Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 33527-33528 [2016-12416]

Download as PDF Federal Register / Vol. 81, No. 102 / Thursday, May 26, 2016 / Notices sradovich on DSK3TPTVN1PROD with NOTICES Connection provides technical support for webcasts and offers the option of listening to the workshop via phonebridge for a fee. If you have any questions, visit www.CapitolConnection.org or call (703) 993–3100. Those interested in attending the workshop or viewing the webcast are encouraged to register at https:// www.ferc.gov/whats-new/registration/ 06-30-16-form.asp. Commission workshops are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov, call (866) 208– 3372 (toll free) or (202) 208–8659 (TTY), or send a FAX to (202) 208–2106 with the required accommodations. Those who wish to file written comments may do so by July 28, 2016. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number AD16–17–000. All comments will be placed in the Commission’s public files and will be available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at www.ferc.gov using the eLibrary link. Enter AD16–17–000 in the docket number field to access documents. For assistance, please contact FERC Online Support. For more information about this workshop, please contact: Sam Wellborn (Technical Information), Office of Energy Market Regulation— East, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502– 6288, samuel.wellborn@ferc.gov. Gretchen Kershaw (Legal Information), Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502–8213, gretchen.kershaw@ferc.gov. Sarah McKinley (Logistical Information), Office of External Affairs, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502– 8004, sarah.mckinley@ferc.gov. VerDate Sep<11>2014 18:47 May 25, 2016 Jkt 238001 Dated: May 19, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–12421 Filed 5–25–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP16–459–000] Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on May 12, 2016, Texas Gas Transmission, LLC (Texas Gas), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed in Docket No. CP16–459–000, a prior notice request pursuant to sections 157.205 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA). Texas Gas seeks authorization to abandon one injection/withdrawal well and related facilities in its Graham Lake natural gas storage facility (Graham Lake), located in Muhlenberg County, Kentucky. Texas Gas states that plugging and abandoning the well will have no effect on the certificated physical parameters of Graham Lake, including total inventory, reservoir pressure, reservoir and buffer boundaries, and certificated capacity. Texas Gas proposes to perform these activities under its blanket certificate issued in Docket No. CP82–407–000, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to J. Kyle Stephens, Vice President, Regulatory Affairs, Texas Gas Transmission, LLC, 9 Greenway Plaza, Suite 2800, Houston, Texas, 77046, or by calling (713) 479– 8033 (telephone) or (713) 479–1818 (fax) kyle.stephens@bwpmlp.com. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 33527 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal E:\FR\FM\26MYN1.SGM 26MYN1 33528 Federal Register / Vol. 81, No. 102 / Thursday, May 26, 2016 / Notices Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: May 19, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–12416 Filed 5–25–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP16–456–000] sradovich on DSK3TPTVN1PROD with NOTICES Southern Star Central Gas Pipeline, Inc.; Notice of Application Take notice that on May 6, 2016, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro, Kentucky 42301, filed in Docket No. CP15–456–000, an application pursuant to section 7(b) of the Natural Gas Act and Part 157 of the Commission’s regulations, requesting approval to abandon the Shidler Line in Osage County, Oklahoma. The abandonment will not adversely affect any current customers served off the Shidler Line. Specifically, the project consists of abandoning in place approximately 31 miles of 16-inch pipeline and associated facilities to avert additional cost necessary for further evaluations, reconditioning and maintenance of the pipe, in order to meet DOT/PHMSA compliance, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to David N. Roberts, Analyst Staff, Regulatory Compliance, Southern Star Central Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky 42301, phone: (270) 852–4654, or, email: david.n.roberts@sscgp.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is VerDate Sep<11>2014 18:47 May 25, 2016 Jkt 238001 issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on June 9, 2016. Dated: May 19, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–12415 Filed 5–25–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–121–000. Applicants: RA Generation, LLC, Aurora Generation, LLC, NRG Rockford LLC, NRG Rockford II LLC, NRG Wholesale Generation LP. Description: Joint Application of RA Generation, LLC, et al. for Approval Under Section 203 of the Federal Power Act and Request for Expedited Action. Filed Date: 5/18/16. Accession Number: 20160518–5145. Comments Due: 5 p.m. ET 6/8/16. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG16–103–000. Applicants: Tropico, LLC. E:\FR\FM\26MYN1.SGM 26MYN1

Agencies

[Federal Register Volume 81, Number 102 (Thursday, May 26, 2016)]
[Notices]
[Pages 33527-33528]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-12416]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-459-000]


Texas Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on May 12, 2016, Texas Gas Transmission, LLC 
(Texas Gas), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed 
in Docket No. CP16-459-000, a prior notice request pursuant to sections 
157.205 and 157.216 of the Commission's regulations under the Natural 
Gas Act (NGA). Texas Gas seeks authorization to abandon one injection/
withdrawal well and related facilities in its Graham Lake natural gas 
storage facility (Graham Lake), located in Muhlenberg County, Kentucky. 
Texas Gas states that plugging and abandoning the well will have no 
effect on the certificated physical parameters of Graham Lake, 
including total inventory, reservoir pressure, reservoir and buffer 
boundaries, and certificated capacity. Texas Gas proposes to perform 
these activities under its blanket certificate issued in Docket No. 
CP82-407-000, all as more fully set forth in the application which is 
on file with the Commission and open to public inspection.
    The filing may be viewed on the web at https://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding this application should be directed to J. 
Kyle Stephens, Vice President, Regulatory Affairs, Texas Gas 
Transmission, LLC, 9 Greenway Plaza, Suite 2800, Houston, Texas, 77046, 
or by calling (713) 479-8033 (telephone) or (713) 479-1818 (fax) 
kyle.stephens@bwpmlp.com.
    Any person or the Commission's Staff may, within 60 days after the 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and, pursuant to section 157.205 of 
the Commission's Regulations under the NGA (18 CFR 157.205) a protest 
to the request. If no protest is filed within the time allowed 
therefore, the proposed activity shall be deemed to be authorized 
effective the day after the time allowed for protest. If a protest is 
filed and not withdrawn within 30 days after the time allowed for 
filing a protest, the instant request shall be treated as an 
application for authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file 
electronically should submit an original and 5 copies of the protest or 
intervention to the Federal

[[Page 33528]]

Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.

    Dated: May 19, 2016.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-12416 Filed 5-25-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.