Energy Resources USA Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 37191 [2016-13648]
Download as PDF
Federal Register / Vol. 81, No. 111 / Thursday, June 9, 2016 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14782–000]
sradovich on DSK3TPTVN1PROD with NOTICES
Energy Resources USA Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 4, 2016, Energy Resources
USA Inc. filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
R.D. Bailey Dam Hydroelectric Project
(R.D. Bailey Project or project) to be
located at the existing U.S. Army Corps
of Engineers’ R.D. Bailey Dam on the
Guyandotte River in Mingo and
Wyoming Counties, West Virginia. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new 90-foot-long by
45-foot-wide reinforced concrete
powerhouse to be located downstream
on the tailrace side of R.D. Bailey Dam;
(2) a new 12-foot by 9-foot by 250-footlong concrete conduit connecting the
existing outlet tunnel with the
powerhouse; (3) two 5-megawatt (MW)
vertical Kaplan turbine-generator units
with a total generating capacity of 10
MW; (4) a new 120-foot-long by 80-footwide tailrace; (5) a new 60-foot-long by
50-foot-wide substation with a 10-megavolt-ampere 4.16/69-kilovolt (kV) threephase step-up transformer; (6) a new
0.6-mile-long, 69-kV transmission line;
and (7) appurtenant facilities. The R.D.
Bailey Project would have an estimated
annual generation of 38.5 gigawatthours.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA Inc.,
350 Lincoln Road, 2nd Floor, Miami, FL
33139; telephone (954) 248–8425.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
VerDate Sep<11>2014
19:46 Jun 08, 2016
Jkt 238001
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14782–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14782) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: June 2, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–13648 Filed 6–8–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13757–002; Project No. 13761–
002; Project No. 13768–002]
FFP Missouri 5, LLC; FFP Missouri 6,
LLC; Solia 6 Hydroelectric, LLC; Notice
of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC)
regulations, 18 Code of Federal
Regulations Part 380, Office of Energy
Projects staff has reviewed applications
for original licenses for the Emsworth
Locks and Dam Hydroelectric Project
(FERC No. 13757–002), Emsworth Back
Channel Hydroelectric Project (FERC
No. 13761–002), and Montgomery Locks
and Dam Hydroelectric Project (FERC
No. 13768–002) on the Ohio River.
These projects are referred to
collectively as the Ohio River Projects.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
37191
The projects would all be located at
existing locks and dams owned by the
U.S. Army Corps of Engineers. The
Emsworth Locks and Dam Hydroelectric
Project would be located on the Ohio
River near Emsworth, Pennsylvania, in
Allegheny County at river mile (RM)
6.2. The Emsworth Back Channel
Hydroelectric Project would be located
on the Ohio River near Coraopolis,
Pennsylvania, in Allegheny County at
RM 6.8. The Montgomery Locks and
Dam Hydroelectric Project would be
located on the Ohio River downstream
of Monaca, Pennsylvania, in Beaver
County at RM 31.7. The projects would
collectively occupy 17.1 acres of federal
land.
Staff has prepared a multi-project
environmental assessment (EA) that
analyzes the potential environmental
effects of the three projects and
concludes that constructing and
operating the projects, with appropriate
environmental protection measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/esubscription.
asp to be notified via email of new
filings and issuances related to these or
other pending projects. For assistance,
contact FERC Online Support.
Any comments should be filed within
30 days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at FERC
OnlineSupport@ferc.gov or toll-free at
1–866–208–3676, or for TTY, 202–502–
8659. In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include: ‘‘Emsworth Locks and Dam
Hydroelectric Project No. 13757–002,
E:\FR\FM\09JNN1.SGM
09JNN1
Agencies
[Federal Register Volume 81, Number 111 (Thursday, June 9, 2016)]
[Notices]
[Page 37191]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13648]
[[Page 37191]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14782-000]
Energy Resources USA Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On May 4, 2016, Energy Resources USA Inc. filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the R.D. Bailey Dam
Hydroelectric Project (R.D. Bailey Project or project) to be located at
the existing U.S. Army Corps of Engineers' R.D. Bailey Dam on the
Guyandotte River in Mingo and Wyoming Counties, West Virginia. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A new 90-
foot-long by 45-foot-wide reinforced concrete powerhouse to be located
downstream on the tailrace side of R.D. Bailey Dam; (2) a new 12-foot
by 9-foot by 250-foot-long concrete conduit connecting the existing
outlet tunnel with the powerhouse; (3) two 5-megawatt (MW) vertical
Kaplan turbine-generator units with a total generating capacity of 10
MW; (4) a new 120-foot-long by 80-foot-wide tailrace; (5) a new 60-
foot-long by 50-foot-wide substation with a 10-mega-volt-ampere 4.16/
69-kilovolt (kV) three-phase step-up transformer; (6) a new 0.6-mile-
long, 69-kV transmission line; and (7) appurtenant facilities. The R.D.
Bailey Project would have an estimated annual generation of 38.5
gigawatt-hours.
Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc.,
350 Lincoln Road, 2nd Floor, Miami, FL 33139; telephone (954) 248-8425.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14782-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14782) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: June 2, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-13648 Filed 6-8-16; 8:45 am]
BILLING CODE 6717-01-P