GE Hitachi Nuclear Energy; Vallecitos Nuclear Center, Partial Site Release, 29581-29584 [2016-11206]
Download as PDF
Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices
Endowment for the Arts, Washington,
DC 20506; plowitzk@arts.gov, or call
202–682–5691.
SUPPLEMENTARY INFORMATION: The
closed portions of meetings are for the
purpose of Panel review, discussion,
evaluation, and recommendations on
financial assistance under the National
Foundation on the Arts and the
Humanities Act of 1965, as amended,
including information given in
confidence to the agency. In accordance
with the determination of the Chairman
of February 15, 2012, these sessions will
be closed to the public pursuant to
subsection (c)(6) of section 552b of title
5, United States Code.
Dated: May 9, 2016.
Kathy Plowitz-Worden,
Panel Coordinator, National Endowment for
the Arts.
[FR Doc. 2016–11180 Filed 5–11–16; 8:45 am]
BILLING CODE 7537–01–P
NATIONAL SCIENCE FOUNDATION
concerning broadening participation in
science and engineering.
Agenda
D Opening Statement by the CEOSE
Chair
D NSF Executive Liaison Report
D Updates from the Federal Liaisons
D Presentation: NSF INCLUDES
(Inclusion across the Nation of
Communities of Learners that have
been Underrepresented for Diversity
in Engineering and Science)
D Leadership Discussion: Broadening
Participation in STEM: Disciplinary
Highlights
D Presentation: Science of Broadening
Participation
D Panel Discussion: Evaluation of NSF
BP Programs in EHR (Directorate for
Education and Human Resources)
D Working Session with EAC
(Evaluation and Assessment
Capability): Framework for a
Broadening Participation
Accountability System—Part II
D Work Session: 2015–2016 CEOSE
Biennial Report to Congress
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Committee on Equal Opportunities in
Science and Engineering Notice of
Meeting
Dated: May 8, 2016.
Crystal Robinson,
Committee Management Officer.
In accordance with the Federal
Advisory Committee Act (Pub. L. 92–
463, as amended), the National Science
Foundation announces the following
meeting:
Name: Committee on Equal
Opportunities in Science and
Engineering (CEOSE) #1173.
Dates/Time: June 8, 2016 1:00 p.m.–
5:30 p.m., June 9, 2016 8:30 a.m.–3:30
p.m.
Place: National Science Foundation
(NSF), 4201 Wilson Boulevard,
Arlington, VA 22230. To help facilitate
your entry into the building, please
contact Vickie Fung (vfung@nsf.gov) on
or prior to June 6, 2016.
Type of Meeting: Open.
Contact Person: Dr. Bernice
Anderson, Senior Advisor and CEOSE
Executive Secretary, Office of
Integrative Activities (OIA), National
Science Foundation, 4201 Wilson
Boulevard, Arlington, VA 22230.
Contact Information: 703–292–8040/
banderso@nsf.gov.
Minutes: Meeting minutes and other
information may be obtained from the
CEOSE Executive Secretary at the above
address or the Web site at https://
www.nsf.gov/od/oia/activities/ceose/
index.jsp.
Purpose of Meeting: To study data,
programs, policies, and other
information pertinent to the National
Science Foundation and to provide
advice and recommendations
[FR Doc. 2016–11166 Filed 5–11–16; 8:45 am]
VerDate Sep<11>2014
17:02 May 11, 2016
Jkt 238001
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–18, 50–73 and 50–183;
NRC–2015–0169]
GE Hitachi Nuclear Energy; Vallecitos
Nuclear Center, Partial Site Release
Nuclear Regulatory
Commission.
ACTION: Environmental assessment and
finding of no significant impact;
issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing an
environmental assessment and finding
of no significant impact regarding a
partial site release for license Nos. DPR–
1 (Vallecitos Boiling Water Reactor), R–
33 (GE-Hitachi Nuclear Test Reactor),
and DR–10 (Empire State Atomic
Development Agency Vallecitos
Experimental Superheat Reactor), issued
to GE Hitachi Nuclear Energy at the
Vallecitos Nuclear Center in Sunol,
California.
29581
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0169. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this document
(if that document is available in
ADAMS) is provided the first time that
a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Jack
Parrott, Division of Decommissioning,
Uranium Recovery, and Waste
Programs, Office of Nuclear Material
Safety and Safeguards, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–00001; telephone: 301–415–
6634; email: Jack.Parrott@nrc.gov.
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. Introduction
The environmental assessment
and finding of no significant impact set
forth in this document is available on
May 12, 2016.
ADDRESSES: Please refer to Docket ID
NRC–2015–0169 when contacting the
The NRC received, by letter dated
April 24, 2015 (ADAMS Accession No.
ML15114A437), a request from GE
Hitachi Nuclear Energy (GEH or
licensee) to approve a partial site release
of a portion of its Vallecitos Nuclear
Center (VNC) site located at 6705
Vallecitos Road, Sunol, California. The
April 24, 2015 letter transmitted a
report, entitled ‘‘Release of North
Section of Vallecitos, California Site,’’
prepared by GEH evaluating the
proposed release (ADAMS Accession
No. ML15114A438). The VNC site
contains four reactor units. Two of the
four units are licensed as power reactors
under part 50, ‘‘Domestic Licensing of
Production and Utilization Facilities,’’
DATES:
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
E:\FR\FM\12MYN1.SGM
12MYN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
29582
Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices
of title 10 of the Code of Federal
Regulations (10 CFR part 50). These two
units are the Vallecitos Boiling Water
Reactor (VBWR), NRC License DPR–1,
Docket 50–18, and the Empire State
Atomic Development Agency Vallecitos
Experimental Superheat Reactor
(EVESR), NRC License DR–10, Docket
50–183. In accordance with 10 CFR
50.4(b)(8)–(9), the licensee has certified,
pursuant to 10 CFR 50.82(a)(1), that
both units have permanently ceased
operation and that all nuclear fuel has
been removed from the respective
reactor vessels of both units. These units
are presently in ‘‘SAFSTOR’’ 1 status
awaiting the termination of the power
reactor licenses.
