Download as PDF Federal Register / Vol. 81, No. 111 / Thursday, June 9, 2016 / Rules and Regulations rmajette on DSK2TPTVN1PROD with RULES Connecticut. This deviation is necessary to allow the bridge owner to perform timber tie and headblock replacements at the bridge. DATES: This deviation is effective from 8 a.m. on July 18, 2016 to 8 a.m. on August 29, 2016. ADDRESSES: The docket for this deviation, [USCG–2016–0402] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Judy Leung-Yee, Project Officer, First Coast Guard District, telephone (212) 514–4330, email judy.k.leung-yee@uscg.mil. SUPPLEMENTARY INFORMATION: The bridge owner, Connecticut Department of Transportation, requested a temporary deviation from the normal operating schedule to perform timber ties and headblocks replacement at the bridge. The Metro-North Saga Bridge, mile 1.1, across the Saugatuck River, has a vertical clearance in the closed position of 13 feet at mean high water and 20 feet at mean low water. The existing bridge operating regulations are found at 33 CFR 117.221(b). The waterway is transited by seasonal recreational vessels. Under this temporary deviation, the Metro-North Saga Bridge will operate according to the schedule below: open fully on signal upon 24 hr advance notice. k. From 8 a.m. on August 22, 2016 through 4 a.m. on August 26, 2016, the bridge will not open to marine traffic. l. From 4 a.m. on August 26, 2016 through 8 a.m. on August 29, 2016, the bridge will open fully on signal upon 24 hr advance notice. a. From 8 a.m. on July 18, 2016 through 4 a.m. on July 22, 2016, the bridge will not open to marine traffic. b. From 4 a.m. on July 22, 2016 through 8 a.m. on July 25, 2016, the bridge will open fully on signal upon 24 hr advance notice. c. From 8 a.m. on July 25, 2016 through 4 a.m. on July 29, 2016, the bridge will not open to marine traffic. d. From 4 a.m. on July 29, 2016 through 8 a.m. on August 1, 2016, the bridge will open fully on signal upon 24 hr advance notice. e. From 8 a.m. on August 1, 2016 through 4 a.m. on August 5, 2016, the bridge will not open to marine traffic. f. From 4 a.m. on August 5, 2016 through 8 a.m. on August 8, 2016, the bridge will open fully on signal upon 24 hr advance notice. g. From 8 a.m. on August 8, 2016 through 4 a.m. on August 12, 2016, the bridge will not open to marine traffic. h. From 4 a.m. on August 12, 2016 through 8 a.m. on August 15, 2016, the bridge will open fully on signal upon 24 hr advance notice. i. From 8 a.m. on August 15, 2016 through 4 a.m. on August 19, 2016, the bridge will not open to marine traffic. j. From 4 a.m. on August 19, 2016 through 8 a.m. on August 22, 2016, the bridge will Coast Guard VerDate Sep<11>2014 14:17 Jun 08, 2016 Jkt 238001 Vessels able to pass under the bridge in the closed position may do so at anytime. The bridge will not be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will inform the users of the waterways through our Local Notice and Broadcast to Mariners of the change in operating schedule for the bridge so that vessel operations can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 3, 2016. C.J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2016–13653 Filed 6–8–16; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY 33 CFR Part 117 [Docket No. USCG–2016–0404] Drawbridge Operation Regulation; Reynolds Channel, Nassau, NY Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Long Beach Bridge, mile 4.7, across Reynolds Channel, at Nassau, New York. This temporary deviation is necessary to facility public safety during a public event, the Annual Salute to Veterans and Fireworks Display. DATES: This deviation is effective from 9:30 p.m. on June 25, 2016 to 11:59 p.m. on June 26, 2016. ADDRESSES: The docket for this deviation, [USCG–2016–0404] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. SUMMARY: PO 00000 Frm 00037 Fmt 4700 Sfmt 9990 37157 Click on Open Docket Folder on the line associated with this deviation. If you have questions on this temporary deviation, call or email Ms. Judy K. Leung-Yee, Project Officer, First Coast Guard District, telephone (212) 514– 4330, email judy.k.leung-yee@uscg.mil. FOR FURTHER INFORMATION CONTACT: Town of Hempstead Department of Public Safety requested and the bridge owner, Nassau County Department of Public Works, concurred with this temporary deviation from the normal operating schedule to facilitate a public event, the Annual Salute to Veterans and Fireworks Display. The Long Beach Bridge, mile 4.7, across Reynolds Channel has a vertical clearance in the closed position of 22 feet at mean high water and 24 feet at mean low water. The existing bridge operating regulations are found at 33 CFR 117.799(g). Reynolds Channel is transited by commercial and recreational traffic. Under this temporary deviation, the Long Beach Bridges may remain in the closed position between 9:30 p.m. and 11:59 p.m. on June 25, 2016 (rain date: June 26, 2016 between 9:30 p.m. and 11:59 p.m.). Vessels able to pass under the bridge in the closed position may do so at anytime. The bridges will not be able to open for emergencies and there are no immediate alternate routes for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. SUPPLEMENTARY INFORMATION: Dated: June 3, 2016. C.J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2016–13654 Filed 6–8–16; 8:45 am] BILLING CODE 9110–04–P E:\FR\FM\09JNR1.SGM 09JNR1

Agencies

[Federal Register Volume 81, Number 111 (Thursday, June 9, 2016)]
[Rules and Regulations]
[Page 37157]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13654]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-0404]


Drawbridge Operation Regulation; Reynolds Channel, Nassau, NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Long Beach Bridge, mile 4.7, across 
Reynolds Channel, at Nassau, New York. This temporary deviation is 
necessary to facility public safety during a public event, the Annual 
Salute to Veterans and Fireworks Display.

DATES: This deviation is effective from 9:30 p.m. on June 25, 2016 to 
11:59 p.m. on June 26, 2016.

ADDRESSES: The docket for this deviation, [USCG-2016-0404] is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Ms. Judy K. Leung-Yee, Project 
Officer, First Coast Guard District, telephone (212) 514-4330, email 
judy.k.leung-yee@uscg.mil.

SUPPLEMENTARY INFORMATION: Town of Hempstead Department of Public 
Safety requested and the bridge owner, Nassau County Department of 
Public Works, concurred with this temporary deviation from the normal 
operating schedule to facilitate a public event, the Annual Salute to 
Veterans and Fireworks Display.
    The Long Beach Bridge, mile 4.7, across Reynolds Channel has a 
vertical clearance in the closed position of 22 feet at mean high water 
and 24 feet at mean low water. The existing bridge operating 
regulations are found at 33 CFR 117.799(g).
    Reynolds Channel is transited by commercial and recreational 
traffic.
    Under this temporary deviation, the Long Beach Bridges may remain 
in the closed position between 9:30 p.m. and 11:59 p.m. on June 25, 
2016 (rain date: June 26, 2016 between 9:30 p.m. and 11:59 p.m.).
    Vessels able to pass under the bridge in the closed position may do 
so at anytime. The bridges will not be able to open for emergencies and 
there are no immediate alternate routes for vessels to pass.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessels can arrange their transits to 
minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: June 3, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2016-13654 Filed 6-8-16; 8:45 am]
 BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.