power states the
turbine replacement is not expected to
result in an increase to the total rated
capacity or the maximum discharge of
the unit at rated conditions. Alabama
Power notes that project operations will
not change, refurbishment will not
include any structural changes to the
project facilities, and no changes will be
made to the project boundary.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits
(P–2146) in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
VerDate Sep<11>2014
20:02 Jun 21, 2016
Jkt 238001
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). All comments,
motions to intervene, or protests should
relate to project works that are the
subject of the license amendment.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: June 16, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–14758 Filed 6–21–16; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–2275–001;
EC14–129–001.
Applicants: Lexington Power & Light,
LLC.
Description: Notice of Material
Change in Status of Lexington Power &
Light, LLC.
Filed Date: 6/15/16.
Accession Number: 20160615–5163.
Comments Due: 5 p.m. ET 7/6/16.
Docket Numbers: ER14–2952–005.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Report Filing: 2016–06–
15_SSR Cost Allocation Refund Report
Supplement to be effective N/A.
Filed Date: 6/15/16.
Accession Number: 20160615–5028.
Comments Due: 5 p.m. ET 7/6/16.
Docket Numbers: ER16–425–003.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
Compliance re: effective date scarcity
pricing spplmntl rvsns to be effective 6/
30/2016.
Filed Date: 6/16/16.
Accession Number: 20160616–5132.
Comments Due: 5 p.m. ET 6/28/16.
Docket Numbers: ER16–1944–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: Amendment to WMPA SA No.
3236, Queue No. W4–064 to be effective
3/6/2015.
Filed Date: 6/16/16.
Accession Number: 20160616–5096.
Comments Due: 5 p.m. ET 7/7/16
Docket Numbers: ER16–1945–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: 3211 NIMECA NITSA NOA;
Cancellation of 3124 Basin NITSA NOA
to be effective 6/1/2016.
Filed Date: 6/16/16.
Accession Number: 20160616–5098.
Comments Due: 5 p.m. ET 7/7/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
E:\FR\FM\22JNN1.SGM
22JNN1
Federal Register / Vol. 81, No. 120 / Wednesday, June 22, 2016 / Notices
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 16, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–14765 Filed 6–21–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD16–13–000]
Three Sisters Irrigation District; Notice
of Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On June 2, 2016, as supplemented on
June 13, 2016, Three Sisters Irrigation
District filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Watson
Net Meter/Micro Hydroelectric
Demonstration Facility would have an
installed capacity of 198.6 kilowatts
(kW), and would be located along the
outlet pipe for an existing irrigation
pipeline, the Watson McKenzie Main
Canal South Pipe. The project would be
located in the town of Sisters, Deschutes
County, Oregon.
40693
Applicant Contact: Marc Thalacker,
P.O. Box 2230, Sisters, OR 97759, Phone
No. (541) 549–8815.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
Christopher.Chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A new
powerhouse, approximately 20 feet by
40 feet, along the existing 24-inchdiameter outlet pipe of the 54-inchdiameter Watson McKenzie Main Canal
South Pipe; (2) four new turbine/
generating units with a total installed
capacity of 198.6 kW; (3) four new, short
intake pipes of variable diameters; (4)
four new, short discharge pipes of
variable diameters; (5) a discharge pool
structure, approximately 13.5 feet by 25
feet, with two 36-inch-diameter outlet
pipes to Watson Reservoir; and (6)
appurtenant facilities.
The proposed project would have a
total installed capacity of 198.6 kW.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
mstockstill on DSK3G9T082PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: The
proposed addition of the hydroelectric
project along the existing irrigation
pipeline will not alter its primary
purpose. Therefore, based upon the
above criteria, Commission staff
preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
VerDate Sep<11>2014
20:02 Jun 21, 2016
Jkt 238001
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Y
Y
Y
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
1 18
E:\FR\FM\22JNN1.SGM
CFR 385.2001–2005 (2015).
22JNN1
Agencies
[Federal Register Volume 81, Number 120 (Wednesday, June 22, 2016)]
[Notices]
[Pages 40692-40693]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-14765]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-2275-001; EC14-129-001.
Applicants: Lexington Power & Light, LLC.
Description: Notice of Material Change in Status of Lexington Power
& Light, LLC.
Filed Date: 6/15/16.
Accession Number: 20160615-5163.
Comments Due: 5 p.m. ET 7/6/16.
Docket Numbers: ER14-2952-005.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Report Filing: 2016-06-15_SSR Cost Allocation Refund
Report Supplement to be effective N/A.
Filed Date: 6/15/16.
Accession Number: 20160615-5028.
Comments Due: 5 p.m. ET 7/6/16.
Docket Numbers: ER16-425-003.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: Compliance re: effective date
scarcity pricing spplmntl rvsns to be effective 6/30/2016.
Filed Date: 6/16/16.
Accession Number: 20160616-5132.
Comments Due: 5 p.m. ET 6/28/16.
Docket Numbers: ER16-1944-000.
Applicants: PJM Interconnection, L.L.C.
Description: Section 205(d) Rate Filing: Amendment to WMPA SA No.
3236, Queue No. W4-064 to be effective 3/6/2015.
Filed Date: 6/16/16.
Accession Number: 20160616-5096.
Comments Due: 5 p.m. ET 7/7/16
Docket Numbers: ER16-1945-000.
Applicants: Southwest Power Pool, Inc.
Description: Section 205(d) Rate Filing: 3211 NIMECA NITSA NOA;
Cancellation of 3124 Basin NITSA NOA to be effective 6/1/2016.
Filed Date: 6/16/16.
Accession Number: 20160616-5098.
Comments Due: 5 p.m. ET 7/7/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and
[[Page 40693]]
385.214) on or before 5:00 p.m. Eastern time on the specified comment
date. Protests may be considered, but intervention is necessary to
become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 16, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-14765 Filed 6-21-16; 8:45 am]
BILLING CODE 6717-01-P