Combined Notice of Filings #1, 36910-36911 [2016-13444]

Download as PDF 36910 Federal Register / Vol. 81, No. 110 / Wednesday, June 8, 2016 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK3G9T082PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–1150–001. Applicants: Duke Energy Ohio, Inc., PJM Interconnection, L.L.C. Description: Compliance filing: Duke Energy submits compliance filing per 5/ 13/16 order in Docket No. ER16–1150 to be effective 5/13/2016. Filed Date: 6/1/16. Accession Number: 20160601–5303. Comments Due: 5 p.m. ET 6/22/16. Docket Numbers: ER16–1832–000. Applicants: Entergy Louisiana, LLC. Description: Section 205(d) Rate Filing: ELL Nine Mile 6 Reactive to be effective 8/1/2016. Filed Date: 6/1/16. Accession Number: 20160601–5175. Comments Due: 5 p.m. ET 6/22/16. Docket Numbers: ER16–1833–000. Applicants: Sempra Gas & Power Marketing, LLC. Description: Baseline eTariff Filing: Sempra Gas & Power Marketing, LLC Petition for Market-Based Rates to be effective 8/1/2016. Filed Date: 6/1/16. Accession Number: 20160601–5189. Comments Due: 5 p.m. ET 6/22/16. Docket Numbers: ER16–1834–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) Rate Filing: Original WMPA SA No. 4474, Queue No. Z2–113 to be effective 5/23/ 2016. Filed Date: 6/1/16. Accession Number: 20160601–5268. Comments Due: 5 p.m. ET 6/22/16. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RD16–6–000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation for Approval of Proposed Reliability Standards IRO–018–1 and TOP–010–1. Filed Date: 07/01/16. Accession Number: 20160526–5364. Comments Due: 5 p.m. ET 6/27/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings VerDate Sep<11>2014 17:30 Jun 07, 2016 Jkt 238001 must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 1, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–13447 Filed 6–7–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–122–000. Applicants: Virginia Electric and Power Company. Description: Application of Virginia Electric and Power Company for Authorization Under Section 203 of the Federal Power Act and Requests for Waivers, Shortened Comment Period and Expedited Consideration. Filed Date: 5/27/16. Accession Number: 20160527–5265. Comments Due: 5 p.m. ET 6/17/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1469–004; ER10–1467–004; ER10–1468–004; ER10–1459–008; ER13–785–003; ER13– 713–003; ER10–1453–004. Applicants: Cleveland Electric Illuminating Company, FirstEnergy Generation Mansfield Unit 1 Corp., FirstEnergy Generation, LLC, FirstEnergy Nuclear Generation, LLC, FirstEnergy Solutions Corp., Ohio Edison Company, The Toledo Edison Company, The Cleveland Electric Illuminating Company. Description: Notice of change in status of the FirstEnergy Companies et al. Filed Date: 5/27/16. Accession Number: 20160527–5247. Comments Due: 5 p.m. ET 6/17/16. Docket Numbers: ER15–623–009. Applicants: PJM Interconnection, L.L.C. PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 Description: Compliance filing: Compliance Filing pursuant to the May 10, 2016 Order on Rehearing and Compliance to be effective 4/1/2015. Filed Date: 5/31/16. Accession Number: 20160531–5509. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–923–002. Applicants: Puget Sound Energy, Inc. Description: Compliance filing: EIM Attachment O Compliance to be effective 7/25/2016. Filed Date: 5/27/16. Accession Number: 20160527–5209. Comments Due: 5 p.m. ET 6/17/16. Docket Numbers: ER16–1808–000. Applicants: Williams Flexible Generation, LLC. Description: Tariff Cancellation: Cancellation of Tariff to be effective 5/30/2016. Filed Date: 5/27/16. Accession Number: 20160527–5207. Comments Due: 5 p.m. ET 6/17/16. Docket Numbers: ER16–1809–000. Applicants: NSTAR Electric Company. Description: § 205(d) Rate Filing: First Amendment to Exelon West Medway II Design and Engineering Agreement to be effective 5/31/2016. Filed Date: 5/31/16. Accession Number: 20160531–5154. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1810–000. Applicants: Michigan Electric Transmission Company, LLC. Description: Notice of Cancellation of Generator Interconnection and Operating Agreement of Michigan Electric Transmission Company, LLC. Filed Date: 5/27/16. Accession Number: 20160527–5254. Comments Due: 5 p.m. ET 6/17/16. Docket Numbers: ER16–1811–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3204 KCP&L GMO and City of Rich Hill, MO Interconnection Agr to be effective 5/27/ 2016. Filed Date: 5/31/16. Accession Number: 20160531–5271. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1812–000. Applicants: Southwestern Electric Power Company. Description: Informational Filing regarding postemployment benefits other than pensions and postemployment benefits of Southwestern Electric Power Company. Filed Date: 5/27/16. Accession Number: 20160527–5259. Comments Due: 5 p.m. ET 6/17/16. Docket Numbers: ER16–1813–000. Applicants: New England Power Pool Participants Committee. E:\FR\FM\08JNN1.SGM 08JNN1 mstockstill on DSK3G9T082PROD with NOTICES Federal Register / Vol. 81, No. 110 / Wednesday, June 8, 2016 / Notices Description: § 205(d) Rate Filing: June 2016 Membership Filing to be effective 5/1/2016. Filed Date: 5/31/16. Accession Number: 20160531–5303. