Download as PDF Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices morning and late afternoon. In the spring and fall, the project may operate in a peaking mode one or two times a day depending on electricity demand. The existing license requires maintaining the upper reservoir between elevations 938.0 feet and 1,000.5 feet NGVD 29 (i.e., a maximum reservoir drawdown of 62.5 feet). FirstLight proposes to increase the maximum water surface elevation of the upper reservoir to 1,004.5 feet NGVD 29 and decrease the minimum water surface elevation of the upper reservoir to 920.0 feet NGVD 29 (i.e., a maximum reservoir drawdown of 84.5 feet) yearround. l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in item (h) above. m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: In the final license application, FirstLight states that it will file an amended final license application after it completes all of the required studies in the approved study plan. On May 5, 2016, Commission staff issued a revised process plan and schedule that include milestones and dates for the filing and review of FirstLight’s outstanding study reports. After FirstLight completes and files the outstanding study reports and amended final license application, Commission staff will issue a revised procedural schedule with target dates for the postfiling milestones listed below. Target date Milestone Amended Final License Application ........................................................................................................................................................... Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................................... Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ........................................................................ Commission issues Draft Environmental Impact Statement (EIS) ............................................................................................................ Comments on Draft EIS ............................................................................................................................................................................. Modified terms and conditions ................................................................................................................................................................... Commission issues Final EIS ..................................................................................................................................................................... o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: May 13, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–11889 Filed 5–19–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK3G9T082PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC08–126–001. Applicants: LS Power Development, LLC, Luminus Management, LLC. Description: Request for Suspension of Reporting Obligations, LS Power Development, LLC and Luminus Management, LLC. Filed Date: 5/11/16. Accession Number: 20160511–5306. Comments Due: 5 p.m. ET 5/26/16. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG16–98–000. Applicants: Paulding Wind Farm III LLC. VerDate Sep<11>2014 17:40 May 19, 2016 Jkt 238001 Description: Self-Certification of EWG of Paulding Wind Farm III LLC. Filed Date: 5/13/16. Accession Number: 20160513–5046. Comments Due: 5 p.m. ET 6/3/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2331–055; ER10–2319–046; ER10–2317–046; ER13–1351–028; ER10–2330–053. Applicants: J.P. Morgan Ventures Energy Corporation, BE Alabama LLC, BE CA LLC, Florida Power Development LLC, Utility Contract Funding, L.L.C. Description: Notice of Non-Material Change in Status of the JPMorgan Sellers. Filed Date: 5/12/16. Accession Number: 20160512–5259. Comments Due: 5 p.m. ET 6/2/16. Docket Numbers: ER16–1331–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: Amended Filing-Clarify Process to Study Requests for Short-Term Service to be effective 5/31/2016. Filed Date: 5/13/16. Accession Number: 20160513–5047. Comments Due: 5 p.m. ET 6/3/16. Docket Numbers: ER16–1689–000. Applicants: ArcelorMittal Cleveland LLC. Description: Baseline eTariff Filing: Petition for Acceptance of Market-Based Rate to be effective 6/30/2016. PO 00000 Frm 00023 Fmt 4703 31931 Sfmt 4703 TBD TBD TBD TBD TBD TBD TBD Filed Date: 5/13/16. Accession Number: 20160513–5001. Comments Due: 5 p.m. ET 6/3/16. Docket Numbers: ER16–1690–000. Applicants: Public Service Company of Colorado. Description: Compliance filing: 20160513 ER16–524 CSU Renewable Energy Credits to be effective 4/16/2016. Filed Date: 5/13/16. Accession Number: 20160513–5070. Comments Due: 5 p.m. ET 6/3/16. Docket Numbers: ER16–1691–000. Applicants: Escalante Solar III, LLC. Description: Compliance filing: Comp. Filing—Amendment to MBR Tariff Limits. and Exemptions to be effective 7/12/2016. Filed Date: 5/13/16. Accession Number: 20160513–5072. Comments Due: 5 p.m. ET 6/3/16. Docket Numbers: ER16–1692–000. Applicants: Arizona Public Service Company. Description: Section 205(d) Rate Filing: Rate Schedule Nos. 44, 98, 211— Four Corners Acquisition to be effective 12/31/9998. Filed Date: 5/13/16. Accession Number: 20160513–5076. Comments Due: 5 p.m. ET 6/3/16. Docket Numbers: ER16–1693–000. Applicants: Arizona Public Service Company. Description: Section 205(d) Rate Filing: Reassignment of Service Agreement Nos. 350, 351 and 352 to be effective 4/15/2016. E:\FR\FM\20MYN1.SGM 20MYN1 31932 Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices Filed Date: 5/13/16. Accession Number: 20160513–5077. Comments Due: 5 p.m. ET 6/3/16. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES16–35–000. Applicants: MDU Resources Group, Inc. Description: Application of MDU Resources Group, Inc. for Authorization to issue securities for the Long-Term Performance Based Incentive Plan. Filed Date: 5/12/16. Accession Number: 20160512–5266. Comments Due: 5 p.m. ET 6/2/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 13, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–11886 Filed 5–19–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2146–165] mstockstill on DSK3G9T082PROD with NOTICES Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Recreation Plan. b. Project No: 2146–165. c. Date Filed: March 31, 2016. d. Applicant: Alabama Power Company. e. Name of Project: Coosa River Hydroelectric Project. f. Location: The project is located on the Coosa River in Cherokee, Calhoun, VerDate Sep<11>2014 17:40 May 19, 2016 Jkt 238001 Etowah, St. Clair, Talladega, Chilton, Coosa, Shelby, and Elmore Counties, Alabama, as well as Floyd County, Georgia. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: David Anderson, Alabama Power Company, 600 18th Street North, P.O. Box 2641, Birmingham, AL, 35203–8180, (205) 257–1398, dkanders@southernco.com. i. FERC Contact: Dr. Mark Ivy, (202) 502–6156, mark.ivy@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: June 13, 2016. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2146–165. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: As required by article 413 of the license, Alabama Power Company requests Commission approval of a proposed recreation plan for the project. The recreation plan provides a description of all existing and proposed recreation sites at the project (including any planned improvements at each site), an evaluation of existing signage at each site, a review of soil erosion and sediment control measures planned to stabilize shorelines where ground disturbing activities may occur, a discussion of refuse management at project recreation sites including implementation of a ‘‘carry in/carry out’’ program, a description of how the PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 needs of persons with disability were considered in the planning and design of recreation facilities, and a provision to monitor woody debris. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list E:\FR\FM\20MYN1.SGM 20MYN1

