Town of Payson, AZ; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 33518-33519 [2016-12412]
Download as PDF
33518
Federal Register / Vol. 81, No. 102 / Thursday, May 26, 2016 / Notices
203 of the FPA, we propose
clarifications and additional
information collection requirements
related to hold harmless commitments
offered by applicants.
Internal review: The Commission has
reviewed the changes included in the
Policy Statement and has determined
that the additional reporting and
recordkeeping requirements are
necessary.
Interested persons may obtain
information on the reporting
requirements by contacting: Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426
[Attention: Ellen Brown, Office of the
Executive Director, email:
DataClearance@ferc.gov, Phone: (202)
502–8663, fax: (202) 273–0873].
IV. Document Availability
sradovich on DSK3TPTVN1PROD with NOTICES
102. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the Internet through
FERC’s Home Page (https://
www.ferc.gov) and in FERC’s Public
Reference Room during normal business
hours (8:30 a.m. to 5:00 p.m. Eastern
time) at 888 First Street NE., Room 2A,
Washington DC 20426.
103. From FERC’s Home Page on the
Internet, this information is available on
eLibrary. The full text of this document
is available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
104. User assistance is available for
eLibrary and the FERC’s Web site during
normal business hours from FERC
Online Support at (202) 502–6652 (toll
free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202)502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
By the Commission.
Issued: May 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–12426 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 25, 2016.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL00–95–291; EL00–98–263]
San Diego Gas & Electric Company v.
Sellers of Energy and Ancillary
Services Into Markets Operated by the
California Independent System
Operator Corporation and the
California Power Exchange;
Investigation of Practices of the
California Independent System
Operator and the California Power
Exchange; Notice of Compliance Filing
Take notice that on May 4, 2016, the
California Independent System Operator
Corporation submitted its Refund Rerun
Compliance Filing pursuant to the
Federal Energy Regulatory
Commission’s (Commission) July 15,
2011 Order Accepting Compliance
Filings and Providing Guidance.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
1 San Diego Gas & Elec. Co. v. Sellers of Energy
and Ancillary Servs., 136 FERC ¶ 61,036 (2011).
VerDate Sep<11>2014
18:47 May 25, 2016
Jkt 238001
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
Dated: May 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–12409 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14776–000]
Town of Payson, AZ; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, Protests,
Recommendations, and Terms and
Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Conduit
Exemption.
b. Project No.: 14776–000.
c. Date filed: April 20, 2016.
d. Applicant: Town of Payson, AZ.
e. Name of Project: C.C. Cragin Raw
Water Supply Line Small Conduit
Hydroelectric Project.
f. Location: The proposed C.C. Cragin
Raw Water Supply Line Small Conduit
Hydroelectric Project would be located
on the Payson Water supply line in Gila
County, Arizona.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. LaRon
Garrett, Payson Public Works, 303
Beeline Hwy, Payson, AZ 85541; phone
(928) 474–5242, lgarrett@
ci.payson.az.us.
i. FERC Contact: Robert Bell, (202)
502–6062, robert.bell@ferc.gov.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for filing responsive
documents: The Commission directs,
pursuant to section 4.34(b) of the
Regulations (see Order No. 533, issued
May 8, 1991, 56 FR 23,108 (May 20,
1991)) that all comments, motions to
intervene, protests, recommendations,
terms and conditions, and prescriptions
concerning the application be filed with
the Commission: 60 days from the
issuance of this notice. All reply
E:\FR\FM\26MYN1.SGM
26MYN1
sradovich on DSK3TPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 102 / Thursday, May 26, 2016 / Notices
comments must be filed with the
Commission: 105 days from the
issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14776–000.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
l. Description of the project: The
proposed C.C. Cragin Raw Water Supply
Line Small Conduit Hydroelectric
Project would consist of: (1) A proposed
powerhouse containing one proposed
generating unit with an installed
capacity of 200 kilowatts placed in the
18-inch-diameter water supply pipeline;
and (2) appurtenant facilities. The
applicant estimates the project would
have an average annual generation of
1.256 gigawatt-hours.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the web at https://www.ferc.gov/docsfiling/elibrary.asp using the ‘‘eLibrary’’
link. Enter the docket number, P–14776,
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
n. Development Application—Any
qualified applicant desiring to file a
competing application must submit to
the Commission, on or before the
specified deadline date for the
VerDate Sep<11>2014
18:47 May 25, 2016
Jkt 238001
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
o. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
p. All filings must (1) bear in all
capital letters the title ‘‘PROTEST,’’
‘‘MOTION TO INTERVENE,’’
‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
33519
Dated: May 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–12412 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP16–454–000, CP16–455–
000, PF15–14–000]
Rio Grande LNG, LLC, Rio Bravo
Pipeline Company, LLC; Notice of
Application
Take notice that on May 5, 2016, Rio
Grande LNG, LLC (Rio Grande), 3
Water-way Square Place, Suite 400, The
Woodlands, Texas 77380, filed an
application, in Docket No. CP16–454–
000, pursuant to section 3(a) of the
Natural Gas Act (NGA) and Part 153 of
the Commission’s Regulations,
requesting authorization to site,
construct, modify, and operate a natural
gas liquefaction facility and liquefied
natural gas export and truck loading
terminal, located in Cameron County,
Texas.