The third reactor unit is a shutdown
testing facility (also called a test
reactor), the General Electric Test
Reactor (GETR), NRC License TR–1,
Docket 50–70. The GETR has also been
defueled and is in a SAFSTOR status.
The fourth reactor unit is a currently
operating research reactor, the Nuclear
Test Reactor (NTR), NRC License R–33,
Docket 50–73. The NRC is considering
a license amendment application for the
NTR that would modify the site
description to remove the portion of the
site requested by the licensee for release
(see the connected action section of this
notice).
Research reactors and testing facilities
are non-power reactors that are used for
research and development, non-power
commercial activities, medical therapy,
education and training. Non-power
reactors differ from power reactors in a
number of significant ways. The
purpose of a power reactor is to generate
steam, which can be used to generate
electricity; the purpose of a non-power
reactor is to generate radiation for
purposes of experimentation, research
and development, commercial activities,
medical therapy, education, and
training. Therefore, non-power reactors
operate at significantly lower power
than power reactors and at lower
temperatures and pressure. For these
reasons, non-power reactors have
smaller safety and environmental
footprints than power reactors.
In accordance with 10 CFR 50.83,
‘‘Release of part of a power reactor
facility or site for unrestricted use,’’ the
licensee requested release from the NRC
licenses, for unrestricted use, an
approximately 247-hectare (610-acre)
parcel in the northern section of the
approximately 647-hectare (1,600 acre)
1 SAFSTOR is the decommissioning method in
which a nuclear facility is placed and maintained
in a condition that allows the safe storage of
radioactive components of the nuclear plant and
subsequent decontamination to levels that permit
license termination.
VerDate Sep<11>2014
17:02 May 11, 2016
Jkt 238001
VNC site. The licensee is declaring the
parcel as a ‘‘non-impacted area,’’ which
is defined in 10 CFR 50.2 to mean an
area ‘‘with no reasonable potential for
residual radioactivity in excess of
natural background or fallout levels.’’ If
approved, the 247-hectare (610-acre)
parcel will no longer be considered part
of the licensed site and thus, no longer
under NRC jurisdiction. Once released,
the 247-hectare (610-acre) parcel will be
available for unrestricted use. In this
regard, GEH has indicated that it
intends to sell the 247-hectare (610-acre)
parcel to a non-GEH controlled entity.
The NRC is considering approval of
the requested partial site release for the
VBWR and EVESR licenses at the VNC
site. Therefore, in compliance with the
National Environmental Policy Act, as
amended, 42 U.S.C. 4321 et seq.
(NEPA), and its NEPA implementing
regulations in 10 CFR part 51, the NRC
has prepared this Environmental
Assessment (EA). The NRC is preparing
this EA because the site was licensed
prior to the enactment of NEPA, and as
such, a Final Environmental Statement
(FES) or an Environmental Impact
Statement (EIS) were never prepared by
the NRC’s predecessor agency, the
Atomic Energy Commission (AEC),
when the site was first licensed. In
accordance with 10 CFR 50.83(b)(5), if
a FES or EIS had been previously
prepared, and if the licensee had
demonstrated that the environmental
impacts associated with the proposed
partial site release were bounded by the
FES or EIS, then the preparation of an
EA would not be necessary. As the EA
preparation here is due simply to the
absence of a FES or an EIS, the
preparation of this EA should not be
taken as precedent-setting for future
NRC approvals of 10 CFR 50.83 partial
site releases of non-impacted land
where the NRC or the AEC had
previously prepared a FES or an EIS and
the licensee has demonstrated that any
environmental impacts associated with
the partial site release are bounded by
that FES or EIS. Based on the results of
the EA that follows, the NRC has
determined not to prepare an EIS for the
partial site release, and is issuing a
finding of no significant impact.
thus, no longer under NRC jurisdiction.2
Under the applicable NRC regulation, 10
CFR 50.83(b), a licensee may submit a
written request for the release of nonimpacted land if a license amendment is
not otherwise required. Pursuant to 10
CFR 50.83(c), the NRC can approve such
a partial release of non-impacted land
for unrestricted use in writing.
Need for the Proposed Action
The licensee has requested the release
of the 247-hectare (610-acre), nonimpacted parcel as the licensee has no
current or projected operational need for
this parcel at the licensed site. In fact,
the licensee has never used the 247hectare (610-acre) parcel for licensed
operations. The licensee intends to sell
the parcel to a non-GEH controlled
entity. Once the NRC has approved the
release, the 247-hectare (610-acre)
parcel can be made available for another
use.
II. Environmental Assessment
VNC Site
VNC is located near the center of the
Pleasanton quadrangle of Alameda
County, California. The site is east of
San Francisco Bay, approximately 56 air
kilometers (35 air miles) east-southeast
of San Francisco and 32 air kilometers
(20 air miles) north of San Jose. The
properties surrounding the site are
primarily used for agriculture and cattle
raising, with some residences, which are
mostly to the west of the property. The
nearest sizeable towns are Pleasanton
located 6.6 kilometers (4.1 miles) to the
north-northwest and Livermore located
10 kilometers (6.2 miles) to the
northeast.