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1814–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Revisions to Attachment M Appendix 1 to Update the Loss Factor for SPS to be effective 5/1/2016. Filed Date: 5/31/16. Accession Number: 20160531–5321. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1815–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: DSA, Technicast Feed-In-Tariff Project to be effective 7/31/2016. Filed Date: 5/31/16. Accession Number: 20160531–5433. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1816–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA SA No. 4471, Queue No. AB1–119 to be effective 5/17/2016. Filed Date: 5/31/16. Accession Number: 20160531–5437. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1817–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2016– 05–31_Attachment X External NRIS Compliance Filing to be effective 12/31/ 9998. Filed Date: 5/31/16. Accession Number: 20160531–5480. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1818–000. Applicants: South Eastern Generating Corp. Description: Tariff Cancellation: Notice of Cancellation to be effective 6/1/2016. Filed Date: 5/31/16. Accession Number: 20160531–5499. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1819–000. Applicants: South Eastern Electric Development Corp. Description: Tariff Cancellation: Notice of Cancellation to be effective 6/1/2016. Filed Date: 5/31/16. Accession Number: 20160531–5501. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1820–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of WMPA SA No. VerDate Sep<11>2014 17:30 Jun 07, 2016 Jkt 238001 3252, Queue No. W4–031 to be effective 7/22/2016. Filed Date: 5/31/16. Accession Number: 20160531–5502. Comments Due: 5 p.m. ET 6/21/16. Docket Numbers: ER16–1821–000. Applicants: Utility Contract Funding II, L.L.C. Description: Tariff Cancellation: Notice of Cancellation to be effective 6/1/2016. Filed Date: 5/31/16. Accession Number: 20160531–5503. Comments Due: 5 p.m. ET 6/21/16. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH16–7–000. Applicants: Public Sector Pension Investment Board. Description: Public Sector Pension Investment Board submits FERC 65–B Waiver Notification. Filed Date: 5/27/16. Accession Number: 20160527–5264. Comments Due: 5 p.m. ET 6/17/16. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR16–4–000. Applicants: North American Electric Reliability Corporation. Description: North American Electric Reliability Corporation’s Report of Comparisons of Budgeted to Actual Costs for 2015 for NERC and the Regional Entities. Filed Date: 5/31/16. Accession Number: 20160531–5442. Comments Due: 5 p.m. ET 6/21/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 31, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. ENVIRONMENTAL PROTECTION AGENCY [FRL–9947–38–Region 4; CERCLA–04– 2016–3751] Cannon Drive Drum Superfund Site Social Circle, Walton County, Georgia; Notice of Settlement Environmental Protection Agency (EPA). AGENCY: ACTION: Notice. Under 122(h) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the United States Environmental Protection Agency has entered into a settlement with Carter Jackson Inc., The Estate of Charles E. Carter and the United States Defense Logistics Agency, concerning the Cannon Drive Drum Superfund Site located in Social Circle, Walton County, Georgia. The settlement addresses recovery of CERCLA costs for a cleanup action performed by the EPA at the Site. SUMMARY: The Agency will consider public comments on the settlement until July 8, 2016. The Agency will consider all comments received and may modify or withdraw its consent to the proposed settlement if comments received disclose facts or considerations which indicate that the proposed settlement is inappropriate, improper, or inadequate. DATES: Copies of the settlement are available from the Agency by contacting Ms. Paula V. Painter, Program Analyst, using the contact information provided in this notice. Comments may also be submitted by referencing the Site’s name through one of the following methods: • Internet: https://www.epa.gov/ aboutepa/about-epa-region-4southeast#r4-public-notices • U.S. Mail: U.S. Environmental Protection Agency Superfund Division, Attn: Paula V. Painter, 61 Forsyth Street SW., Atlanta, Georgia 30303. • Email: Painter.Paula@epa.gov. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Paula V. Painter at 404–562–8887. Dated: May 11, 2016. Anita L. Davis, Chief, Enforcement and Community Engagement Branch, Superfund Division. [FR Doc. 2016–13585 Filed 6–7–16; 8:45 am] [FR Doc. 2016–13444 Filed 6–7–16; 8:45 am] BILLING CODE 6560–50–P BILLING CODE 6717–01–P PO 00000 Frm 00052 Fmt 4703 36911 Sfmt 9990 E:\FR\FM\08JNN1.SGM 08JNN1

