FFP Missouri 5, LLC; FFP Missouri 6, LLC; Solia 6 Hydroelectric, LLC; Notice of Availability of Environmental Assessment, 37191-37192 [2016-13647]
Download as PDF
Federal Register / Vol. 81, No. 111 / Thursday, June 9, 2016 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14782–000]
sradovich on DSK3TPTVN1PROD with NOTICES
Energy Resources USA Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 4, 2016, Energy Resources
USA Inc. filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
R.D. Bailey Dam Hydroelectric Project
(R.D. Bailey Project or project) to be
located at the existing U.S. Army Corps
of Engineers’ R.D. Bailey Dam on the
Guyandotte River in Mingo and
Wyoming Counties, West Virginia. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new 90-foot-long by
45-foot-wide reinforced concrete
powerhouse to be located downstream
on the tailrace side of R.D. Bailey Dam;
(2) a new 12-foot by 9-foot by 250-footlong concrete conduit connecting the
existing outlet tunnel with the
powerhouse; (3) two 5-megawatt (MW)
vertical Kaplan turbine-generator units
with a total generating capacity of 10
MW; (4) a new 120-foot-long by 80-footwide tailrace; (5) a new 60-foot-long by
50-foot-wide substation with a 10-megavolt-ampere 4.16/69-kilovolt (kV) threephase step-up transformer; (6) a new
0.6-mile-long, 69-kV transmission line;
and (7) appurtenant facilities. The R.D.
Bailey Project would have an estimated
annual generation of 38.5 gigawatthours.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA Inc.,
350 Lincoln Road, 2nd Floor, Miami, FL
33139; telephone (954) 248–8425.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
VerDate Sep<11>2014
19:46 Jun 08, 2016
Jkt 238001
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14782–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14782) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: June 2, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–13648 Filed 6–8–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13757–002; Project No. 13761–
002; Project No. 13768–002]
FFP Missouri 5, LLC; FFP Missouri 6,
LLC; Solia 6 Hydroelectric, LLC; Notice
of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC)
regulations, 18 Code of Federal
Regulations Part 380, Office of Energy
Projects staff has reviewed applications
for original licenses for the Emsworth
Locks and Dam Hydroelectric Project
(FERC No. 13757–002), Emsworth Back
Channel Hydroelectric Project (FERC
No. 13761–002), and Montgomery Locks
and Dam Hydroelectric Project (FERC
No. 13768–002) on the Ohio River.
These projects are referred to
collectively as the Ohio River Projects.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
37191
The projects would all be located at
existing locks and dams owned by the
U.S. Army Corps of Engineers. The
Emsworth Locks and Dam Hydroelectric
Project would be located on the Ohio
River near Emsworth, Pennsylvania, in
Allegheny County at river mile (RM)
6.2. The Emsworth Back Channel
Hydroelectric Project would be located
on the Ohio River near Coraopolis,
Pennsylvania, in Allegheny County at
RM 6.8. The Montgomery Locks and
Dam Hydroelectric Project would be
located on the Ohio River downstream
of Monaca, Pennsylvania, in Beaver
County at RM 31.7. The projects would
collectively occupy 17.1 acres of federal
land.
Staff has prepared a multi-project
environmental assessment (EA) that
analyzes the potential environmental
effects of the three projects and
concludes that constructing and
operating the projects, with appropriate
environmental protection measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/esubscription.
asp to be notified via email of new
filings and issuances related to these or
other pending projects. For assistance,
contact FERC Online Support.
Any comments should be filed within
30 days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at FERC
OnlineSupport@ferc.gov or toll-free at
1–866–208–3676, or for TTY, 202–502–
8659. In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include: ‘‘Emsworth Locks and Dam
Hydroelectric Project No. 13757–002,
E:\FR\FM\09JNN1.SGM
09JNN1
37192
Federal Register / Vol. 81, No. 111 / Thursday, June 9, 2016 / Notices
Emsworth Back Channel Hydroelectric
Project No. 13761–002, and/or
Montgomery Locks and Dam
Hydroelectric Project No. 13768–002,’’
as appropriate.
For further information, contact
Nicholas Ettema at (202) 502–6565 or by
email at nicholas.ettema@ferc.gov.
Street NE., Washington, DC 20426,
(202) 502–6630, tony.dobbins@
ferc.gov.
Adam Pan (Legal Information), Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC
20426, (202) 502–6023, adam.pan@
ferc.gov.
Dated: June 3, 2016.
Kimberly D. Bose,
Secretary.
Dated: June 3, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–13647 Filed 6–8–16; 8:45 am]
[FR Doc. 2016–13650 Filed 6–8–16; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RM16–12–000; Docket No.
RM15–21–000]
[Docket No. EL16–77–000]
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email FERC
OnlineSupport@ferc.gov, or call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 21, 2016.
Michigan South Central Power Agency
v. Michigan Electric Transmission
Company, LLC; Notice of Complaint
Dated: June 2, 2016.