The site is on the north side of
Vallecitos Road (State Route 84), which
is a two and four-lane paved highway.
A Union Pacific railroad line lies about
three kilometers (two miles) west of the
site. There is light industrial activity
within a 16-kilometer (10-mile) radius
of the plant. San Jose (32 kilometers (20
miles) south), Oakland (48 kilometers
(30 miles) northwest) and San Francisco
(56 kilometers (35 miles) northwest) are
major industrial centers. The property
boundary, which has not changed since
the original property purchase in 1956,
is fenced and posted ‘‘No Trespassing.’’
A security gate at the entrance provides
access control to the active area of the
Description of the Proposed Action
The proposed action would approve
the release of a 247-hectare (610-acre),
non-impacted parcel, located in the
northern section of the approximately
647-hectare (1,600) acre VNC site, for
unrestricted use. Once released, the 247hectare (610-acre) parcel would no
longer be part of the licensed site and
2 The NRC’s organic statutory authority is the
Atomic Energy Act of 1954, as amended, 42 U.S.C.
2011 et seq. (AEA). Under the AEA, the NRC’s
jurisdiction is limited to matters of radiological
health and safety, for both members of the public
and occupational workers, and of physical security
for NRC licensed facilities and radioactive materials
possessed by NRC licensees. The NRC holds no
property interest in licensee owned or controlled
lands nor does the NRC have any land or natural
resources management authority.
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
E:\FR\FM\12MYN1.SGM
12MYN1
Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices
site. The GEH evaluation report
provides additional information about
the site (ADAMS Accession No.
ML15114A438).
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Safety Evaluation of the Proposed
Action
The NRC staff evaluated the safety
impacts of the proposed action and
concludes that the requirements of 10
CFR 50.83, 10 CFR 50.59, and other
applicable NRC regulations have been
met (see ADAMS Accession No.
ML16007A348).
Environmental Impacts of the Proposed
Action
The NRC staff evaluated the
environmental impacts of the proposed
action and concludes that the release of
the 247-hectare (610-acre) parcel will
not have any adverse environmental
impacts. The 247-hectare (610-acre)
parcel is located in the northern portion
of the site. The parcel consists of
undeveloped land and is currently used
for cattle grazing. The land has not been
used for the processing or storage of
radioactive material. The properties
surrounding the site are primarily used
for agriculture and cattle raising, with
some scattered residences mostly to the
west of the property. The power reactors
at the site have permanently ceased
operations and are being maintained in
a possession-only SAFSTOR status. The
release of the 247-hectare (610-acre)
parcel will not impact the shutdown
reactors. The licensee notes that the
247-hectare (610-acre) parcel has never
been used for licensed activity. The 247hectare (610-acre) parcel is
topographically uphill from the
shutdown reactors so any surface or
subsurface transport of liquid effluents
from the active area of the site could not
have impacted the parcel.
There is no evidence of any
radiological impact on the 247-hectare
(610-acre) parcel. Samples taken in the
area do not indicate impact from
licensed activities. The licensee
measured direct dose in and around the
247-hectare (610-acre) parcel and found
that all measurements were consistent
with a background direct dose
measurement of approximately 0.7
mSieverts/yr (70 mRem/yr) (GEH
Annual Report for 2014, ADAMS
Accession No. ML15069A472). The NRC
verified that the area to be released was
not radiologically impacted by licensed
site activities, as described in NRC
inspection report 050–00018/15–001
(ADAMS Accession No. ML15303A361)
dated October 30, 2015.
The NRC staff reviewed the request
and concluded that the environmental
impacts associated with this request
VerDate Sep<11>2014
17:02 May 11, 2016
Jkt 238001
remain bounded by the environmental
impacts evaluated in the previously
issued ‘‘Final Generic Environmental
Impact Statement on Decommissioning
of Nuclear Facilities,’’ NUREG–0586,
Supplement 1, Volume 1 (https://
www.nrc.gov/reading-rm/doccollections/nuregs/staff/sr0586/s1/v1/
index.html). NUREG–0586 evaluated the
environmental impacts of the
decommissioning of entire power
reactor sites and facilities that have been
impacted by operations. The release of
a part of a power reactor site that has
been demonstrated to not have been
impacted by operations is within the
scope of the evaluation performed in
NUREG–0586. The NRC staff concludes
that the proposed release of the 247hectare (610-acre) parcel is bounded by
NUREG–0586.
The NRC has determined that the
proposed release of the 247-hectare
(610-acre) parcel is wholly procedural
and administrative in nature, that the
parcel is radiologically non-impacted,
and that the licensee has no safety,
physical security, or emergency
preparedness need to retain the parcel.
The environmental impacts associated
with the shutdown power reactors will
not change as a result of the proposed
release of the 247-hectare (610-acre)
parcel. The proposed release will not
result in public or environmental
exposure to radioactive contamination.
There are no known records of any
spills, leaks, or uncontrolled release of
radioactive material on the 247-hectare
(610-acre parcel). The 247-hectare (610acre) parcel was not used for any
activities that could have contaminated
the property. Therefore, there are no
significant radiological environmental
impacts associated with the proposed
action.
With regard to potential nonradiological impacts, the proposed
release of the 247-hectare (610-acre)
parcel from NRC jurisdiction does not
involve or authorize any construction
activities, renovation of buildings or
structures, ground disturbing activities
or other alteration to land. The proposed
release of the 247-hectare (610-acre)
parcel will not result in any change to
current licensed activities on that
portion of the site that will remain
under NRC jurisdiction and therefore,
will not result in any changes to the
workforce or vehicular traffic.
