Fred N. Sutter, Jr.; Shamrock Utilities, LLC; Notice of Transfer of Exemption, 40297 [2016-14597]
Download as PDF
Federal Register / Vol. 81, No. 119 / Tuesday, June 21, 2016 / Notices
Filed Date: 6/15/16.
Accession Number: 20160615–5099.
Comments Due: 5 p.m. ET 7/6/16.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4283–005]
Fred N. Sutter, Jr.; Shamrock Utilities,
LLC; Notice of Transfer of Exemption
1. By letter filed May 16, 2016, Fred
N. Sutter, Jr. informed the Commission
that the exemption from licensing for
the Sutter’s Mill Project No. 4283,
originally issued March 1, 1982 1 has
been transferred to Shamrock Utilities,
LLC. The project is located on Millseat
Creek in Shasta County, California. The
transfer of an exemption does not
require Commission approval.
2. Shamrock Utilities, LLC is now the
exemptee of the Sutter’s Mill Project,
No. 4283. All correspondence should be
forwarded to: Mr. Rocky Ungaro,
Shamrock Utilities, LLC, P.O. Box 859,
Palo Cedro, CA 96073.
Dated: June 15, 2016.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER06–554–000.
Applicants: Virginia Electric and
Power Company.
Description: Informational Filing and
Motion for Extension of Time of Virginia
Electric and Power Company.
Filed Date: 8/12/15.
Accession Number: 20150812–5182
Comments Due: 5 p.m. ET 7/6/16.
Docket Numbers: ER15–767–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Report Filing: 2016–06–
15_White Pine 2 Refund Report
Supplement to be effective N/A.
Filed Date: 6/15/16.
Accession Number: 20160615–5026.
Comments Due: 5 p.m. ET 7/6/16.
Docket Numbers: ER16–1936–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: City
of Gridley Work Performance
Agreement to be effective 7/1/2016.
1 18 FERC ¶ 62,359 (1982), Order Granting
Exemption from Licensing of a Small Hydroelectric
Project of 5 Megawatts or Less.
18:37 Jun 20, 2016
Jkt 238001
Docket Numbers: ER16–1938–000.
Applicants: Wisconsin Power and
Light Company.
Description: § 205(d) Rate Filing:
Normal PSA filing to be effective 9/1/
2010.
Filed Date: 6/15/16.
Accession Number: 20160615–5104.
Comments Due: 5 p.m. ET 7/6/16.
Docket Numbers: ER16–1939–000.
Applicants: 4C Acquisition, LLC.
Description: Baseline eTariff Filing:
Baseline Master Tariff Filing—Rate
Schedules to be effective 8/15/2016.
Filed Date: 6/15/16.
Accession Number: 20160615–5106.
Comments Due: 5 p.m. ET 7/6/16.
[FR Doc. 2016–14597 Filed 6–20–16; 8:45 am]
VerDate Sep<11>2014
Docket Numbers: ER16–1937–000.
Applicants: Wisconsin Power and
Light Company.
Description: § 205(d) Rate Filing:
Normal CFA filing to be effective 9/1/
2010.
Filed Date: 6/15/16.
Accession Number: 20160615–5103.
Comments Due: 5 p.m. ET 7/6/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 15, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–14601 Filed 6–20–16; 8:45 am]
40297
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–520–000]
Tennessee Gas Pipeline Company,
LLC; Notice of Availability of the
Environmental Assessment for the
Proposed Triad Expansion Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Triad Expansion Project, proposed by
Tennessee Gas Pipeline Company, LLC
(Tennessee) in the above-referenced
docket. Tennessee requests
authorization to construct and operate
pipeline facilities, to modify existing
aboveground facilities, and add new tiein facilities in Susquehanna County,
Pennsylvania.
The EA assesses the potential
environmental effects of the
construction and operation of the Triad
Expansion Project in accordance with
the requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The proposed Triad Expansion Project
includes the following facilities:
• Approximately 7.0 miles of new 36inch-diameter looping 1 pipeline in
Susquehanna County, Pennsylvania;
• A new internal pipeline inspection
(‘‘pig’’) launcher, crossover, and
connecting facilities at the beginning of
the proposed pipeline loop in
Susquehanna County, Pennsylvania;
and
• A new ‘‘pig’’ receiver, a new
odorant facility, and ancillary piping at
the existing Compressor Station 321 in
Susquehanna County, Pennsylvania.
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding. In
addition, the EA is available for public
viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link.
A limited number of copies of the EA
are available for distribution and public
BILLING CODE 6717–01–P
PO 00000
1 A pipeline loop is a segment of pipe constructed
parallel to an existing pipeline to increase capacity.
Frm 00039
Fmt 4703
Sfmt 4703
E:\FR\FM\21JNN1.SGM
21JNN1
Agencies
[Federal Register Volume 81, Number 119 (Tuesday, June 21, 2016)]
[Notices]
[Page 40297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-14597]
[[Page 40297]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4283-005]
Fred N. Sutter, Jr.; Shamrock Utilities, LLC; Notice of Transfer
of Exemption
1. By letter filed May 16, 2016, Fred N. Sutter, Jr. informed the
Commission that the exemption from licensing for the Sutter's Mill
Project No. 4283, originally issued March 1, 1982 \1\ has been
transferred to Shamrock Utilities, LLC. The project is located on
Millseat Creek in Shasta County, California. The transfer of an
exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ 18 FERC ] 62,359 (1982), Order Granting Exemption from
Licensing of a Small Hydroelectric Project of 5 Megawatts or Less.
---------------------------------------------------------------------------
2. Shamrock Utilities, LLC is now the exemptee of the Sutter's Mill
Project, No. 4283. All correspondence should be forwarded to: Mr. Rocky
Ungaro, Shamrock Utilities, LLC, P.O. Box 859, Palo Cedro, CA 96073.
Dated: June 15, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-14597 Filed 6-20-16; 8:45 am]
BILLING CODE 6717-01-P