Drawbridge Operation Regulation; Reynolds Channel, Nassau, NY, 37157 [2016-13654]
Download as PDF
Federal Register / Vol. 81, No. 111 / Thursday, June 9, 2016 / Rules and Regulations
rmajette on DSK2TPTVN1PROD with RULES
Connecticut. This deviation is necessary
to allow the bridge owner to perform
timber tie and headblock replacements
at the bridge.
DATES: This deviation is effective from
8 a.m. on July 18, 2016 to 8 a.m. on
August 29, 2016.
ADDRESSES: The docket for this
deviation, [USCG–2016–0402] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Judy Leung-Yee,
Project Officer, First Coast Guard
District, telephone (212) 514–4330,
email judy.k.leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: The bridge
owner, Connecticut Department of
Transportation, requested a temporary
deviation from the normal operating
schedule to perform timber ties and
headblocks replacement at the bridge.
The Metro-North Saga Bridge, mile
1.1, across the Saugatuck River, has a
vertical clearance in the closed position
of 13 feet at mean high water and 20 feet
at mean low water.
The existing bridge operating
regulations are found at 33 CFR
117.221(b).
The waterway is transited by seasonal
recreational vessels.
Under this temporary deviation, the
Metro-North Saga Bridge will operate
according to the schedule below:
open fully on signal upon 24 hr advance
notice.
k. From 8 a.m. on August 22, 2016 through
4 a.m. on August 26, 2016, the bridge will not
open to marine traffic.
l. From 4 a.m. on August 26, 2016 through
8 a.m. on August 29, 2016, the bridge will
open fully on signal upon 24 hr advance
notice.
a. From 8 a.m. on July 18, 2016 through 4
a.m. on July 22, 2016, the bridge will not
open to marine traffic.
b. From 4 a.m. on July 22, 2016 through 8
a.m. on July 25, 2016, the bridge will open
fully on signal upon 24 hr advance notice.
c. From 8 a.m. on July 25, 2016 through 4
a.m. on July 29, 2016, the bridge will not
open to marine traffic.
d. From 4 a.m. on July 29, 2016 through
8 a.m. on August 1, 2016, the bridge will
open fully on signal upon 24 hr advance
notice.
e. From 8 a.m. on August 1, 2016 through
4 a.m. on August 5, 2016, the bridge will not
open to marine traffic.
f. From 4 a.m. on August 5, 2016 through
8 a.m. on August 8, 2016, the bridge will
open fully on signal upon 24 hr advance
notice.
g. From 8 a.m. on August 8, 2016 through
4 a.m. on August 12, 2016, the bridge will not
open to marine traffic.
h. From 4 a.m. on August 12, 2016 through
8 a.m. on August 15, 2016, the bridge will
open fully on signal upon 24 hr advance
notice.
i. From 8 a.m. on August 15, 2016 through
4 a.m. on August 19, 2016, the bridge will not
open to marine traffic.
j. From 4 a.m. on August 19, 2016 through
8 a.m. on August 22, 2016, the bridge will
Coast Guard
VerDate Sep<11>2014
14:17 Jun 08, 2016
Jkt 238001
Vessels able to pass under the bridge
in the closed position may do so at
anytime. The bridge will not be able to
open for emergencies and there is no
immediate alternate route for vessels to
pass. The Coast Guard will inform the
users of the waterways through our
Local Notice and Broadcast to Mariners
of the change in operating schedule for
the bridge so that vessel operations can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 3, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2016–13653 Filed 6–8–16; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
33 CFR Part 117
[Docket No. USCG–2016–0404]
Drawbridge Operation Regulation;
Reynolds Channel, Nassau, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Long Beach
Bridge, mile 4.7, across Reynolds
Channel, at Nassau, New York. This
temporary deviation is necessary to
facility public safety during a public
event, the Annual Salute to Veterans
and Fireworks Display.
DATES: This deviation is effective from
9:30 p.m. on June 25, 2016 to 11:59 p.m.
on June 26, 2016.
ADDRESSES: The docket for this
deviation, [USCG–2016–0404] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
SUMMARY:
PO 00000
Frm 00037
Fmt 4700
Sfmt 9990
37157
Click on Open Docket Folder on the line
associated with this deviation.
If
you have questions on this temporary
deviation, call or email Ms. Judy K.
Leung-Yee, Project Officer, First Coast
Guard District, telephone (212) 514–
4330, email judy.k.leung-yee@uscg.mil.
FOR FURTHER INFORMATION CONTACT:
Town of
Hempstead Department of Public Safety
requested and the bridge owner, Nassau
County Department of Public Works,
concurred with this temporary deviation
from the normal operating schedule to
facilitate a public event, the Annual
Salute to Veterans and Fireworks
Display.
The Long Beach Bridge, mile 4.7,
across Reynolds Channel has a vertical
clearance in the closed position of 22
feet at mean high water and 24 feet at
mean low water. The existing bridge
operating regulations are found at 33
CFR 117.799(g).
Reynolds Channel is transited by
commercial and recreational traffic.
Under this temporary deviation, the
Long Beach Bridges may remain in the
closed position between 9:30 p.m. and
11:59 p.m. on June 25, 2016 (rain date:
June 26, 2016 between 9:30 p.m. and
11:59 p.m.).
Vessels able to pass under the bridge
in the closed position may do so at
anytime. The bridges will not be able to
open for emergencies and there are no
immediate alternate routes for vessels to
pass.
The Coast Guard will also inform the
users of the waterways through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessels can arrange
their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
Dated: June 3, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2016–13654 Filed 6–8–16; 8:45 am]
BILLING CODE 9110–04–P
E:\FR\FM\09JNR1.SGM
09JNR1
Agencies
[Federal Register Volume 81, Number 111 (Thursday, June 9, 2016)]
[Rules and Regulations]
[Page 37157]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13654]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2016-0404]
Drawbridge Operation Regulation; Reynolds Channel, Nassau, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Long Beach Bridge, mile 4.7, across
Reynolds Channel, at Nassau, New York. This temporary deviation is
necessary to facility public safety during a public event, the Annual
Salute to Veterans and Fireworks Display.
DATES: This deviation is effective from 9:30 p.m. on June 25, 2016 to
11:59 p.m. on June 26, 2016.
ADDRESSES: The docket for this deviation, [USCG-2016-0404] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy K. Leung-Yee, Project
Officer, First Coast Guard District, telephone (212) 514-4330, email
judy.k.leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: Town of Hempstead Department of Public
Safety requested and the bridge owner, Nassau County Department of
Public Works, concurred with this temporary deviation from the normal
operating schedule to facilitate a public event, the Annual Salute to
Veterans and Fireworks Display.
The Long Beach Bridge, mile 4.7, across Reynolds Channel has a
vertical clearance in the closed position of 22 feet at mean high water
and 24 feet at mean low water. The existing bridge operating
regulations are found at 33 CFR 117.799(g).
Reynolds Channel is transited by commercial and recreational
traffic.
Under this temporary deviation, the Long Beach Bridges may remain
in the closed position between 9:30 p.m. and 11:59 p.m. on June 25,
2016 (rain date: June 26, 2016 between 9:30 p.m. and 11:59 p.m.).
Vessels able to pass under the bridge in the closed position may do
so at anytime. The bridges will not be able to open for emergencies and
there are no immediate alternate routes for vessels to pass.
The Coast Guard will also inform the users of the waterways through
our Local and Broadcast Notices to Mariners of the change in operating
schedule for the bridge so that vessels can arrange their transits to
minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: June 3, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2016-13654 Filed 6-8-16; 8:45 am]