San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange; Investigation of Practices of the California Independent System Operator and the California Power Exchange; Notice of Compliance Filing, 33518 [2016-12409]

Download as PDF 33518 Federal Register / Vol. 81, No. 102 / Thursday, May 26, 2016 / Notices 203 of the FPA, we propose clarifications and additional information collection requirements related to hold harmless commitments offered by applicants. Internal review: The Commission has reviewed the changes included in the Policy Statement and has determined that the additional reporting and recordkeeping requirements are necessary. Interested persons may obtain information on the reporting requirements by contacting: Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426 [Attention: Ellen Brown, Office of the Executive Director, email: DataClearance@ferc.gov, Phone: (202) 502–8663, fax: (202) 273–0873]. IV. Document Availability sradovich on DSK3TPTVN1PROD with NOTICES 102. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the Internet through FERC’s Home Page (https:// www.ferc.gov) and in FERC’s Public Reference Room during normal business hours (8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE., Room 2A, Washington DC 20426. 103. From FERC’s Home Page on the Internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. 104. User assistance is available for eLibrary and the FERC’s Web site during normal business hours from FERC Online Support at (202) 502–6652 (toll free at 1–866–208–3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502– 8371, TTY (202)502–8659. Email the Public Reference Room at public.referenceroom@ferc.gov. By the Commission. Issued: May 19, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–12426 Filed 5–25–16; 8:45 am] BILLING CODE 6717–01–P (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on May 25, 2016. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL00–95–291; EL00–98–263] San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange; Investigation of Practices of the California Independent System Operator and the California Power Exchange; Notice of Compliance Filing Take notice that on May 4, 2016, the California Independent System Operator Corporation submitted its Refund Rerun Compliance Filing pursuant to the Federal Energy Regulatory Commission’s (Commission) July 15, 2011 Order Accepting Compliance Filings and Providing Guidance.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call 1 San Diego Gas & Elec. Co. v. Sellers of Energy and Ancillary Servs., 136 FERC ¶ 61,036 (2011). VerDate Sep<11>2014 18:47 May 25, 2016 Jkt 238001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 Dated: May 20, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–12409 Filed 5–25–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14776–000] Town of Payson, AZ; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Conduit Exemption. b. Project No.: 14776–000. c. Date filed: April 20, 2016. d. Applicant: Town of Payson, AZ. e. Name of Project: C.C. Cragin Raw Water Supply Line Small Conduit Hydroelectric Project. f. Location: The proposed C.C. Cragin Raw Water Supply Line Small Conduit Hydroelectric Project would be located on the Payson Water supply line in Gila County, Arizona. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. LaRon Garrett, Payson Public Works, 303 Beeline Hwy, Payson, AZ 85541; phone (928) 474–5242, lgarrett@ ci.payson.az.us. i. FERC Contact: Robert Bell, (202) 502–6062, robert.bell@ferc.gov. j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. k. Deadline for filing responsive documents: The Commission directs, pursuant to section 4.34(b) of the Regulations (see Order No. 533, issued May 8, 1991, 56 FR 23,108 (May 20, 1991)) that all comments, motions to intervene, protests, recommendations, terms and conditions, and prescriptions concerning the application be filed with the Commission: 60 days from the issuance of this notice. All reply E:\FR\FM\26MYN1.SGM 26MYN1

Agencies

[Federal Register Volume 81, Number 102 (Thursday, May 26, 2016)]
[Notices]
[Page 33518]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-12409]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL00-95-291; EL00-98-263]


San Diego Gas & Electric Company v. Sellers of Energy and 
Ancillary Services Into Markets Operated by the California Independent 
System Operator Corporation and the California Power Exchange; 
Investigation of Practices of the California Independent System 
Operator and the California Power Exchange; Notice of Compliance Filing

    Take notice that on May 4, 2016, the California Independent System 
Operator Corporation submitted its Refund Rerun Compliance Filing 
pursuant to the Federal Energy Regulatory Commission's (Commission) 
July 15, 2011 Order Accepting Compliance Filings and Providing 
Guidance.\1\
---------------------------------------------------------------------------

    \1\ San Diego Gas & Elec. Co. v. Sellers of Energy and Ancillary 
Servs., 136 FERC ] 61,036 (2011).
---------------------------------------------------------------------------

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on May 25, 2016.

    Dated: May 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-12409 Filed 5-25-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.