San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange; Investigation of Practices of the California Independent System Operator and the California Power Exchange; Notice of Compliance Filing, 33525-33526 [2016-12408]
Download as PDF
Federal Register / Vol. 81, No. 102 / Thursday, May 26, 2016 / Notices
Meriden, in New Haven County,
Connecticut, and has prepared an
Environmental Assessment (EA). In the
EA, Commission staff analyzes the
potential environmental effects of the
project and concludes that issuing an
exemption for the project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact Erin
Kimsey at (202) 502–8621 or
erin.kimsey@ferc.gov.
Dated: May 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–12420 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3TPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–51–002.
Applicants: T. Rowe Price Group, Inc.
Description: T. Rowe Price Group,
Inc., et al. submits Request for
Reauthorization and Extension of
Blanket Authorizations to Acquire and
Dispose of Securities under Section 203
of the Federal Power Act.
Filed Date: 3/3/16.
Accession Number: 20160303–0021.
Comments Due: 5 p.m. ET 6/2/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2984–026.
Applicants: Merrill Lynch
Commodities, Inc.
VerDate Sep<11>2014
18:47 May 25, 2016
Jkt 238001
Description: Notice of Non-Material
Change in Status of Merrill Lynch
Commodities, Inc.
Filed Date: 5/19/16.
Accession Number: 20160519–5166.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–974–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2016–
05–19_SA 2898 Ameren Illinois-Ford
County Wind Farm GIA (J375)
Compliance to be effective 2/20/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5157.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1742–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: Revisions to CTOA Attachment
A to add ITCI as a Transmission Owner
to be effective 6/1/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5163.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1743–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of Service
Agreement No. 2774, Queue V1–033
and W1–033 to be effective 5/11/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5164.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1744–000.
Applicants: Idaho Power Company.
Description: Section 205(d) Rate
Filing: Resubmitted BPA Conditional
Firm Service Agreements 324 and 342 to
be effective 7/1/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5186.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1745–000.
Applicants: New England Power
Company.
Description: Section 205(d) Rate
Filing: Filing—Transmission System
Upgrade Reimbursement Agreement
with Deerfield Wind to be effective
4/28/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5187.
Comments Due: 5 p.m. ET 6/9/16.
Docket Numbers: ER16–1746–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) Rate
Filing: 2016–05–19_CTA Continuous
Improvement Filing to be effective
7/18/2016.
Filed Date: 5/19/16.
Accession Number: 20160519–5188.
Comments Due: 5 p.m. ET 6/9/16.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
33525
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–12430 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL00–95–291; EL00–98–263]
San Diego Gas & Electric Company v.
Sellers of Energy and Ancillary
Services Into Markets Operated by the
California Independent System
Operator Corporation and the
California Power Exchange;
Investigation of Practices of the
California Independent System
Operator and the California Power
Exchange; Notice of Compliance Filing
Take notice that on May 5, 2016, the
California Power Exchange Corporation
submitted its Refund Rerun Compliance
Filing pursuant to the Federal Energy
Regulatory Commission’s (Commission)
July 15, 2011 Order Accepting
Compliance Filings and Providing
Guidance.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
1 San Diego Gas & Elec. Co. v. Sellers of Energy
and Ancillary Servs., 136 FERC ¶ 61,036 (2011).
E:\FR\FM\26MYN1.SGM
26MYN1
33526
Federal Register / Vol. 81, No. 102 / Thursday, May 26, 2016 / Notices
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 26, 2016.
Dated: May 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–12408 Filed 5–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD16–17–000]
Reactive Supply Compensation in
Markets Operated by Regional
Transmission Organizations and
Independent System Operators;
Supplemental Notice of Workshop
As announced in the Notice of
Workshop issued on March 17, 2016, in
the above-captioned proceeding,1
Federal Energy Regulatory Commission
(Commission) staff will convene a
workshop on June 30, 2016, from 12:00
p.m. (EDT) to 4:00 p.m. (EDT) in the
Commission Meeting Room at 888 First
Street NE., Washington, DC 20426. The
workshop will be open to the public,
and all interested parties are invited to
attend and participate. The workshop
will be led by Commission staff, and
may be attended by one or more
Commissioners.
The purpose of the workshop is to
discuss compensation for Reactive
Supply and Voltage Control (Reactive
Supply) within the Regional
Transmission Organizations (RTOs) and
Independent System Operators (ISOs).
Specifically, the workshop will explore
the types of costs incurred by generators
ISO New England Inc ...............................................................................
Garrison Energy Center, LLC ...................................................................
Newark Energy Center, LLC ....................................................................
Scrubgrass Generating Company, L.P ....................................................
CPV Shore, LLC .......................................................................................
C.P. Crane LLC ........................................................................................
GenOn Energy Management, LLC ...........................................................