Agencies

[Federal Register Volume 81, Number 98 (Friday, May 20, 2016)]
[Notices]
[Pages 31931-31932]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-11886]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC08-126-001.
    Applicants: LS Power Development, LLC, Luminus Management, LLC.
    Description: Request for Suspension of Reporting Obligations, LS 
Power Development, LLC and Luminus Management, LLC.
    Filed Date: 5/11/16.
    Accession Number: 20160511-5306.
    Comments Due: 5 p.m. ET 5/26/16.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG16-98-000.
    Applicants: Paulding Wind Farm III LLC.
    Description: Self-Certification of EWG of Paulding Wind Farm III 
LLC.
    Filed Date: 5/13/16.
    Accession Number: 20160513-5046.
    Comments Due: 5 p.m. ET 6/3/16.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2331-055; ER10-2319-046; ER10-2317-046; ER13-
1351-028; ER10-2330-053.
    Applicants: J.P. Morgan Ventures Energy Corporation, BE Alabama 
LLC, BE CA LLC, Florida Power Development LLC, Utility Contract 
Funding, L.L.C.
    Description: Notice of Non-Material Change in Status of the 
JPMorgan Sellers.
    Filed Date: 5/12/16.
    Accession Number: 20160512-5259.
    Comments Due: 5 p.m. ET 6/2/16.

    Docket Numbers: ER16-1331-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Tariff Amendment: Amended Filing-Clarify Process to 
Study Requests for Short-Term Service to be effective 5/31/2016.
    Filed Date: 5/13/16.
    Accession Number: 20160513-5047.
    Comments Due: 5 p.m. ET 6/3/16.

    Docket Numbers: ER16-1689-000.
    Applicants: ArcelorMittal Cleveland LLC.
    Description: Baseline eTariff Filing: Petition for Acceptance of 
Market-Based Rate to be effective 6/30/2016.
    Filed Date: 5/13/16.
    Accession Number: 20160513-5001.
    Comments Due: 5 p.m. ET 6/3/16.

    Docket Numbers: ER16-1690-000.
    Applicants: Public Service Company of Colorado.
    Description: Compliance filing: 20160513 ER16-524 CSU Renewable 
Energy Credits to be effective 4/16/2016.
    Filed Date: 5/13/16.
    Accession Number: 20160513-5070.
    Comments Due: 5 p.m. ET 6/3/16.

    Docket Numbers: ER16-1691-000.
    Applicants: Escalante Solar III, LLC.
    Description: Compliance filing: Comp. Filing--Amendment to MBR 
Tariff Limits. and Exemptions to be effective 7/12/2016.
    Filed Date: 5/13/16.
    Accession Number: 20160513-5072.
    Comments Due: 5 p.m. ET 6/3/16.

    Docket Numbers: ER16-1692-000.
    Applicants: Arizona Public Service Company.
    Description: Section 205(d) Rate Filing: Rate Schedule Nos. 44, 98, 
211--Four Corners Acquisition to be effective 12/31/9998.
    Filed Date: 5/13/16.
    Accession Number: 20160513-5076.
    Comments Due: 5 p.m. ET 6/3/16.

    Docket Numbers: ER16-1693-000.
    Applicants: Arizona Public Service Company.
    Description: Section 205(d) Rate Filing: Reassignment of Service 
Agreement Nos. 350, 351 and 352 to be effective 4/15/2016.

[[Page 31932]]

    Filed Date: 5/13/16.
    Accession Number: 20160513-5077.
    Comments Due: 5 p.m. ET 6/3/16.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES16-35-000.
    Applicants: MDU Resources Group, Inc.
    Description: Application of MDU Resources Group, Inc. for 
Authorization to issue securities for the Long-Term Performance Based 
Incentive Plan.
    Filed Date: 5/12/16.
    Accession Number: 20160512-5266.
    Comments Due: 5 p.m. ET 6/2/16.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 13, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-11886 Filed 5-19-16; 8:45 am]
BILLING CODE 6717-01-P