Furthermore, as the NRC has
determined that the proposed release of
the 247-hectare (610-acre) parcel is an
administrative action, it is not a type of
activity that has the potential to cause
effects on historic properties or cultural
resources, including traditional cultural
properties. Similarly, the NRC staff has
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
29583
determined that the proposed release of
the 247-hectare (610-acre) parcel will
have no effect on listed species or
critical habitat. In addition the proposed
release of the 247-hectare (610-acre)
parcel will not result in any change to
non-radiological plant effluents and
thus, will have no impact on either air
or water quality. Therefore, there are no
significant non-radiological
environmental impacts associated with
the proposed release of the 247-hectare
(610-acre) parcel.
Accordingly, the NRC staff concludes
that there are no significant
environmental impacts associated with
the proposed action.
Connected Action
In accordance with 10 CFR 50.90,
GEH has also requested the amendment
of its operating research reactor license
for the NTR, NRC License R–33, Docket
50–73 to reflect the release of the 247hectare (610-acre) parcel. Specifically,
GEH has requested an amendment to the
license’s site description section. GEH
submitted that license amendment
request on February 16, 2015 (ADAMS
Accession No. ML15048A008;
attachments to the February 16, 2015
request are at ADAMS Accession Nos.
ML15048A007, ML15048A009,
ML15048A010, ML15048A011). The
NRC approval or disapproval of the
proposed NTR license amendment
request will be handled administratively
as a separate licensing matter. However,
the NRC considers that this EA
encompasses and otherwise bounds the
environmental impacts of the proposed
NTR license amendment request. As
discussed in Section I, ‘‘Introduction,’’
of this notice, a non-power reactor has
a much smaller safety and
environmental footprint than a power
reactor. In this regard, the NTR operates
at a power level of 100 kilowattsthermal. In contrast, the VBWR, the
largest of the decommissioned power
reactors at the site, operated at a much
higher power level, 50 megawattsthermal. As a further, comparison, a
typical commercial nuclear power
reactor is rated at 3000 megawattsthermal, and provides enough electricity
to power 200,000 households in the
peak summer months. Because of this
large difference in thermal power
generated, the consequence of an
accident at a non-power reactor is much
lower when compared to a commercial
power reactor. For this reason, the NTR
research reactors’ emergency planning
zones (EPZ) to protect the public from
potential radiological accidents is well
within the owner-controlled areas—and
is the boundary of the room in which
the reactor is housed. In accordance
E:\FR\FM\12MYN1.SGM
12MYN1
29584
Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices
with the guidance of ANSI/ANS 15.16–
1982, ‘‘Emergency Planning for
Research Reactors’’, the operations
boundary is defined as the EPZ
boundary for each reactor facility. For
the NTR, the operations boundary is
defined by the portions of Building 105
occupied by NTR facilities. The NRC
staff has concluded that the
environmental impacts of reducing the
licensed site would be similarly
bounded and that there would be no
environmental impact associated with
the continued operation of the NTR in
relation to the proposed release of the
247-hectare (610-acre) parcel.
The shutdown, defueled testing
facility, the GETR, NRC License TR–1,
Docket 50–70 is not the subject of any
license amendment request. The GETR
is in SAFSTOR status. The GETR
license does not contain a site
description and as such, there is no
need to amend the GETR license to
reflect the release of the 247-hectare
(610-acre) parcel. In any event, the NRC
staff considers this EA to encompass
and bound any environmental impacts
resulting from the proposed release of
the 247-hectare (610-acre) parcel in
relation to the ongoing shutdown,
SAFSTOR status of the GETR.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Environmental Impacts of the
Alternatives to the Proposed Action
As an alternative to the proposed
action, the NRC staff considered denial
of the proposed release of the 247hectare (610-acre) parcel (i.e., the ‘‘noaction’’ alternative). Denial of the
request would result in the 247-hectare
(610-acre) parcel remaining part of the
licensed site and subject to NRC
jurisdiction. As the licensee has no need
for the parcel, its current use as a site
for cattle grazing would most likely
continue. As there is no policy or
regulatory reason for the NRC to require
a licensee to retain land that is not
radiologically impacted and for which
the licensee has no further operational
need, the no-action alternative is not
further considered.
Conclusion
The NRC staff has concluded that the
proposed action will not significantly
impact the quality of the human
environment, and that the proposed
action is the preferred alternative.
Agencies and Persons Consulted
The NRC contacted the California
Department of Public Health concerning
this request. There were no comments,
concerns or objections from the State
official.
A public meeting to obtain comments
on the release approval request was
VerDate Sep<11>2014
17:02 May 11, 2016
Jkt 238001
announced on the NRC public meeting
Web site on July 7, 2015 (ADAMS
Accession No. ML15188A344). A notice
of GEH’s request to release the 247hectare (610-acre) parcel and the public
meeting, including a request for
comment, was also published in the TriValley Herald, Livermore, CA on July
15, 2015 (ADAMS Accession No.
ML15292A519). The NRC staff
published a notice of the receipt of
GEH’s request, including a request for
comment, in the Federal Register on
July 20, 2015 (80 FR 42846). The NRC
staff conducted the public meeting in
Pleasanton, CA on July 22, 2015. A
summary of the public meeting, which
includes copies of the presentations
made and a copy of the transcript of the
meeting, is available in ADAMS at
Accession No. ML15260A199. No
comments were made on the Federal
Rulemaking Web site, or were received
by mail or email, and all questions
asked at the meeting were answered in
the meeting.
