Benton Falls Associates, New York LP; Benton Falls Associates, Maine LP; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests, 38700 [2016-13973]
Download as PDF
srobinson on DSK5SPTVN1PROD with NOTICES
38700
Federal Register / Vol. 81, No. 114 / Tuesday, June 14, 2016 / Notices
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2576–168.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: FirstLight
Hydro Generating Company proposes to
permit the expansion of West Cove
Marina from the existing 25 boat slips
to a total of 136 boat slips distributed
across 8 docks, as well as construction
of a new gasoline dock to replace the
existing gasoline dock. Although the
majority of the site has been previously
developed, minor earthwork would be
performed to install the 8 concrete pads
for connecting the docks to shore.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
http://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at http://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
VerDate Sep<11>2014
19:36 Jun 13, 2016
Jkt 238001
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: June 8, 2016.
Kimberly D. Bose,
Secretary.
reorganization. The transferor will be
merged into newly created transferee.
Applicants Contact: Mr. Andrew
Locke, Messalonskee Stream Hydro,
LLC, c/o Essex Hydro Assets, 55 Union
Street, 4th Floor, Boston, MA 02108,
Phone: 617–367–0032, Email:
alocke@essexhydro.com.
FERC Contact: Patricia W. Gillis, (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments, motions
to intervene, and protests: 30 days from
the date that the Commission issues this
notice. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, and
protests using the Commission’s eFiling
system at http://www.ferc.gov/docsfiling/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at http://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–5073–095.
Dated: June 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–13973 Filed 6–13–16; 8:45 am]
[FR Doc. 2016–13977 Filed 6–13–16; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 2474–051]
[Project No. 5073–095]
Benton Falls Associates, New York LP;
Benton Falls Associates, Maine LP;
Notice of Application for Transfer of
License and Soliciting Comments,
Motions To Intervene, and Protests
On May 25, 2016, Benton Falls
Associates, New York LP (transferor)
and Benton Falls Associates, Maine LP
(transferee) filed an application for the
transfer of license of the Benton Falls
Project No. 5073. The project is located
on the Sebasticook River in Kennebec
County, Maine.
The applicants seek Commission
approval to transfer the license for the
Benton Falls Project from the transferor
to the transferee. This transfer of license
reflects an internal corporate
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Erie Boulevard Hydropower, L.P.;
Notice of Application for Amendment
of License Modifying Flashboard
System and Flow Discharge Location
under Article 405, and Soliciting
Comments, Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
License.
b. Project No: 2474–051.
c. Date Filed: May 18, 2016.
d. Applicant: Erie Boulevard
Hydropower, L.P. (licensee).
e. Name of Project: Oswego River
Project.
E:\FR\FM\14JNN1.SGM
14JNN1
Agencies
[Federal Register Volume 81, Number 114 (Tuesday, June 14, 2016)]
[Notices]
[Page 38700]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13973]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5073-095]
Benton Falls Associates, New York LP; Benton Falls Associates,
Maine LP; Notice of Application for Transfer of License and Soliciting
Comments, Motions To Intervene, and Protests
On May 25, 2016, Benton Falls Associates, New York LP (transferor)
and Benton Falls Associates, Maine LP (transferee) filed an application
for the transfer of license of the Benton Falls Project No. 5073. The
project is located on the Sebasticook River in Kennebec County, Maine.
The applicants seek Commission approval to transfer the license for
the Benton Falls Project from the transferor to the transferee. This
transfer of license reflects an internal corporate reorganization. The
transferor will be merged into newly created transferee.
Applicants Contact: Mr. Andrew Locke, Messalonskee Stream Hydro,
LLC, c/o Essex Hydro Assets, 55 Union Street, 4th Floor, Boston, MA
02108, Phone: 617-367-0032, Email: alocke@essexhydro.com.
FERC Contact: Patricia W. Gillis, (202) 502-8735,
patricia.gillis@ferc.gov.
Deadline for filing comments, motions to intervene, and protests:
30 days from the date that the Commission issues this notice. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-5073-095.
Dated: June 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-13973 Filed 6-13-16; 8:45 am]
BILLING CODE 6717-01-P