Three Sisters Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 40693-40694 [2016-14762]

Download as PDF Federal Register / Vol. 81, No. 120 / Wednesday, June 22, 2016 / Notices 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 16, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–14765 Filed 6–21–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD16–13–000] Three Sisters Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On June 2, 2016, as supplemented on June 13, 2016, Three Sisters Irrigation District filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA), as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed Watson Net Meter/Micro Hydroelectric Demonstration Facility would have an installed capacity of 198.6 kilowatts (kW), and would be located along the outlet pipe for an existing irrigation pipeline, the Watson McKenzie Main Canal South Pipe. The project would be located in the town of Sisters, Deschutes County, Oregon. 40693 Applicant Contact: Marc Thalacker, P.O. Box 2230, Sisters, OR 97759, Phone No. (541) 549–8815. FERC Contact: Christopher Chaney, Phone No. (202) 502–6778, email: Christopher.Chaney@ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A new powerhouse, approximately 20 feet by 40 feet, along the existing 24-inchdiameter outlet pipe of the 54-inchdiameter Watson McKenzie Main Canal South Pipe; (2) four new turbine/ generating units with a total installed capacity of 198.6 kW; (3) four new, short intake pipes of variable diameters; (4) four new, short discharge pipes of variable diameters; (5) a discharge pool structure, approximately 13.5 feet by 25 feet, with two 36-inch-diameter outlet pipes to Watson Reservoir; and (6) appurtenant facilities. The proposed project would have a total installed capacity of 198.6 kW. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA .. The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts .................. Y FPA 30(a)(3)(C)(i), as amended by HREA mstockstill on DSK3G9T082PROD with NOTICES FPA 30(a)(3)(C)(ii), as amended HREA. FPA 30(a)(3)(C)(iii), as amended HREA. by by On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Preliminary Determination: The proposed addition of the hydroelectric project along the existing irrigation pipeline will not alter its primary purpose. Therefore, based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with VerDate Sep<11>2014 20:02 Jun 21, 2016 Jkt 238001 the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Y Y Y Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 1 18 E:\FR\FM\22JNN1.SGM CFR 385.2001–2005 (2015). 22JNN1 40694 Federal Register / Vol. 81, No. 120 / Wednesday, June 22, 2016 / Notices 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (i.e., CD16–13) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: June 16, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–14762 Filed 6–21–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–1925–000] mstockstill on DSK3G9T082PROD with NOTICES Pavant Solar II LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Pavant Solar II LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket VerDate Sep<11>2014 20:02 Jun 21, 2016 Jkt 238001 authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is July 6, 2016. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 16, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–14756 Filed 6–21–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–93–000. Applicants: Atlas Power Finance, LLC, Dynegy Inc., Energy Capital Partners III, LLC, GDF Suez Energy North America, Inc. Description: Supplement to March 25, 2016 Joint Application for Authorization under FPA Section 203 of Atlas Power Finance, et al. Filed Date: 6/15/16. Accession Number: 20160615–5149. Comments Due: 5 p.m. ET 6/29/16. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–1254–002. Applicants: MMP SCO, LLC. Description: Tariff Amendment: Second Amendment to Application for Market-Based Rate Authorization to be effective 6/15/2016. Filed Date: 6/15/16. Accession Number: 20160615–5131. Comments Due: 5 p.m. ET 6/27/16. Docket Numbers: ER16–1882–000. Applicants: Boulder Solar Power, LLC. Description: Baseline eTariff Filing: Market-Based Rate Tariff to be effective 7/1/2016. Filed Date: 6/3/16. Accession Number: 20160603–5296. Comments Due: 5 p.m. ET 6/24/16. Docket Numbers: ER16–1940–000. Applicants: Idaho Power Company. Description: § 205(d) Rate Filing: SA 358—Construction Agreement with PAC for Siphon Tap-Pingree Tap Line Rebuild to be effective 6/1/2016. Filed Date: 6/16/16. Accession Number: 20160616–5000. Comments Due: 5 p.m. ET 7/7/16. Docket Numbers: ER16–1941–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: 2016 Revised Added Facilities Rate under WDAT—Filing No. 14 to be effective 1/1/2016. Filed Date: 6/16/16. Accession Number: 20160616–5003. Comments Due: 5 p.m. ET 7/7/16. Docket Numbers: ER16–1942–000. Applicants: WM North Broward, Inc. Description: Notice of Cancellation market-based rate tariff of WM North Broward, Inc. Filed Date: 6/16/16. Accession Number: 20160616–5042. Comments Due: 5 p.m. ET 7/7/16. Docket Numbers: ER16–1943–000. Applicants: Illinois Power Marketing Company. Description: Compliance filing: 2013 System Support Resource Agreement Compliance Filing to be effective 1/1/2013. Filed Date: 6/16/16. Accession Number: 20160616–5053. Comments Due: 5 p.m. ET 7/7/16. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR16–4–000. Applicants: North American Electric Reliability Corp. Description: North American Electric Reliability Corporation’s Revised Report of Comparisons of Budgeted to Actual E:\FR\FM\22JNN1.SGM 22JNN1

Agencies

[Federal Register Volume 81, Number 120 (Wednesday, June 22, 2016)]
[Notices]
[Pages 40693-40694]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-14762]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-13-000]


Three Sisters Irrigation District; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On June 2, 2016, as supplemented on June 13, 2016, Three Sisters 
Irrigation District filed a notice of intent to construct a qualifying 
conduit hydropower facility, pursuant to section 30 of the Federal 
Power Act (FPA), as amended by section 4 of the Hydropower Regulatory 
Efficiency Act of 2013 (HREA). The proposed Watson Net Meter/Micro 
Hydroelectric Demonstration Facility would have an installed capacity 
of 198.6 kilowatts (kW), and would be located along the outlet pipe for 
an existing irrigation pipeline, the Watson McKenzie Main Canal South 
Pipe. The project would be located in the town of Sisters, Deschutes 
County, Oregon.
    Applicant Contact: Marc Thalacker, P.O. Box 2230, Sisters, OR 
97759, Phone No. (541) 549-8815.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
Christopher.Chaney@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new powerhouse, approximately 20 feet 
by 40 feet, along the existing 24-inch-diameter outlet pipe of the 54-
inch-diameter Watson McKenzie Main Canal South Pipe; (2) four new 
turbine/generating units with a total installed capacity of 198.6 kW; 
(3) four new, short intake pipes of variable diameters; (4) four new, 
short discharge pipes of variable diameters; (5) a discharge pool 
structure, approximately 13.5 feet by 25 feet, with two 36-inch-
diameter outlet pipes to Watson Reservoir; and (6) appurtenant 
facilities.
    The proposed project would have a total installed capacity of 198.6 
kW.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit the                      Y
 HREA.                            facility uses is a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed addition of the 
hydroelectric project along the existing irrigation pipeline will not 
alter its primary purpose. Therefore, based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866)

[[Page 40694]]

208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. A 
copy of all other filings in reference to this application must be 
accompanied by proof of service on all persons listed in the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD16-13) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call 
(202) 502-8659.

    Dated: June 16, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-14762 Filed 6-21-16; 8:45 am]
 BILLING CODE 6717-01-P