III. Finding of No Significant Impact
The NRC staff has prepared this EA as
part of its review of the proposed action.
On the basis of this EA, the NRC finds
that there are no significant
environmental impacts from the
proposed action, and that preparation of
an environmental impact statement is
not warranted. Accordingly, the NRC
has determined that a finding of no
significant impact (FONSI) is
appropriate. In accordance with 10 CFR
51.32(a)(4), this FONSI incorporates the
EA set forth in this notice by reference.
Dated at Rockville, Maryland, this 4th day
of May 2016.
For the Nuclear Regulatory Commission.
John R. Tappert,
Director, Division of Decommissioning,
Uranium Recovery, and Waste Programs,
Office of Nuclear Material Safety and
Safeguards.
[FR Doc. 2016–11206 Filed 5–11–16; 8:45 am]
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
[Release No. 34–77778; File No. SR–BOX–
2016–21]
Self-Regulatory Organizations; BOX
Options Exchange LLC; Notice of
Filing and Immediate Effectiveness of
a Proposed Rule Change To Amend
the Fee Schedule on the BOX Market
LLC (‘‘BOX’’) Options Facility
Pursuant to Section 19(b)(1) of the
Securities Exchange Act of 1934 (the
Frm 00063
I. Self-Regulatory Organization’s
Statement of the Terms of the Substance
of the Proposed Rule Change
The Exchange is filing with the
Securities and Exchange Commission
(‘‘Commission’’) a proposed rule change
to amend the Fee Schedule on the BOX
Market LLC (‘‘BOX’’) options facility.
While changes to the fee schedule
pursuant to this proposal will be
effective upon filing, the changes will
become operative on May 2, 2016. The
text of the proposed rule change is
available from the principal office of the
Exchange, at the Commission’s Public
Reference Room and also on the
Exchange’s Internet Web site at https://
boxexchange.com.
II. Self-Regulatory Organization’s
Statement of the Purpose of, and
Statutory Basis for, the Proposed Rule
Change
In its filing with the Commission, the
Exchange included statements
concerning the purpose of and basis for
the proposed rule change and discussed
any comments it received on the
proposed rule change. The text of these
statements may be examined at the
places specified in Item IV below. The
Exchange has prepared summaries, set
forth in Sections A, B, and C below, of
the most significant aspects of such
statements.
A. Self-Regulatory Organization’s
Statement of the Purpose of, and
Statutory Basis for, the Proposed Rule
Change
1. Purpose
The Exchange proposes to amend the
Fee Schedule for trading on BOX.
1 15
May 6, 2016.
PO 00000
‘‘Act’’),1 and Rule 19b–4 thereunder,2
notice is hereby given that on April 29,
2016, BOX Options Exchange LLC (the
‘‘Exchange’’) filed with the Securities
and Exchange Commission
(‘‘Commission’’) the proposed rule
change as described in Items I, II, and
III below, which Items have been
prepared by the Exchange. The
Exchange filed the proposed rule change
pursuant to Section 19(b)(3)(A)(ii) of the
Act,3 and Rule 19b–4(f)(2) thereunder,4
which renders the proposal effective
upon filing with the Commission. The
Commission is publishing this notice to
solicit comments on the proposed rule
change from interested persons.
Fmt 4703
Sfmt 4703
U.S.C. 78s(b)(1).
CFR 240.19b–4.
3 15 U.S.C. 78s(b)(3)(A)(ii).
4 17 CFR 240.19b–4(f)(2).
2 17
E:\FR\FM\12MYN1.SGM
12MYN1
Agencies
[Federal Register Volume 81, Number 92 (Thursday, May 12, 2016)]
[Notices]
[Pages 29581-29584]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-11206]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-18, 50-73 and 50-183; NRC-2015-0169]
GE Hitachi Nuclear Energy; Vallecitos Nuclear Center, Partial
Site Release
AGENCY: Nuclear Regulatory Commission.
ACTION: Environmental assessment and finding of no significant impact;
issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an
environmental assessment and finding of no significant impact regarding
a partial site release for license Nos. DPR-1 (Vallecitos Boiling Water
Reactor), R-33 (GE-Hitachi Nuclear Test Reactor), and DR-10 (Empire
State Atomic Development Agency Vallecitos Experimental Superheat
Reactor), issued to GE Hitachi Nuclear Energy at the Vallecitos Nuclear
Center in Sunol, California.
DATES: The environmental assessment and finding of no significant
impact set forth in this document is available on May 12, 2016.
ADDRESSES: Please refer to Docket ID NRC-2015-0169 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0169. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced in this document
(if that document is available in ADAMS) is provided the first time
that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Jack Parrott, Division of
Decommissioning, Uranium Recovery, and Waste Programs, Office of
Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-00001; telephone: 301-415-6634; email:
Jack.Parrott@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC received, by letter dated April 24, 2015 (ADAMS Accession
No. ML15114A437), a request from GE Hitachi Nuclear Energy (GEH or
licensee) to approve a partial site release of a portion of its
Vallecitos Nuclear Center (VNC) site located at 6705 Vallecitos Road,
Sunol, California. The April 24, 2015 letter transmitted a report,
entitled ``Release of North Section of Vallecitos, California Site,''
prepared by GEH evaluating the proposed release (ADAMS Accession No.
