Combined Notice of Filings #1, 31931-31932 [2016-11886]
Download as PDF
Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices
morning and late afternoon. In the
spring and fall, the project may operate
in a peaking mode one or two times a
day depending on electricity demand.
The existing license requires
maintaining the upper reservoir
between elevations 938.0 feet and
1,000.5 feet NGVD 29 (i.e., a maximum
reservoir drawdown of 62.5 feet).
FirstLight proposes to increase the
maximum water surface elevation of the
upper reservoir to 1,004.5 feet NGVD 29
and decrease the minimum water
surface elevation of the upper reservoir
to 920.0 feet NGVD 29 (i.e., a maximum
reservoir drawdown of 84.5 feet) yearround.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: In the final
license application, FirstLight states that
it will file an amended final license
application after it completes all of the
required studies in the approved study
plan. On May 5, 2016, Commission staff
issued a revised process plan and
schedule that include milestones and
dates for the filing and review of
FirstLight’s outstanding study reports.
After FirstLight completes and files the
outstanding study reports and amended
final license application, Commission
staff will issue a revised procedural
schedule with target dates for the postfiling milestones listed below.
Target
date
Milestone
Amended Final License Application ...........................................................................................................................................................
Notice of Acceptance/Notice of Ready for Environmental Analysis ..........................................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ........................................................................
Commission issues Draft Environmental Impact Statement (EIS) ............................................................................................................
Comments on Draft EIS .............................................................................................................................................................................
Modified terms and conditions ...................................................................................................................................................................
Commission issues Final EIS .....................................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: May 13, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–11889 Filed 5–19–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK3G9T082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC08–126–001.
Applicants: LS Power Development,
LLC, Luminus Management, LLC.
Description: Request for Suspension
of Reporting Obligations, LS Power
Development, LLC and Luminus
Management, LLC.
Filed Date: 5/11/16.
Accession Number: 20160511–5306.
Comments Due: 5 p.m. ET 5/26/16.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–98–000.
Applicants: Paulding Wind Farm III
LLC.
VerDate Sep<11>2014
17:40 May 19, 2016
Jkt 238001
Description: Self-Certification of EWG
of Paulding Wind Farm III LLC.
Filed Date: 5/13/16.
Accession Number: 20160513–5046.
Comments Due: 5 p.m. ET 6/3/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–055;
ER10–2319–046; ER10–2317–046;
ER13–1351–028; ER10–2330–053.
Applicants: J.P. Morgan Ventures
Energy Corporation, BE Alabama LLC,
BE CA LLC, Florida Power Development
LLC, Utility Contract Funding, L.L.C.
Description: Notice of Non-Material
Change in Status of the JPMorgan
Sellers.
Filed Date: 5/12/16.
Accession Number: 20160512–5259.
Comments Due: 5 p.m. ET 6/2/16.
Docket Numbers: ER16–1331–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Amended Filing-Clarify Process to
Study Requests for Short-Term Service
to be effective 5/31/2016.
Filed Date: 5/13/16.
Accession Number: 20160513–5047.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16–1689–000.
Applicants: ArcelorMittal Cleveland
LLC.
Description: Baseline eTariff Filing:
Petition for Acceptance of Market-Based
Rate to be effective 6/30/2016.
PO 00000
Frm 00023
Fmt 4703
31931
Sfmt 4703
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Filed Date: 5/13/16.
Accession Number: 20160513–5001.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16–1690–000.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing:
20160513 ER16–524 CSU Renewable
Energy Credits to be effective 4/16/2016.
Filed Date: 5/13/16.
Accession Number: 20160513–5070.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16–1691–000.
Applicants: Escalante Solar III, LLC.
Description: Compliance filing: Comp.
Filing—Amendment to MBR Tariff
Limits. and Exemptions to be effective
7/12/2016.
Filed Date: 5/13/16.
Accession Number: 20160513–5072.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16–1692–000.
Applicants: Arizona Public Service
Company.
Description: Section 205(d) Rate
Filing: Rate Schedule Nos. 44, 98, 211—
Four Corners Acquisition to be effective
12/31/9998.
Filed Date: 5/13/16.
Accession Number: 20160513–5076.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16–1693–000.
Applicants: Arizona Public Service
Company.
Description: Section 205(d) Rate
Filing: Reassignment of Service
Agreement Nos. 350, 351 and 352 to be
effective 4/15/2016.
E:\FR\FM\20MYN1.SGM
20MYN1
31932
Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices
Filed Date: 5/13/16.
Accession Number: 20160513–5077.
Comments Due: 5 p.m. ET 6/3/16.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES16–35–000.
Applicants: MDU Resources Group,
Inc.
Description: Application of MDU
Resources Group, Inc. for Authorization
to issue securities for the Long-Term
Performance Based Incentive Plan.
Filed Date: 5/12/16.
Accession Number: 20160512–5266.
