Birch Power Company; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 40300-40301 [2016-14599]

Download as PDF asabaliauskas on DSK3SPTVN1PROD with NOTICES 40300 Federal Register / Vol. 81, No. 119 / Tuesday, June 21, 2016 / Notices Applicants: San Isabel Solar LLC. Description: Baseline eTariff Filing: San Isabel MBR to be effective 8/1/2016. Filed Date: 6/15/16. Accession Number: 20160615–5000. Comments Due: 5 p.m. ET 7/6/16. Docket Numbers: ER16–1927–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Service Agreement No. 890 to be effective 6/16/2016. Filed Date: 6/15/16. Accession Number: 20160615–5029. Comments Due: 5 p.m. ET 7/6/16. Docket Numbers: ER16–1928–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to WMPA SA No. 3250, Queue No. W2–091 to be effective 2/5/ 2015. Filed Date: 6/15/16. Accession Number: 20160615–5049. Comments Due: 5 p.m. ET 7/6/16. Docket Numbers: ER16–1929–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2016–06–15_SA 2923 ATC-Quilt Block Wind Farm E&P (J395) to be effective 6/ 16/2016. Filed Date: 6/15/16. Accession Number: 20160615–5050. Comments Due: 5 p.m. ET 7/6/16. Docket Numbers: ER16–1930–000. Applicants: Southern California Edison Company. Description: Tariff Cancellation: Notices of Cancellation DSA—Summer Solar E2, F2, G2, H2 to be effective 12/ 27/2015. Filed Date: 6/15/16. Accession Number: 20160615–5056. Comments Due: 5 p.m. ET 7/6/16. Docket Numbers: ER16–1931–000. Applicants: Pacific Gas and Electric Company. Description: Notice of Termination of Small Generator Interconnection Service Agreement No. 326 of Pacific Gas and Electric Company. Filed Date: 6/15/16. Accession Number: 20160615–5061. Comments Due: 5 p.m. ET 7/6/16. Docket Numbers: ER16–1932–000. Applicants: Tanner Street Generation, LLC. Description: § 205(d) Rate Filing: Category 2 Seller Request in NE to be effective 6/16/2016. Filed Date: 6/15/16. Accession Number: 20160615–5065. Comments Due: 5 p.m. ET 7/6/16. Docket Numbers: ER16–1933–000. Applicants: Public Service Electric and Gas Company. VerDate Sep<11>2014 18:37 Jun 20, 2016 Jkt 238001 Description: Baseline eTariff Filing: PECO PSE&G Amtrak to be effective 6/ 15/2016. Filed Date: 6/15/16. Accession Number: 20160615–5066. Comments Due: 5 p.m. ET 7/6/16. Docket Numbers: ER16–1934–000. Applicants: Drift Marketplace, Inc. Description: Baseline eTariff Filing: Drift Marketplace, Inc. Market Based Rate Tariff to be effective 6/15/2016. Filed Date: 6/15/16. Accession Number: 20160615–5068. Comments Due: 5 p.m. ET 7/6/16. Docket Numbers: ER16–1935–000. Applicants: Union Power Partners, L.P. Description: Tariff Cancellation: Complete Cancellation of FERC Electric Tariff to be effective 6/16/2016. Filed Date: 6/15/16. Accession Number: 20160615–5069. Comments Due: 5 p.m. ET 7/6/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 15, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–14600 Filed 6–20–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13102–003] Birch Power Company; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 a. Type of Application: Original License (Major Project). b. Project No.: 13102–003. c. Date filed: July 2, 2013. d. Applicant: Birch Power Company. e. Name of Project: Demopolis Lock and Dam Hydroelectric Project. f. Location: At the U.S. Army Corps of Engineers’ (Corps) Demopolis Lock and Dam, on the Tombigbee River, west of the city of Demopolis in Marengo and Sumter Counties, Alabama. The proposed project would occupy approximately 23 acres of federal land administered by the Corps. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Nicholas E. Josten, GeoSense, 2742 Saint Charles Ave, Idaho Falls, ID 83404, (208) 528– 6152. i. FERC Contact: Adam Peer (202) 502–8449, adam.peer@ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–13102–003. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is now ready for environmental analysis. l. The proposed project would utilize the existing Corps’ Demopolis Lock and Dam and Reservoir, and would consist E:\FR\FM\21JNN1.SGM 21JNN1 asabaliauskas on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 81, No. 119 / Tuesday, June 21, 2016 / Notices of the following new facilities: (1) A 900-foot-long excavated intake channel (headrace); (2) two 60-foot-long by 32foot-wide trash racks with 2.5-inch bar spacing; (3) a 201-foot-long by 80-footwide powerhouse containing two 24megawatt (MW) Kaplan turbines, having a total installed capacity of 48 MW; (4) a substation; (5) a forebay oxygen diffuser line system to enhance dissolved oxygen; (6) a 2,000-foot-long excavated tailrace channel; (7) a 1,700foot-long retaining wall along the north side of tailrace channel; (8) a 4.4-milelong, 115-kilovolt transmission line; and (9) appurtenant facilities. The average annual generation would be about 213,000 megawatt-hours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any VerDate Sep<11>2014 18:37 Jun 20, 2016 Jkt 238001 competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: June 15, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–14599 Filed 6–20–16; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9947–89–Region 10] Reissuance of NPDES General Permit for Discharges From Federal Aquaculture Facilities and Aquaculture Facilities Located in Indian Country Within the Boundaries of Washington State (Permit Number WAG130000) Environmental Protection Agency (EPA). ACTION: Notice of availability. AGENCY: The Director, Office of Water and Watersheds, EPA Region 10, is publishing notice of availability of the final National Pollutant Discharge Elimination System (NPDES) General Permit for Federal Aquaculture Facilities and Aquaculture Facilities Located in Indian Country within the Boundaries of Washington State (General Permit). The General Permit contains effluent limitations, along with administrative reporting and monitoring requirements, as well as standard conditions, prohibitions, and management practices. The Washington Department of Ecology and applicable tribes have provided Section 401 certification for this permit. DATES: The issuance date of this General Permit is the date of publication of this notice. The General Permit will become effective August 1, 2016. ADDRESSES: Copies of the General Permit and Response to Comments are available through written requests submitted to EPA, Region 10, 1200 Sixth Avenue, Suite 900, OWW–191, Seattle, WA 98101. Electronic requests may be sent to: washington.audrey@epa.gov. SUMMARY: PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 40301 For requests by phone, call Audrey Washington at (206) 553–0523. The General Permit, Fact Sheet, Biological Evaluation, and Response to Comments may be found on the Region 10 Web site at https://yosemite.epa.gov/r10/ water.nsf/npdes+permits/ general+npdes+permits/. FOR FURTHER INFORMATION CONTACT: Audrey Washington, (206) 553–0523. SUPPLEMENTARY INFORMATION: Other Legal Requirements Endangered Species Act [16 U.S.C. 1531 et al.]. Section 7 of the Endangered Species Act (ESA) requires Federal agencies to consult with NOAA Fisheries (NMFS) and the U.S. Fish and Wildlife Service (USFWS) if their actions have the potential to either beneficially or adversely affect any threatened or endangered species. EPA has analyzed the discharges authorized by the General Permit, and their potential to adversely affect any of the threatened or endangered species or their designated critical habitat areas in the vicinity of the discharges. Based on this analysis, EPA has determined that the issuance of this permit is not likely to adversely affect any threatened or endangered species in the vicinity of the discharge. NMFS and USFWS have concurred with this determination. National Environmental Policy Act (NEPA) [42 U.S.C. 4321 et seq.] and Other Federal Requirements. Regulations at 40 CFR 122.49 list the federal laws that may apply to the issuance of permits, i.e., ESA, National Historic Preservation Act, the Coastal Zone Act Reauthorization Amendments (CZARA), NEPA, and Executive Orders, among others. The NEPA compliance program requires analysis of information regarding potential impacts, development and analysis of options to avoid or minimize impacts, and development and analysis of measures to mitigate adverse impacts. EPA determined that no Environmental Assessments (EAs) or Environmental Impact Statements (EIS’s) are required under NEPA. EPA determined that continued coverage of the Chief Joseph Fish Hatchery under the reissued General Permit meets the criteria to be categorically excluded from further NEPA review. EPA also determined that CZARA does not apply. Essential Fish Habitat (EFH). The Magnuson-Stevens Fishery Management and Conservation Act requires EPA to consult with NOAA–NMFS when a proposed discharge has the potential to adversely affect a designated EFH. The EFH regulations define an adverse effect as ‘‘any impact which reduces quality E:\FR\FM\21JNN1.SGM 21JNN1