ML15114A438). The VNC site contains four reactor units. Two of the four
units are licensed as power reactors under part 50, ``Domestic
Licensing of Production and Utilization Facilities,''
[[Page 29582]]
of title 10 of the Code of Federal Regulations (10 CFR part 50). These
two units are the Vallecitos Boiling Water Reactor (VBWR), NRC License
DPR-1, Docket 50-18, and the Empire State Atomic Development Agency
Vallecitos Experimental Superheat Reactor (EVESR), NRC License DR-10,
Docket 50-183. In accordance with 10 CFR 50.4(b)(8)-(9), the licensee
has certified, pursuant to 10 CFR 50.82(a)(1), that both units have
permanently ceased operation and that all nuclear fuel has been removed
from the respective reactor vessels of both units. These units are
presently in ``SAFSTOR'' \1\ status awaiting the termination of the
power reactor licenses.
---------------------------------------------------------------------------
\1\ SAFSTOR is the decommissioning method in which a nuclear
facility is placed and maintained in a condition that allows the
safe storage of radioactive components of the nuclear plant and
subsequent decontamination to levels that permit license
termination.
---------------------------------------------------------------------------
The third reactor unit is a shutdown testing facility (also called
a test reactor), the General Electric Test Reactor (GETR), NRC License
TR-1, Docket 50-70. The GETR has also been defueled and is in a SAFSTOR
status. The fourth reactor unit is a currently operating research
reactor, the Nuclear Test Reactor (NTR), NRC License R-33, Docket 50-
73. The NRC is considering a license amendment application for the NTR
that would modify the site description to remove the portion of the
site requested by the licensee for release (see the connected action
section of this notice).
Research reactors and testing facilities are non-power reactors
that are used for research and development, non-power commercial
activities, medical therapy, education and training. Non-power reactors
differ from power reactors in a number of significant ways. The purpose
of a power reactor is to generate steam, which can be used to generate
electricity; the purpose of a non-power reactor is to generate
radiation for purposes of experimentation, research and development,
commercial activities, medical therapy, education, and training.
Therefore, non-power reactors operate at significantly lower power than
power reactors and at lower temperatures and pressure. For these
reasons, non-power reactors have smaller safety and environmental
footprints than power reactors.
In accordance with 10 CFR 50.83, ``Release of part of a power
reactor facility or site for unrestricted use,'' the licensee requested
release from the NRC licenses, for unrestricted use, an approximately
247-hectare (610-acre) parcel in the northern section of the
approximately 647-hectare (1,600 acre) VNC site. The licensee is
declaring the parcel as a ``non-impacted area,'' which is defined in 10
CFR 50.2 to mean an area ``with no reasonable potential for residual
radioactivity in excess of natural background or fallout levels.'' If
approved, the 247-hectare (610-acre) parcel will no longer be
considered part of the licensed site and thus, no longer under NRC
jurisdiction. Once released, the 247-hectare (610-acre) parcel will be
available for unrestricted use. In this regard, GEH has indicated that
it intends to sell the 247-hectare (610-acre) parcel to a non-GEH
controlled entity.
The NRC is considering approval of the requested partial site
release for the VBWR and EVESR licenses at the VNC site. Therefore, in
compliance with the National Environmental Policy Act, as amended, 42
U.S.C. 4321 et seq. (NEPA), and its NEPA implementing regulations in 10
CFR part 51, the NRC has prepared this Environmental Assessment (EA).
The NRC is preparing this EA because the site was licensed prior to the
enactment of NEPA, and as such, a Final Environmental Statement (FES)
or an Environmental Impact Statement (EIS) were never prepared by the
NRC's predecessor agency, the Atomic Energy Commission (AEC), when the
site was first licensed. In accordance with 10 CFR 50.83(b)(5), if a
FES or EIS had been previously prepared, and if the licensee had
demonstrated that the environmental impacts associated with the
proposed partial site release were bounded by the FES or EIS, then the
preparation of an EA would not be necessary. As the EA preparation here
is due simply to the absence of a FES or an EIS, the preparation of
this EA should not be taken as precedent-setting for future NRC
approvals of 10 CFR 50.83 partial site releases of non-impacted land
where the NRC or the AEC had previously prepared a FES or an EIS and
the licensee has demonstrated that any environmental impacts associated
with the partial site release are bounded by that FES or EIS. Based on
the results of the EA that follows, the NRC has determined not to
prepare an EIS for the partial site release, and is issuing a finding
of no significant impact.
II. Environmental Assessment
Description of the Proposed Action
The proposed action would approve the release of a 247-hectare
(610-acre), non-impacted parcel, located in the northern section of the
approximately 647-hectare (1,600) acre VNC site, for unrestricted use.
Once released, the 247-hectare (610-acre) parcel would no longer be
part of the licensed site and thus, no longer under NRC
jurisdiction.\2\ Under the applicable NRC regulation, 10 CFR 50.83(b),
a licensee may submit a written request for the release of non-impacted
land if a license amendment is not otherwise required. Pursuant to 10
CFR 50.83(c), the NRC can approve such a partial release of non-
impacted land for unrestricted use in writing.
---------------------------------------------------------------------------
\2\ The NRC's organic statutory authority is the Atomic Energy
Act of 1954, as amended, 42 U.S.C. 2011 et seq. (AEA). Under the
AEA, the NRC's jurisdiction is limited to matters of radiological
health and safety, for both members of the public and occupational
workers, and of physical security for NRC licensed facilities and
radioactive materials possessed by NRC licensees. The NRC holds no
property interest in licensee owned or controlled lands nor does the
NRC have any land or natural resources management authority.