Agencies

[Federal Register Volume 81, Number 110 (Wednesday, June 8, 2016)]
[Notices]
[Pages 36910-36911]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13444]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC16-122-000.
    Applicants: Virginia Electric and Power Company.
    Description: Application of Virginia Electric and Power Company for 
Authorization Under Section 203 of the Federal Power Act and Requests 
for Waivers, Shortened Comment Period and Expedited Consideration.
    Filed Date: 5/27/16.
    Accession Number: 20160527-5265.
    Comments Due: 5 p.m. ET 6/17/16.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1469-004; ER10-1467-004; ER10-1468-004; ER10-
1459-008; ER13-785-003; ER13-713-003; ER10-1453-004.
    Applicants: Cleveland Electric Illuminating Company, FirstEnergy 
Generation Mansfield Unit 1 Corp., FirstEnergy Generation, LLC, 
FirstEnergy Nuclear Generation, LLC, FirstEnergy Solutions Corp., Ohio 
Edison Company, The Toledo Edison Company, The Cleveland Electric 
Illuminating Company.
    Description: Notice of change in status of the FirstEnergy 
Companies et al.
    Filed Date: 5/27/16.
    Accession Number: 20160527-5247.
    Comments Due: 5 p.m. ET 6/17/16.

    Docket Numbers: ER15-623-009.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Compliance Filing pursuant to the 
May 10, 2016 Order on Rehearing and Compliance to be effective 4/1/
2015.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5509.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-923-002.
    Applicants: Puget Sound Energy, Inc.
    Description: Compliance filing: EIM Attachment O Compliance to be 
effective 7/25/2016.
    Filed Date: 5/27/16.
    Accession Number: 20160527-5209.
    Comments Due: 5 p.m. ET 6/17/16.

    Docket Numbers: ER16-1808-000.
    Applicants: Williams Flexible Generation, LLC.
    Description: Tariff Cancellation: Cancellation of Tariff to be 
effective 5/30/2016.
    Filed Date: 5/27/16.
    Accession Number: 20160527-5207.
    Comments Due: 5 p.m. ET 6/17/16.

    Docket Numbers: ER16-1809-000.
    Applicants: NSTAR Electric Company.
    Description: Sec.  205(d) Rate Filing: First Amendment to Exelon 
West Medway II Design and Engineering Agreement to be effective 5/31/
2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5154.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1810-000.
    Applicants: Michigan Electric Transmission Company, LLC.
    Description: Notice of Cancellation of Generator Interconnection 
and Operating Agreement of Michigan Electric Transmission Company, LLC.
    Filed Date: 5/27/16.
    Accession Number: 20160527-5254.
    Comments Due: 5 p.m. ET 6/17/16.

    Docket Numbers: ER16-1811-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3204 KCP&L GMO and City of 
Rich Hill, MO Interconnection Agr to be effective 5/27/2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5271.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1812-000.
    Applicants: Southwestern Electric Power Company.
    Description: Informational Filing regarding postemployment benefits 
other than pensions and post-employment benefits of Southwestern 
Electric Power Company.
    Filed Date: 5/27/16.
    Accession Number: 20160527-5259.
    Comments Due: 5 p.m. ET 6/17/16.

    Docket Numbers: ER16-1813-000.
    Applicants: New England Power Pool Participants Committee.

[[Page 36911]]

    Description: Sec.  205(d) Rate Filing: June 2016 Membership Filing 
to be effective 5/1/2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5303.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1814-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: Revisions to Attachment M 
Appendix 1 to Update the Loss Factor for SPS to be effective 5/1/2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5321.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1815-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: DSA, Technicast Feed-In-
Tariff Project to be effective 7/31/2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5433.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1816-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA SA No. 4471, 
Queue No. AB1-119 to be effective 5/17/2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5437.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1817-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Compliance filing: 2016-05-31_Attachment X External 
NRIS Compliance Filing to be effective 12/31/9998.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5480.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1818-000.
    Applicants: South Eastern Generating Corp.
    Description: Tariff Cancellation: Notice of Cancellation to be 
effective 6/1/2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5499.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1819-000.
    Applicants: South Eastern Electric Development Corp.
    Description: Tariff Cancellation: Notice of Cancellation to be 
effective 6/1/2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5501.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1820-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of WMPA SA 
No. 3252, Queue No. W4-031 to be effective 7/22/2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5502.
    Comments Due: 5 p.m. ET 6/21/16.

    Docket Numbers: ER16-1821-000.
    Applicants: Utility Contract Funding II, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation to be 
effective 6/1/2016.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5503.
    Comments Due: 5 p.m. ET 6/21/16.

    Take notice that the Commission received the following public 
utility holding company filings:

    Docket Numbers: PH16-7-000.
    Applicants: Public Sector Pension Investment Board.
    Description: Public Sector Pension Investment Board submits FERC 
65-B Waiver Notification.
    Filed Date: 5/27/16.
    Accession Number: 20160527-5264.
    Comments Due: 5 p.m. ET 6/17/16.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR16-4-000.
    Applicants: North American Electric Reliability Corporation.
    Description: North American Electric Reliability Corporation's 
Report of Comparisons of Budgeted to Actual Costs for 2015 for NERC and 
the Regional Entities.
    Filed Date: 5/31/16.
    Accession Number: 20160531-5442.
    Comments Due: 5 p.m. ET 6/21/16.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 31, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-13444 Filed 6-7-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.