Kimberly D. Bose,
Secretary.
sradovich on DSK3TPTVN1PROD with NOTICES
Review of Generator Interconnection
Agreements and Procedures;
American Wind Energy Association;
Notice Inviting Post-Technical
Conference Comments
On May 13, 2016, Federal Energy
Regulatory Commission (Commission)
staff conducted a technical conference
to discuss select issues related to the
petition for rulemaking submitted by the
American Wind Energy Association in
Docket No. RM15–21–000 and other
interconnection-related issues,
including the interconnection of electric
storage.
All interested persons are invited to
file post-technical conference comments
on any or all of the questions listed in
the attachment to this Notice. We
emphasize that commenters need not
answer all of the questions. We
encourage commenters to submit new or
additional information in response to
these questions rather than information
that was previously submitted in Docket
Nos. RM16–12–000 and/or RM15–21–
000. Commenters should organize
responses consistent with the
numbering of the attached questions
and identify to what extent their
responses are generally applicable or
pertain to a particular RTO/ISO.
Commenters are also invited to
reference material previously filed in
this docket, including technical
conference transcripts. These comments
must be filed with the Commission no
later than 5:00 p.m. Eastern Standard
Time on June 20, 2016.
For more information about this
Notice, please contact:
Tony Dobbins (Technical Information),
Office of Energy Policy and
Information, Federal Energy
Regulatory Commission, 888 First
VerDate Sep<11>2014
15:50 Jun 08, 2016
Jkt 238001
Take notice that on June 1, 2016,
pursuant to sections 206 and 306 of the
Federal Power Act, 16 U.S.C. 824e and
825e and Rule 206 of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
385.206, Michigan South Central Power
Agency (Complainant) filed a formal
complaint against Michigan Electric
Transmission Company (Respondent)
alleging that Respondent has failed to
comply with Section19.1(i) of the
Project I Transmission Ownership and
Operating Agreement between
Complainant and Respondent, as more
fully explained in the complaint.
Complainant certifies that copies of
the complaint were served on the
contacts for Respondent as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
[FR Doc. 2016–13645 Filed 6–8–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–361–000]
Columbia Gulf Transmission, LLC;
Notice of Intent To Prepare an
Environmental Impact Statement for
the Proposed Gulf Xpress Project,
Request for Comments on
Environmental Issues, and Notice of
Public Scoping Meeting
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
that will discuss the environmental
impacts of the Gulf XPress Project (GXP)
involving construction and operation of
facilities by Columbia Gulf
Transmission, LLC (Columbia Gulf) in
Kentucky, Tennessee, and Mississippi.
The Commission will use this EIS in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
E:\FR\FM\09JNN1.SGM
09JNN1
Agencies
[Federal Register Volume 81, Number 111 (Thursday, June 9, 2016)]
[Notices]
[Pages 37191-37192]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13647]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13757-002; Project No. 13761-002; Project No. 13768-002]
FFP Missouri 5, LLC; FFP Missouri 6, LLC; Solia 6 Hydroelectric,
LLC; Notice of Availability of Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission or FERC)
regulations, 18 Code of Federal Regulations Part 380, Office of Energy
Projects staff has reviewed applications for original licenses for the
Emsworth Locks and Dam Hydroelectric Project (FERC No. 13757-002),
Emsworth Back Channel Hydroelectric Project (FERC No. 13761-002), and
Montgomery Locks and Dam Hydroelectric Project (FERC No. 13768-002) on
the Ohio River. These projects are referred to collectively as the Ohio
River Projects.
The projects would all be located at existing locks and dams owned
by the U.S. Army Corps of Engineers. The Emsworth Locks and Dam
Hydroelectric Project would be located on the Ohio River near Emsworth,
Pennsylvania, in Allegheny County at river mile (RM) 6.2. The Emsworth
Back Channel Hydroelectric Project would be located on the Ohio River
near Coraopolis, Pennsylvania, in Allegheny County at RM 6.8. The
Montgomery Locks and Dam Hydroelectric Project would be located on the
Ohio River downstream of Monaca, Pennsylvania, in Beaver County at RM
31.7. The projects would collectively occupy 17.1 acres of federal
land.
Staff has prepared a multi-project environmental assessment (EA)
that analyzes the potential environmental effects of the three projects
and concludes that constructing and operating the projects, with
appropriate environmental protection measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
www.ferc.gov using the ``eLibrary'' link. Enter the docket number,
excluding the last three digits, in the docket number field to access
the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to these or other pending projects. For assistance, contact
FERC Online Support.
Any comments should be filed within 30 days from the date of this
notice. The Commission strongly encourages electronic filing. Please
file comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, 202-502-8659. In lieu of electronic filing,
please send a paper copy to: Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. The first page
of any filing should include: ``Emsworth Locks and Dam Hydroelectric
Project No. 13757-002,
[[Page 37192]]
Emsworth Back Channel Hydroelectric Project No. 13761-002, and/or
Montgomery Locks and Dam Hydroelectric Project No. 13768-002,'' as
appropriate.
For further information, contact Nicholas Ettema at (202) 502-6565
or by email at nicholas.ettema@ferc.gov.
Dated: June 3, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-13647 Filed 6-8-16; 8:45 am]
BILLING CODE 6717-01-P