Notice of Effectiveness of Exempt Wholesale Generator Status, 30297 [2016-11527]
Download as PDF
Federal Register / Vol. 81, No. 94 / Monday, May 16, 2016 / Notices
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 26, 2016.
Dated: May 4, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: May 9, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–11517 Filed 5–13–16; 8:45 am]
[FR Doc. 2016–11528 Filed 5–13–16; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ID–7024–001]
Notice of Effectiveness of Exempt
Wholesale Generator Status
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Falck, David P.; Notice of Filing
Take notice that on May 5, 2016,
David P. Falck submitted for filing,
supplemental application for authority
to hold interlocking positions, pursuant
to section 305(b) of the Federal Power
Act and Part 45 of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
45.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
VerDate Sep<11>2014
18:48 May 13, 2016
Jkt 238001
Enterprise Solar, LLC .................
Escalante Solar I, LLC ................
Escalante Solar II, LLC ...............
Escalante Solar III, LLC ..............
Granite Mountain Solar East,
LLC.
Granite Mountain Solar West,
LLC.
Iron Springs Solar, LLC ..............
Seward Generation, LLC ............
Summer Solar LLC .....................
Ringer Hill Wind, LLC ...............
South Plains Wind Energy II,
LLC.
Comanche Solar PV, LLC ...........
Solar Star California XLI, LLC ...
Grant County Interconnect, LLC
Red Horse III, LLC ......................
62SK 8ME LLC ...........................
Middlesex Energy Center, LLC ..
San Roman Wind I, LLC ............
East Ridge Transmission, LLC ...
Black Hills Colorado IPP, LLC ...
EG16–42–000
EG16–43–000
EG16–44–000
EG16–45–000
EG16–46–000
EG16–47–000
EG16–48–000
EG16–49–000
EG16–50–000
EG16–51–000
EG16–52–000
EG16–53–000
EG16–54–000
EG16–55–000
EG16–56–000
EG16–57–000
EG16–58–000
EG16–59–000
EG16–60–000
EG16–61–000
Take notice that during the month of
April 2016, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: May 9, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–11527 Filed 5–13–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
30297
Filings Instituting Proceedings
Docket Numbers: RP16–930–000.
Applicants: Enable Mississippi River
Transmission, L.
Description: Section 4(d) Rate Filing:
Negotiated Rate Filing to Amend LER
5680’s Attachment A_5_5_16 to be
effective 5/5/2016.
Filed Date: 5/5/16.
Accession Number: 20160505–5154.
Comments Due: 5 p.m. ET 5/17/16.
Docket Numbers: RP16–931–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Section 4(d) Rate Filing:
Housekeeping Matters to be effective 6/
6/2016.
Filed Date: 5/6/16.
Accession Number: 20160506–5042.
Comments Due: 5 p.m. ET 5/18/16.
Docket Numbers: RP16–932–000.
Applicants: Ozark Gas Transmission,
L.L.C.
Description: Section 4(d) Rate Filing:
OGT May 2016 Cleanup Filing to be
effective 6/6/2016.
Filed Date: 5/6/16.
Accession Number: 20160506–5057.
Comments Due: 5 p.m. ET 5/18/16.
Docket Numbers: RP16–933–000.
Applicants: Dominion Cove Point
LNG, LP.
Description: Section 4(d) Rate Filing:
DCP—May 6, 2016 Administrative
Changes to be effective 6/6/2016.
Filed Date: 5/6/16.
Accession Number: 20160506–5163.
Comments Due: 5 p.m. ET 5/18/16.
Docket Numbers: RP16–934–000.
Applicants: Dominion Transmission,
Inc.
Description: Section 4(d) Rate Filing:
DTI—May 6, 2016 Administrative
Changes to be effective 6/6/2016.
Filed Date: 5/6/16.
Accession Number: 20160506–5170.
Comments Due: 5 p.m. ET 5/18/16.
Docket Numbers: RP16–935–000.
Applicants: Dominion Transmission,
Inc.
Description: Section 4(d) Rate Filing:
DTI—May 6, 2016 Negotiated Rate
Agreements to be effective 6/1/2016.
Filed Date: 5/6/16.
Accession Number: 20160506–5173.
Comments Due: 5 p.m. ET 5/18/16.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP16–929–001.
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 81, Number 94 (Monday, May 16, 2016)]
[Notices]
[Page 30297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-11527]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
Enterprise Solar, LLC................... EG16-42-000
Escalante Solar I, LLC.................. EG16-43-000
Escalante Solar II, LLC................. EG16-44-000
Escalante Solar III, LLC................ EG16-45-000
Granite Mountain Solar East, LLC........ EG16-46-000
Granite Mountain Solar West, LLC........ EG16-47-000
Iron Springs Solar, LLC................. EG16-48-000
Seward Generation, LLC.................. EG16-49-000
Summer Solar LLC........................ EG16-50-000
Ringer Hill Wind, LLC................... EG16-51-000
South Plains Wind Energy II, LLC........ EG16-52-000
Comanche Solar PV, LLC.................. EG16-53-000
Solar Star California XLI, LLC.......... EG16-54-000
Grant County Interconnect, LLC.......... EG16-55-000
Red Horse III, LLC...................... EG16-56-000
62SK 8ME LLC............................ EG16-57-000
Middlesex Energy Center, LLC............ EG16-58-000
San Roman Wind I, LLC................... EG16-59-000
East Ridge Transmission, LLC............ EG16-60-000
Black Hills Colorado IPP, LLC........... EG16-61-000
Take notice that during the month of April 2016, the status of the
above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Dated: May 9, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-11527 Filed 5-13-16; 8:45 am]
BILLING CODE 6717-01-P