Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 36537 [2016-13410]
Download as PDF
36537
Federal Register / Vol. 81, No. 109 / Tuesday, June 7, 2016 / Notices
Issue Notice of Acceptance ..............................................................................................................................................................
Issue Scoping Document 1 for comments .......................................................................................................................................
Comments on Scoping Document 1 ................................................................................................................................................
Issue Scoping Document 2 ..............................................................................................................................................................
Issue notice of ready for environmental analysis .............................................................................................................................
Commission issues EA, draft EA, or draft EIS .................................................................................................................................
Comments on EA or draft EA or draft EIS .......................................................................................................................................
Commission issues final EA of final EIS ..........................................................................................................................................
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: May 26, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–13424 Filed 6–6–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–462–000]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on May 20, 2016
Columbia Gas Transmission, LLC
(Columbia), 1300 Main Street, Houston,
Texas 77002 filed a prior notice request
pursuant to sections 157.205,
157.208(c), 157.213(b) and 157.216(b) of
the Commission’s regulations under the
Natural Gas Act (NGA). Columbia seeks
authorization to abandon and modify
certain storage facilities in the
Majorsville-Heard Storage Complex
(Storage Complex) in Marshall County,
West Virginia. The authorizations
proposed in this proceeding do not
relate to mining activities, thus as
Columbia’s blanket authorization issued
in Docket No. CP95–61–000 is limited to
those activities related to coal mining
activities in the Storage Complex,
Columbia is seeking abandonment
authority under its blanket certificate
issued in Docket No. CP83–76–000, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to
VerDate Sep<11>2014
19:13 Jun 06, 2016
Jkt 238001
Matthew J. Agen, Senior Counsel,
Columbia Gas Transmission, LLC, 5151
San Felipe Suite 2400, Houston, Texas
77056; telephone (713) 386–3619; or by
email magen@cpg.com .
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
May 2016.
June 2016.
July 2016.
October 2016.
October 2016.
April 2017.
May 2017.
July 2017.
copies of the environmental documents,
and will be notified of meetings
associated with he Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: June 1, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–13410 Filed 6–6–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3127–023]
Ware River Power, Inc.; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application to
amend 5 MW exemption from licensing.
b. Project No.: 3127–023.
c. Date Filed: January 27, 2016.
d. Applicant: Ware River Power, Inc.
e. Name of Project: Ware River
Project.
f. Location: The project is located on
the Ware River in Hampshire County,
Massachusetts.
E:\FR\FM\07JNN1.SGM
07JNN1
Agencies
[Federal Register Volume 81, Number 109 (Tuesday, June 7, 2016)]
[Notices]
[Page 36537]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13410]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP16-462-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on May 20, 2016 Columbia Gas Transmission, LLC
(Columbia), 1300 Main Street, Houston, Texas 77002 filed a prior notice
request pursuant to sections 157.205, 157.208(c), 157.213(b) and
157.216(b) of the Commission's regulations under the Natural Gas Act
(NGA). Columbia seeks authorization to abandon and modify certain
storage facilities in the Majorsville-Heard Storage Complex (Storage
Complex) in Marshall County, West Virginia. The authorizations proposed
in this proceeding do not relate to mining activities, thus as
Columbia's blanket authorization issued in Docket No. CP95-61-000 is
limited to those activities related to coal mining activities in the
Storage Complex, Columbia is seeking abandonment authority under its
blanket certificate issued in Docket No. CP83-76-000, all as more fully
set forth in the application which is on file with the Commission and
open to public inspection. The filing may also be viewed on the web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to
Matthew J. Agen, Senior Counsel, Columbia Gas Transmission, LLC, 5151
San Felipe Suite 2400, Houston, Texas 77056; telephone (713) 386-3619;
or by email magen@cpg.com .
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the NGA (18 CFR 157.205) file a protest to the request. If no protest
is filed within the time allowed therefore, the proposed activity shall
be deemed to be authorized effective the day after the time allowed for
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with he Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file
electronically should submit original and 5 copies of the protest or
intervention to the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426.
Dated: June 1, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-13410 Filed 6-6-16; 8:45 am]