Also, take notice that on May 5, 2016,
Rio Bravo Pipeline Company, LLC (Rio
Bravo), 3 Waterway Square Place, Suite
400, The Woodlands, Texas 77380, filed
an application pursuant to Section 7(c)
of the NGA, and Parts 157 and 284 of
the Commission’s regulations, an
application in Docket No. CP16–455–
000 for (1) a certificate of public
convenience and necessity (i)
authorizing Rio Bravo to construct, own,
and operate a natural gas pipeline
system, (ii) approving a pro forma
Tariff, and (iii) approving the proposed
initial rates for service; (2) a Part 157,
Subpart F blanket certificate authorizing
Rio Bravo to engage in certain selfimplementing routine activities; and (3)
a Part 284, Subpart G blanket certificate
authorizing Rio Bravo to transport
natural gas, on an open access and selfimplementing basis.
These filings may be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free (886) 208–3676 or TYY (202)
502–8659.
Any questions regarding this
application should be directed to Shaun
Davison, Senior Vice President, Rio
Grande LNG, LLC/Rio Bravo Pipeline
Company, LLC, 3 Waterway Square
Place, Suite 400, The Woodlands, Texas
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 81, Number 102 (Thursday, May 26, 2016)]
[Notices]
[Pages 33518-33519]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-12412]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14776-000]
Town of Payson, AZ; Notice of Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, Protests, Recommendations,
and Terms and Conditions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Conduit Exemption.
b. Project No.: 14776-000.
c. Date filed: April 20, 2016.
d. Applicant: Town of Payson, AZ.
e. Name of Project: C.C. Cragin Raw Water Supply Line Small Conduit
Hydroelectric Project.
f. Location: The proposed C.C. Cragin Raw Water Supply Line Small
Conduit Hydroelectric Project would be located on the Payson Water
supply line in Gila County, Arizona.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. LaRon Garrett, Payson Public Works, 303
Beeline Hwy, Payson, AZ 85541; phone (928) 474-5242,
lgarrett@ci.payson.az.us.
i. FERC Contact: Robert Bell, (202) 502-6062, robert.bell@ferc.gov.
j. Status of Environmental Analysis: This application is ready for
environmental analysis at this time, and the Commission is requesting
comments, reply comments, recommendations, terms and conditions, and
prescriptions.
k. Deadline for filing responsive documents: The Commission
directs, pursuant to section 4.34(b) of the Regulations (see Order No.
533, issued May 8, 1991, 56 FR 23,108 (May 20, 1991)) that all
comments, motions to intervene, protests, recommendations, terms and
conditions, and prescriptions concerning the application be filed with
the Commission: 60 days from the issuance of this notice. All reply
[[Page 33519]]
comments must be filed with the Commission: 105 days from the issuance
of this notice.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426. The first page of any
filing should include docket number P-14776-000.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
l. Description of the project: The proposed C.C. Cragin Raw Water
Supply Line Small Conduit Hydroelectric Project would consist of: (1) A
proposed powerhouse containing one proposed generating unit with an
installed capacity of 200 kilowatts placed in the 18-inch-diameter
water supply pipeline; and (2) appurtenant facilities. The applicant
estimates the project would have an average annual generation of 1.256
gigawatt-hours.
m. This filing is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the web at
https://www.ferc.gov/docs-filing/elibrary.asp using the ``eLibrary''
link. Enter the docket number, P-14776, in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3676 or
email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy
is also available for review and reproduction at the address in item h
above.
n. Development Application--Any qualified applicant desiring to
file a competing application must submit to the Commission, on or
before the specified deadline date for the particular application, a
competing development application, or a notice of intent to file such
an application. Submission of a timely notice of intent allows an
interested person to file the competing development application no
later than 120 days after the specified deadline date for the
particular application. Applications for preliminary permits will not
be accepted in response to this notice.
o. Protests or Motions to Intervene--Anyone may submit a protest or
a motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
p. All filings must (1) bear in all capital letters the title
``PROTEST,'' ``MOTION TO INTERVENE,'' ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;''
(2) set forth in the heading, the name of the applicant and the project
number of the application to which the filing responds; (3) furnish the
name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions or prescriptions must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. Any of
these documents must be filed by providing the original and seven
copies to: The Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426. An additional copy must be sent
to Director, Division of Hydropower Administration and Compliance,
Office of Energy Projects, Federal Energy Regulatory Commission, at the
above address. A copy of any protest or motion to intervene must be
served upon each representative of the applicant specified in the
particular application. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: May 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-12412 Filed 5-25-16; 8:45 am]
BILLING CODE 6717-01-P