El Dorado Irrigation District; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 36531 [2016-13423]

Download as PDF Federal Register / Vol. 81, No. 109 / Tuesday, June 7, 2016 / Notices docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: May 26, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–13422 Filed 6–6–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 184–252] asabaliauskas on DSK3SPTVN1PROD with NOTICES El Dorado Irrigation District; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Application to amend license to remove project facilities. b. Project No.: 184–252. c. Date Filed: April 15, 2016. d. Applicant: El Dorado Irrigation District. e. Name of Project: El Dorado Hydroelectric Project. f. Location: The project is located on the South Fork American River and several tributaries in Alpine, Amador, and El Dorado counties, California. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Brian Deason, Hydroelectric Compliance Analyst, 2890 Mosquito Road, Placerville, CA 95667, (530) 642–4064. i. FERC Contact: Mr. Steven Sachs, (202) 502–8666, or steven.sachs@ ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and recommendations is 30 days from the date of issuance of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) VerDate Sep<11>2014 19:13 Jun 06, 2016 Jkt 238001 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P– 184–252) on any comments, motions to intervene, protests, or recommendations filed. k. Description of Request: The applicant requests that the Commission authorize the removal of the Carpenter Creek and Mill Creek diversion structures from the project. The applicant states that it has already physically removed the Carpenter Creek facilities and intends to demolish the Mill Creek diversion structure in 2017. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading, the name of the applicant and the PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 36531 project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: May 26, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–13423 Filed 6–6–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13563–003–Alaska] Juneau Hydropower, Inc.; Notice of Availability of the Final Environmental Impact Statement for the Sweetheart Lake Hydroelectric Project In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission or FERC) regulations contained in the Code of Federal Regulations (CFR)(18 CFR part 380 [FERC Order No. 486, 52 FR 47897]), the Office of Energy Projects has reviewed the application for an original license for the Sweetheart Lake Hydroelectric Project (FERC No. 13563) and prepared a final environmental impact statement (EIS) for the project. The proposed project would be located on Sweetheart Lake and Sweetheart Creek in the City and E:\FR\FM\07JNN1.SGM 07JNN1

Agencies

[Federal Register Volume 81, Number 109 (Tuesday, June 7, 2016)]
[Notices]
[Page 36531]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13423]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 184-252]


El Dorado Irrigation District; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application to amend license to remove 
project facilities.
    b. Project No.: 184-252.
    c. Date Filed: April 15, 2016.
    d. Applicant: El Dorado Irrigation District.
    e. Name of Project: El Dorado Hydroelectric Project.
    f. Location: The project is located on the South Fork American 
River and several tributaries in Alpine, Amador, and El Dorado 
counties, California.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Brian Deason, Hydroelectric Compliance 
Analyst, 2890 Mosquito Road, Placerville, CA 95667, (530) 642-4064.
    i. FERC Contact: Mr. Steven Sachs, (202) 502-8666, or 
steven.sachs@ferc.gov.
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the date of issuance of this 
notice. The Commission strongly encourages electronic filing. Please 
file motions to intervene, protests, comments, or recommendations using 
the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. Please include the project number (P-184-252) on 
any comments, motions to intervene, protests, or recommendations filed.
    k. Description of Request: The applicant requests that the 
Commission authorize the removal of the Carpenter Creek and Mill Creek 
diversion structures from the project. The applicant states that it has 
already physically removed the Carpenter Creek facilities and intends 
to demolish the Mill Creek diversion structure in 2017.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading, 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license amendment. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: May 26, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-13423 Filed 6-6-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.