NRG Wholesale Generation LP ...............................................................
Talen Energy Marketing, LLC ..................................................................
sradovich on DSK3TPTVN1PROD with NOTICES
Constellation Power Source Generation, LLC .........................................
New Covert Generating Company, LLC ..................................................
Panda Liberty LLC ....................................................................................
Roundtop Energy LLC ..............................................................................
Beaver Dam Energy LLC .........................................................................
FirstEnergy Solutions Corp ......................................................................
Duke Energy Indiana, Inc .........................................................................
Wabash Valley Power Association, Inc ....................................................
Consumers Energy Company ..................................................................
MidAmerican Energy Company ................................................................
Indiana Municipal Power Agency .............................................................
BIF III Holtwood LLC ................................................................................
Seward Generation, LLC ..........................................................................
Northampton Generating Company, L.P ..................................................
for providing Reactive Supply capability
and service; whether those costs are
being recovered solely as compensation
for Reactive Supply or whether recovery
is also through compensation for other
services; and different methods by
which generators receive compensation
for Reactive Supply (e.g., Commissionapproved revenue requirements, marketwide rates, etc.). The workshop will also
explore potential adjustments in
compensation methods based on
changes in Reactive Supply capability
and potential mechanisms to prevent
overcompensation for Reactive Supply.
Attached to this supplemental notice
is an agenda for the workshop,
including Reactive Supply
compensation topics to be considered
for discussion at the workshop.
Questions that speakers should be
prepared to discuss are grouped by
topic.
Discussions at the workshop may
involve issues raised in proceedings that
are pending before the Commission.
These proceedings include, but are not
limited to:
Docket No. ER16–946–001.
Docket No. ER15–2735–000.
Docket Nos. ER15–1706–001, EL15–97–000.
Docket No. ER15–2254–000.
Docket Nos. ER15–2589–000, EL16–4–000.
Docket Nos. ER16–259–000, ER16–332–000, EL16–21–000.
Docket Nos. ER15–2571–000, ER15–2572–000, ER15–2573–000.
Docket Nos. ER16–413–000, ER04–1164–001, EL16–28–000.
Docket Nos. ER16–277–000, ER16–277–001, ER16–277–002, ER16–
277–003, EL16–44–000, EL16–44–001, ER08–1462–001, EL16–32–
000, ER16–1456–000.
Docket Nos. ER16–746–000, ER16–746–001.
Docket No. ER16–1226–000.
Docket No. ER16–1256–001.
Docket No. ER16–1004–000.
Docket Nos. ER16–1032–000, EL16–51–000.
Docket Nos. ER15–1510–000, ER15–1510–001.
Docket Nos. ER16–200–000, ER16–201–000, ER16–200–002.
Docket Nos. ER16–435–001, ER16–444–001.
Docket No. ER16–1058–000.
Docket No. ER16–1062–000.
Docket No. EL16–14–000.
Docket No. ER16–1530–000.
Docket No. ER16–1344–000.
Docket No. ER13–1431–001.
This workshop will be transcribed
and webcast. Transcripts of the
workshop will be available for a fee
from Ace-Federal Reporters, Inc. at (202)
347–3700. A free webcast of this event
will be available through www.ferc.gov.
Anyone with internet access who wants
to view this event can do so by
navigating to the Calendar of Events at
www.ferc.gov and locating this event in
the Calendar. The event will contain a
link to its webcast. The Capitol
1 Reactive Supply Compensation in Markets
Operated by Regional Transmission Organizations
and Independent System Operators, Docket No.
AD16–17–000 (Mar. 17, 2016) (Notice of
Workshop).
VerDate Sep<11>2014
18:47 May 25, 2016
Jkt 238001
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 81, Number 102 (Thursday, May 26, 2016)]
[Notices]
[Pages 33525-33526]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-12408]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL00-95-291; EL00-98-263]
San Diego Gas & Electric Company v. Sellers of Energy and
Ancillary Services Into Markets Operated by the California Independent
System Operator Corporation and the California Power Exchange;
Investigation of Practices of the California Independent System
Operator and the California Power Exchange; Notice of Compliance Filing
Take notice that on May 5, 2016, the California Power Exchange
Corporation submitted its Refund Rerun Compliance Filing pursuant to
the Federal Energy Regulatory Commission's (Commission) July 15, 2011
Order Accepting Compliance Filings and Providing Guidance.\1\
---------------------------------------------------------------------------
\1\ San Diego Gas & Elec. Co. v. Sellers of Energy and Ancillary
Servs., 136 FERC ] 61,036 (2011).
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the
[[Page 33526]]
comment date. On or before the comment date, it is not necessary to
serve motions to intervene or protests on persons other than the
Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on May 26, 2016.
Dated: May 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-12408 Filed 5-25-16; 8:45 am]