Comments Due: 5 p.m. ET 6/2/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 13, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–11886 Filed 5–19–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2146–165]
mstockstill on DSK3G9T082PROD with NOTICES
Alabama Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Recreation Plan.
b. Project No: 2146–165.
c. Date Filed: March 31, 2016.
d. Applicant: Alabama Power
Company.
e. Name of Project: Coosa River
Hydroelectric Project.
f. Location: The project is located on
the Coosa River in Cherokee, Calhoun,
VerDate Sep<11>2014
17:40 May 19, 2016
Jkt 238001
Etowah, St. Clair, Talladega, Chilton,
Coosa, Shelby, and Elmore Counties,
Alabama, as well as Floyd County,
Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: David
Anderson, Alabama Power Company,
600 18th Street North, P.O. Box 2641,
Birmingham, AL, 35203–8180, (205)
257–1398, dkanders@southernco.com.
i. FERC Contact: Dr. Mark Ivy, (202)
502–6156, mark.ivy@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: June
13, 2016.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2146–165.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: As required
by article 413 of the license, Alabama
Power Company requests Commission
approval of a proposed recreation plan
for the project. The recreation plan
provides a description of all existing
and proposed recreation sites at the
project (including any planned
improvements at each site), an
evaluation of existing signage at each
site, a review of soil erosion and
sediment control measures planned to
stabilize shorelines where ground
disturbing activities may occur, a
discussion of refuse management at
project recreation sites including
implementation of a ‘‘carry in/carry
out’’ program, a description of how the
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
needs of persons with disability were
considered in the planning and design
of recreation facilities, and a provision
to monitor woody debris.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
E:\FR\FM\20MYN1.SGM
20MYN1
Agencies
[Federal Register Volume 81, Number 98 (Friday, May 20, 2016)]
[Notices]
[Pages 31931-31932]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-11886]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC08-126-001.
Applicants: LS Power Development, LLC, Luminus Management, LLC.
Description: Request for Suspension of Reporting Obligations, LS
Power Development, LLC and Luminus Management, LLC.
Filed Date: 5/11/16.
Accession Number: 20160511-5306.
Comments Due: 5 p.m. ET 5/26/16.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG16-98-000.
Applicants: Paulding Wind Farm III LLC.
Description: Self-Certification of EWG of Paulding Wind Farm III
LLC.
Filed Date: 5/13/16.
Accession Number: 20160513-5046.
Comments Due: 5 p.m. ET 6/3/16.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2331-055; ER10-2319-046; ER10-2317-046; ER13-
1351-028; ER10-2330-053.
Applicants: J.P. Morgan Ventures Energy Corporation, BE Alabama
LLC, BE CA LLC, Florida Power Development LLC, Utility Contract
Funding, L.L.C.
Description: Notice of Non-Material Change in Status of the
JPMorgan Sellers.
Filed Date: 5/12/16.
Accession Number: 20160512-5259.
Comments Due: 5 p.m. ET 6/2/16.
Docket Numbers: ER16-1331-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: Amended Filing-Clarify Process to
Study Requests for Short-Term Service to be effective 5/31/2016.
Filed Date: 5/13/16.
Accession Number: 20160513-5047.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16-1689-000.
Applicants: ArcelorMittal Cleveland LLC.
Description: Baseline eTariff Filing: Petition for Acceptance of
Market-Based Rate to be effective 6/30/2016.
Filed Date: 5/13/16.
Accession Number: 20160513-5001.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16-1690-000.
Applicants: Public Service Company of Colorado.
Description: Compliance filing: 20160513 ER16-524 CSU Renewable
Energy Credits to be effective 4/16/2016.
Filed Date: 5/13/16.
Accession Number: 20160513-5070.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16-1691-000.
Applicants: Escalante Solar III, LLC.
Description: Compliance filing: Comp. Filing--Amendment to MBR
Tariff Limits. and Exemptions to be effective 7/12/2016.
Filed Date: 5/13/16.
Accession Number: 20160513-5072.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16-1692-000.
Applicants: Arizona Public Service Company.
Description: Section 205(d) Rate Filing: Rate Schedule Nos. 44, 98,
211--Four Corners Acquisition to be effective 12/31/9998.
Filed Date: 5/13/16.
Accession Number: 20160513-5076.
Comments Due: 5 p.m. ET 6/3/16.
Docket Numbers: ER16-1693-000.
Applicants: Arizona Public Service Company.
Description: Section 205(d) Rate Filing: Reassignment of Service
Agreement Nos. 350, 351 and 352 to be effective 4/15/2016.
[[Page 31932]]
Filed Date: 5/13/16.
Accession Number: 20160513-5077.
Comments Due: 5 p.m. ET 6/3/16.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES16-35-000.
Applicants: MDU Resources Group, Inc.
Description: Application of MDU Resources Group, Inc. for
Authorization to issue securities for the Long-Term Performance Based
Incentive Plan.
Filed Date: 5/12/16.
Accession Number: 20160512-5266.
Comments Due: 5 p.m. ET 6/2/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 13, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-11886 Filed 5-19-16; 8:45 am]
BILLING CODE 6717-01-P