Federal Register / Vol. 81, No. 102 / Thursday, May 26, 2016 / Notices
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: May 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–12406 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3TPTVN1PROD with NOTICES
Notice of Staff Attendance at South
Carolina Regional Transmission
Planning Meeting
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
attend the meeting of the South Carolina
Regional Planning (SCRTP) Stakeholder
Group, as noted below. Their attendance
is part of the Commission’s ongoing
outreach efforts.
SCRTP June 1, 2016 (10:00 a.m.–1:00
p.m.), SCE&G Lake Murray Training
Center—Lake Murray, Lexington, SC.
The facility’s phone number is (803)
217–9221. The meeting is open to the
public.
For more information, contact Mike
Lee, Office of Energy Market Regulation,
Federal Energy Regulatory Commission
at (202) 502–8658 or Michael.Lee@
ferc.gov.
VerDate Sep<11>2014
18:47 May 25, 2016
Jkt 238001
Dated: May 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–12419 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14752–000]
Rivertec Partners, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 16, 2016, Rivertec
Partners, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Sherman Hydroelectric Project
(Sherman Project or project) to be
located at the John Day Dam Juvenile
Fish Sampling and Monitoring Facility
(Juvenile Fish Facility) on the Columbia
River near the City of Rufus in Sherman
County, Oregon. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would utilize
flows at the existing Juvenile Fish
Facility, and would consist of the
following new features: (1) A 7-footdiameter, 55-foot-long steel penstock
connecting with the Juvenile Fish
Facility’s existing screened excess water
pipe; (2) a 71.2-foot-long, 26.2-footwide, 16.4-foot-high concrete and steel
powerhouse; (3) a 4.2-megawatt turbine
generator; (4) a 10.6-foot-diameter, 31.8foot-long steel draft tube returning flows
to the Columbia River; (5) either a 1,400foot-long, 13.8-kilovolt (kV)
transmission line interconnecting with
the existing John Day Dam transformer,
or an approximately 120-foot-long, 4.16kV or 13.8-kV transmission line
interconnecting with the existing
Bonneville Power Administration
substation; and (6) appurtenant
facilities. The estimated annual
generation of the Sherman Project
would be 33 gigawatt-hours.
Applicant Contact: Mr. Mark Steinley,
Rivertec Partners, LLC, 521 Thorn
Street, No. 331, Sewickley,
Pennsylvania 15143; phone: (480) 435–
0846.
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
FERC Contact: Sean O’Neill; phone:
(202) 502–6462.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
Days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14752–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14752) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: May 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–12422 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14550–001—CT]
New England Hydropower Company,
LLC; Notice of Availability of
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
the application for exemption from
licensing for the Hanover Pond Dam
Hydroelectric Project, to be located on
the Quinnipiac River, in the city of
E:\FR\FM\26MYN1.SGM
26MYN1
Federal Register / Vol. 81, No. 102 / Thursday, May 26, 2016 / Notices
Meriden, in New Haven County,
Connecticut, and has prepared an
Environmental Assessment (EA). In the
EA, Commission staff analyzes the
potential environmental effects of the
project and concludes that issuing an
exemption for the project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact Erin
Kimsey at (202) 502–8621 or
erin.kimsey@ferc.gov.
Dated: May 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–12420 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3TPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–51–002.
Applicants: T. Rowe Price Group, Inc.
Description: T. Rowe Price Group,
Inc., et al. submits Request for
Reauthorization and Extension of
Blanket Authorizations to Acquire and
Dispose of Securities under Section 203
of the Federal Power Act.
Filed Date: 3/3/16.
Accession Number: 20160303–0021.
Comments Due: 5 p.m. ET 6/2/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2984–026.
Applicants: Merrill Lynch
Commodities, Inc.
VerDate Sep<11>2014
18:47 May 25, 2016
Jkt 238001
Description: Notice of Non-Material
Change in Status of Merrill Lynch
Commodities, Inc.
Filed Date: 5/19/16.
Accession Number: 20160519–5166.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–974–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2016–
05–19_SA 2898 Ameren Illinois-Ford
County Wind Farm GIA (J375)
Compliance to be effective 2/20/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5157.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1742–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: Revisions to CTOA Attachment
A to add ITCI as a Transmission Owner
to be effective 6/1/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5163.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1743–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of Service
Agreement No. 2774, Queue V1–033
and W1–033 to be effective 5/11/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5164.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1744–000.
Applicants: Idaho Power Company.
Description: Section 205(d) Rate
Filing: Resubmitted BPA Conditional
Firm Service Agreements 324 and 342 to
be effective 7/1/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5186.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1745–000.
Applicants: New England Power
Company.
Description: Section 205(d) Rate
Filing: Filing—Transmission System
Upgrade Reimbursement Agreement
with Deerfield Wind to be effective
4/28/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5187.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1746–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) Rate
Filing: 2016–05–19_CTA Continuous
Improvement Filing to be effective
7/18/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5188.
Comments Due: 5 p.m. ET 6/9/16.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
33525
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–12430 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL00–95–291; EL00–98–263]
San Diego Gas & Electric Company v.
Sellers of Energy and Ancillary
Services Into Markets Operated by the
California Independent System
Operator Corporation and the
California Power Exchange;
Investigation of Practices of the
California Independent System
Operator and the California Power
Exchange; Notice of Compliance Filing
Take notice that on May 5, 2016, the
California Power Exchange Corporation
submitted its Refund Rerun Compliance
Filing pursuant to the Federal Energy
Regulatory Commission’s (Commission)
July 15, 2011 Order Accepting
Compliance Filings and Providing
Guidance.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
1 San Diego Gas & Elec. Co. v. Sellers of Energy
and Ancillary Servs., 136 FERC ¶ 61,036 (2011).
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 81, Number 102 (Thursday, May 26, 2016)]
[Notices]
[Pages 33524-33525]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-12420]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14550-001--CT]
New England Hydropower Company, LLC; Notice of Availability of
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has
reviewed the application for exemption from licensing for the Hanover
Pond Dam Hydroelectric Project, to be located on the Quinnipiac River,
in the city of
[[Page 33525]]
Meriden, in New Haven County, Connecticut, and has prepared an
Environmental Assessment (EA). In the EA, Commission staff analyzes the
potential environmental effects of the project and concludes that
issuing an exemption for the project, with appropriate environmental
measures, would not constitute a major federal action significantly
affecting the quality of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number, excluding the last three digits in the docket number
field, to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676,
or for TTY, (202) 502-8659. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of
new filings and issuances related to this or other pending projects.
For assistance, contact FERC Online Support.
For further information, contact Erin Kimsey at (202) 502-8621 or
erin.kimsey@ferc.gov.
Dated: May 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-12420 Filed 5-25-16; 8:45 am]
BILLING CODE 6717-01-P