---------------------------------------------------------------------------
Need for the Proposed Action
The licensee has requested the release of the 247-hectare (610-
acre), non-impacted parcel as the licensee has no current or projected
operational need for this parcel at the licensed site. In fact, the
licensee has never used the 247-hectare (610-acre) parcel for licensed
operations. The licensee intends to sell the parcel to a non-GEH
controlled entity. Once the NRC has approved the release, the 247-
hectare (610-acre) parcel can be made available for another use.
VNC Site
VNC is located near the center of the Pleasanton quadrangle of
Alameda County, California. The site is east of San Francisco Bay,
approximately 56 air kilometers (35 air miles) east-southeast of San
Francisco and 32 air kilometers (20 air miles) north of San Jose. The
properties surrounding the site are primarily used for agriculture and
cattle raising, with some residences, which are mostly to the west of
the property. The nearest sizeable towns are Pleasanton located 6.6
kilometers (4.1 miles) to the north-northwest and Livermore located 10
kilometers (6.2 miles) to the northeast.
The site is on the north side of Vallecitos Road (State Route 84),
which is a two and four-lane paved highway. A Union Pacific railroad
line lies about three kilometers (two miles) west of the site. There is
light industrial activity within a 16-kilometer (10-mile) radius of the
plant. San Jose (32 kilometers (20 miles) south), Oakland (48
kilometers (30 miles) northwest) and San Francisco (56 kilometers (35
miles) northwest) are major industrial centers. The property boundary,
which has not changed since the original property purchase in 1956, is
fenced and posted ``No Trespassing.'' A security gate at the entrance
provides access control to the active area of the
[[Page 29583]]
site. The GEH evaluation report provides additional information about
the site (ADAMS Accession No. ML15114A438).
Safety Evaluation of the Proposed Action
The NRC staff evaluated the safety impacts of the proposed action
and concludes that the requirements of 10 CFR 50.83, 10 CFR 50.59, and
other applicable NRC regulations have been met (see ADAMS Accession No.
ML16007A348).
Environmental Impacts of the Proposed Action
The NRC staff evaluated the environmental impacts of the proposed
action and concludes that the release of the 247-hectare (610-acre)
parcel will not have any adverse environmental impacts. The 247-hectare
(610-acre) parcel is located in the northern portion of the site. The
parcel consists of undeveloped land and is currently used for cattle
grazing. The land has not been used for the processing or storage of
radioactive material. The properties surrounding the site are primarily
used for agriculture and cattle raising, with some scattered residences
mostly to the west of the property. The power reactors at the site have
permanently ceased operations and are being maintained in a possession-
only SAFSTOR status. The release of the 247-hectare (610-acre) parcel
will not impact the shutdown reactors. The licensee notes that the 247-
hectare (610-acre) parcel has never been used for licensed activity.
The 247-hectare (610-acre) parcel is topographically uphill from the
shutdown reactors so any surface or subsurface transport of liquid
effluents from the active area of the site could not have impacted the
parcel.
There is no evidence of any radiological impact on the 247-hectare
(610-acre) parcel. Samples taken in the area do not indicate impact
from licensed activities. The licensee measured direct dose in and
around the 247-hectare (610-acre) parcel and found that all
measurements were consistent with a background direct dose measurement
of approximately 0.7 mSieverts/yr (70 mRem/yr) (GEH Annual Report for
2014, ADAMS Accession No. ML15069A472). The NRC verified that the area
to be released was not radiologically impacted by licensed site
activities, as described in NRC inspection report 050-00018/15-001
(ADAMS Accession No. ML15303A361) dated October 30, 2015.
The NRC staff reviewed the request and concluded that the
environmental impacts associated with this request remain bounded by
the environmental impacts evaluated in the previously issued ``Final
Generic Environmental Impact Statement on Decommissioning of Nuclear
Facilities,'' NUREG-0586, Supplement 1, Volume 1 (https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0586/s1/v1/).
NUREG-0586 evaluated the environmental impacts of the decommissioning
of entire power reactor sites and facilities that have been impacted by
operations. The release of a part of a power reactor site that has been
demonstrated to not have been impacted by operations is within the
scope of the evaluation performed in NUREG-0586. The NRC staff
concludes that the proposed release of the 247-hectare (610-acre)
parcel is bounded by NUREG-0586.
The NRC has determined that the proposed release of the 247-hectare
(610-acre) parcel is wholly procedural and administrative in nature,
that the parcel is radiologically non-impacted, and that the licensee
has no safety, physical security, or emergency preparedness need to
retain the parcel. The environmental impacts associated with the
shutdown power reactors will not change as a result of the proposed
release of the 247-hectare (610-acre) parcel. The proposed release will
not result in public or environmental exposure to radioactive
contamination. There are no known records of any spills, leaks, or
uncontrolled release of radioactive material on the 247-hectare (610-
acre parcel). The 247-hectare (610-acre) parcel was not used for any
activities that could have contaminated the property. Therefore, there
are no significant radiological environmental impacts associated with
the proposed action.
With regard to potential non-radiological impacts, the proposed
release of the 247-hectare (610-acre) parcel from NRC jurisdiction does
not involve or authorize any construction activities, renovation of
buildings or structures, ground disturbing activities or other
alteration to land. The proposed release of the 247-hectare (610-acre)
parcel will not result in any change to current licensed activities on
that portion of the site that will remain under NRC jurisdiction and
therefore, will not result in any changes to the workforce or vehicular
traffic. Furthermore, as the NRC has determined that the proposed
release of the 247-hectare (610-acre) parcel is an administrative
action, it is not a type of activity that has the potential to cause
effects on historic properties or cultural resources, including
traditional cultural properties. Similarly, the NRC staff has
determined that the proposed release of the 247-hectare (610-acre)
parcel will have no effect on listed species or critical habitat. In
addition the proposed release of the 247-hectare (610-acre) parcel will
not result in any change to non-radiological plant effluents and thus,
will have no impact on either air or water quality. Therefore, there
are no significant non-radiological environmental impacts associated
with the proposed release of the 247-hectare (610-acre) parcel.
