Staff Notice of Alleged Violations, 29559 [2016-11224]
Download as PDF
29559
Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Staff Notice of Alleged Violations
Take notice 1 that in a nonpublic
investigation pursuant to 18 CFR part 1b
(2015), the staff of the Office of
Enforcement of the Federal Energy
Regulatory Commission has preliminary
determined that Saracen Energy
Midwest, LP, violated Southwest Power
Pool, Inc.’s Open Access Transmission
Tariff, Attachment AE, 7.4.1(4), by
submitting bids for Transmission
Congestion Rights at Electronically
Equivalent Settlement Locations
between August 2014 and March 2015.
This Notice does not confer a right on
third parties to intervene in the
investigation or any other right with
respect to the investigation.
Dated: May 6, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–11224 Filed 5–11–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12966–004]
Utah Board of Water Resources;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major
Unconstructed License.
b. Project No.: 12966–004.
c. Date Filed: May 2, 2016.
d. Applicant: Utah Board of Water
Resources.
e. Name of Project: Lake Powell
Pipeline Project.
f. Location: In Washington and Kane
counties, Utah, and in Coconino and
Mohave counties, Arizona. The project
would occupy 449 acres of federal land
managed by the Bureau of Land
Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Bill Leeflang,
Project Manager, Utah Division of Water
Resources; Telephone (801) 538–7293 or
billleeflang@utah.gov.
i. FERC Contact: Jim Fargo, (202) 502–
6095 or james.fargo@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The proposed Lake Powell Pipeline
Project would consist of: (1) 140 miles
of 69-inch-diameter pipeline and
penstock, (2) a combined conventional
peaking and pumped storage hydro
station, (3) four conventional inpipeline hydro stations, (4) a
conventional hydro station, and (4)
transmission lines.
The proposed project’s water intake
would convey water from the Bureau of
Reclamation’s Lake Powell up to a high
point within the Grand StaircaseEscalante National Monument, after
which it would flow through a series of
hydroelectric turbines, ending at Sand
Hollow reservoir, near St. George, Utah.
The energy generation components of
the proposed project would include: (1)
An inline single-unit, 1-megawatt (MW)
facility at Hydro Station 1 in the Grand
Staircase-Escalante National Monument;
(2) an inline single-unit, 1.7–MW
facility at Hydro Station 2 east of
Colorado City, Arizona; (3) an inline
single-unit, 1–MW facility in Hildale
City, Utah; (4) an inline single-unit, 1.7–
MW facility above the Hurricane Cliffs
forebay reservoir; (5) a 2-unit, 300–MW
(150–MW each unit) hydroelectric
pumped storage development at
Hurricane Cliffs, with the forebay and
afterbay sized to provide ten hours of
continuous 300–MW output; (6) a
single-unit, 35–MW conventional
energy recovery generation unit built
within the Hurricane Cliffs
development; and (7) a single-unit, 5–
MW facility at the existing Sand Hollow
Reservoir.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Notice of Acceptance/Notice of Ready for Environmental Analysis ................................................................................
Filing of recommendations, preliminary terms and conditions .........................................................................................
Commission issues Draft Environmental Impact Statement (DEIS) ................................................................................
Comments on DEIS ..........................................................................................................................................................
Modified terms and conditions .........................................................................................................................................
Commission issues Final EIS ...........................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: May 6, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–11226 Filed 5–11–16; 8:45 am]
BILLING CODE 6717–01–P
1 Enforcement of Statutes, Regulations, and
Orders, 129 FERC ¶ 61,247 (2009), order on reh’g,
134 FERC ¶ 61,054 (2011).
VerDate Sep<11>2014
17:02 May 11, 2016
Jkt 238001
PO 00000
Frm 00038
Fmt 4703
Sfmt 9990
E:\FR\FM\12MYN1.SGM
12MYN1
January 2017.
March 2017.
September 2017.
November 2017.
January 2018.
April 2018.
Agencies
[Federal Register Volume 81, Number 92 (Thursday, May 12, 2016)]
[Notices]
[Page 29559]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-11224]
[[Page 29559]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Staff Notice of Alleged Violations
Take notice \1\ that in a nonpublic investigation pursuant to 18
CFR part 1b (2015), the staff of the Office of Enforcement of the
Federal Energy Regulatory Commission has preliminary determined that
Saracen Energy Midwest, LP, violated Southwest Power Pool, Inc.'s Open
Access Transmission Tariff, Attachment AE, 7.4.1(4), by submitting bids
for Transmission Congestion Rights at Electronically Equivalent
Settlement Locations between August 2014 and March 2015.
---------------------------------------------------------------------------
\1\ Enforcement of Statutes, Regulations, and Orders, 129 FERC ]
61,247 (2009), order on reh'g, 134 FERC ] 61,054 (2011).
---------------------------------------------------------------------------
This Notice does not confer a right on third parties to intervene
in the investigation or any other right with respect to the
investigation.
Dated: May 6, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-11224 Filed 5-11-16; 8:45 am]