Agencies

[Federal Register Volume 81, Number 119 (Tuesday, June 21, 2016)]
[Notices]
[Pages 40300-40301]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-14599]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13102-003]


Birch Power Company; Notice of Application Ready for 
Environmental Analysis and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original License (Major Project).
    b. Project No.: 13102-003.
    c. Date filed: July 2, 2013.
    d. Applicant: Birch Power Company.
    e. Name of Project: Demopolis Lock and Dam Hydroelectric Project.
    f. Location: At the U.S. Army Corps of Engineers' (Corps) Demopolis 
Lock and Dam, on the Tombigbee River, west of the city of Demopolis in 
Marengo and Sumter Counties, Alabama. The proposed project would occupy 
approximately 23 acres of federal land administered by the Corps.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Nicholas E. Josten, GeoSense, 2742 Saint 
Charles Ave, Idaho Falls, ID 83404, (208) 528-6152.
    i. FERC Contact: Adam Peer (202) 502-8449, adam.peer@ferc.gov.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-13102-003.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is now ready for 
environmental analysis.
    l. The proposed project would utilize the existing Corps' Demopolis 
Lock and Dam and Reservoir, and would consist

[[Page 40301]]

of the following new facilities: (1) A 900-foot-long excavated intake 
channel (headrace); (2) two 60-foot-long by 32-foot-wide trash racks 
with 2.5-inch bar spacing; (3) a 201-foot-long by 80-foot-wide 
powerhouse containing two 24-megawatt (MW) Kaplan turbines, having a 
total installed capacity of 48 MW; (4) a substation; (5) a forebay 
oxygen diffuser line system to enhance dissolved oxygen; (6) a 2,000-
foot-long excavated tailrace channel; (7) a 1,700-foot-long retaining 
wall along the north side of tailrace channel; (8) a 4.4-mile-long, 
115-kilovolt transmission line; and (9) appurtenant facilities. The 
average annual generation would be about 213,000 megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Public notice of the filing of the initial development 
application, which has already been given, established the due date for 
filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

    Dated: June 15, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-14599 Filed 6-20-16; 8:45 am]