Accordingly, the NRC staff concludes that there are no significant
environmental impacts associated with the proposed action.
Connected Action
In accordance with 10 CFR 50.90, GEH has also requested the
amendment of its operating research reactor license for the NTR, NRC
License R-33, Docket 50-73 to reflect the release of the 247-hectare
(610-acre) parcel. Specifically, GEH has requested an amendment to the
license's site description section. GEH submitted that license
amendment request on February 16, 2015 (ADAMS Accession No.
ML15048A008; attachments to the February 16, 2015 request are at ADAMS
Accession Nos. ML15048A007, ML15048A009, ML15048A010, ML15048A011). The
NRC approval or disapproval of the proposed NTR license amendment
request will be handled administratively as a separate licensing
matter. However, the NRC considers that this EA encompasses and
otherwise bounds the environmental impacts of the proposed NTR license
amendment request. As discussed in Section I, ``Introduction,'' of this
notice, a non-power reactor has a much smaller safety and environmental
footprint than a power reactor. In this regard, the NTR operates at a
power level of 100 kilowatts-thermal. In contrast, the VBWR, the
largest of the decommissioned power reactors at the site, operated at a
much higher power level, 50 megawatts-thermal. As a further,
comparison, a typical commercial nuclear power reactor is rated at 3000
megawatts-thermal, and provides enough electricity to power 200,000
households in the peak summer months. Because of this large difference
in thermal power generated, the consequence of an accident at a non-
power reactor is much lower when compared to a commercial power
reactor. For this reason, the NTR research reactors' emergency planning
zones (EPZ) to protect the public from potential radiological accidents
is well within the owner-controlled areas--and is the boundary of the
room in which the reactor is housed. In accordance
[[Page 29584]]
with the guidance of ANSI/ANS 15.16-1982, ``Emergency Planning for
Research Reactors'', the operations boundary is defined as the EPZ
boundary for each reactor facility. For the NTR, the operations
boundary is defined by the portions of Building 105 occupied by NTR
facilities. The NRC staff has concluded that the environmental impacts
of reducing the licensed site would be similarly bounded and that there
would be no environmental impact associated with the continued
operation of the NTR in relation to the proposed release of the 247-
hectare (610-acre) parcel.
The shutdown, defueled testing facility, the GETR, NRC License TR-
1, Docket 50-70 is not the subject of any license amendment request.
The GETR is in SAFSTOR status. The GETR license does not contain a site
description and as such, there is no need to amend the GETR license to
reflect the release of the 247-hectare (610-acre) parcel. In any event,
the NRC staff considers this EA to encompass and bound any
environmental impacts resulting from the proposed release of the 247-
hectare (610-acre) parcel in relation to the ongoing shutdown, SAFSTOR
status of the GETR.
Environmental Impacts of the Alternatives to the Proposed Action
As an alternative to the proposed action, the NRC staff considered
denial of the proposed release of the 247-hectare (610-acre) parcel
(i.e., the ``no-action'' alternative). Denial of the request would
result in the 247-hectare (610-acre) parcel remaining part of the
licensed site and subject to NRC jurisdiction. As the licensee has no
need for the parcel, its current use as a site for cattle grazing would
most likely continue. As there is no policy or regulatory reason for
the NRC to require a licensee to retain land that is not radiologically
impacted and for which the licensee has no further operational need,
the no-action alternative is not further considered.
Conclusion
The NRC staff has concluded that the proposed action will not
significantly impact the quality of the human environment, and that the
proposed action is the preferred alternative.
Agencies and Persons Consulted
The NRC contacted the California Department of Public Health
concerning this request. There were no comments, concerns or objections
from the State official.
A public meeting to obtain comments on the release approval request
was announced on the NRC public meeting Web site on July 7, 2015 (ADAMS
Accession No. ML15188A344). A notice of GEH's request to release the
247-hectare (610-acre) parcel and the public meeting, including a
request for comment, was also published in the Tri-Valley Herald,
Livermore, CA on July 15, 2015 (ADAMS Accession No. ML15292A519). The
NRC staff published a notice of the receipt of GEH's request, including
a request for comment, in the Federal Register on July 20, 2015 (80 FR
42846). The NRC staff conducted the public meeting in Pleasanton, CA on
July 22, 2015. A summary of the public meeting, which includes copies
of the presentations made and a copy of the transcript of the meeting,
is available in ADAMS at Accession No. ML15260A199. No comments were
made on the Federal Rulemaking Web site, or were received by mail or
email, and all questions asked at the meeting were answered in the
meeting.
III. Finding of No Significant Impact
The NRC staff has prepared this EA as part of its review of the
proposed action. On the basis of this EA, the NRC finds that there are
no significant environmental impacts from the proposed action, and that
preparation of an environmental impact statement is not warranted.
Accordingly, the NRC has determined that a finding of no significant
impact (FONSI) is appropriate. In accordance with 10 CFR 51.32(a)(4),
this FONSI incorporates the EA set forth in this notice by reference.
Dated at Rockville, Maryland, this 4th day of May 2016.
For the Nuclear Regulatory Commission.
John R. Tappert,
Director, Division of Decommissioning, Uranium Recovery, and Waste
Programs, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 2016-11206 Filed 5-11-16; 8:45 am]
BILLING CODE 7590-01-P