Vineland Municipal Electric Utility v. Atlantic City Electric Company; Notice of Complaint, 28856 [2016-10906]
Download as PDF
asabaliauskas on DSK3SPTVN1PROD with NOTICES
28856
Federal Register / Vol. 81, No. 90 / Tuesday, May 10, 2016 / Notices
Comments Due: 5 p.m. ET 5/20/16.
Docket Numbers: ER16–1544–000.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Compliance Filing Revising Westar
Energy’s Formula Rate Template to be
effective 8/20/2014.
Filed Date: 4/29/16.
Accession Number: 20160429–5390.
Comments Due: 5 p.m. ET 5/20/16.
Docket Numbers: ER16–1545–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA No. 3045
and ICSA No. 3046, Queue No. Q65 to
be effective 6/27/2016.
Filed Date: 4/29/16.
Accession Number: 20160429–5424.
Comments Due: 5 p.m. ET 5/20/16.
Docket Numbers: ER16–1546–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Arkansas Electric Cooperative
Corporation Formula Rate to be effective
7/1/2016.
Filed Date: 4/29/16.
Accession Number: 20160429–5439.
Comments Due: 5 p.m. ET 5/20/16.
Docket Numbers: ER16–1547–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISAs 1867 & 4128,
Queues NQ#117 & NQ#124, per
Assignment to be effective 6/1/2015.
Filed Date: 4/29/16.
Accession Number: 20160429–5446.
Comments Due: 5 p.m. ET 5/20/16.
Docket Numbers: ER16–1548–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2016–04–29 Mesquite Solar 3 LGIA to
be effective 6/1/2016.
Filed Date: 4/29/16.
Accession Number: 20160429–5456.
Comments Due: 5 p.m. ET 5/20/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
VerDate Sep<11>2014
17:33 May 09, 2016
Jkt 238001
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–10865 Filed 5–9–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL16–60–000]
Vineland Municipal Electric Utility v.
Atlantic City Electric Company; Notice
of Complaint
Take notice that on April 26, 2016,
pursuant to sections 205, 206, 306, and
309 of the Federal Power Act (FPA) 1
and Rules 206 and 217 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure,2 Vineland Municipal
Electric Utility (Vineland or
Complainant) filed a formal complaint
against Atlantic City Electric Company
(ACE or Respondent). Vineland is
seeking an order granting full and
immediate refunds of all amounts paid
in violation of the Interconnection
Agreement and PJM Open Access
Transmission Tariff (PJM OATT).
Vineland is alleging ACE’s decision to,
without prior notice or approval from
Vineland, apply a Reconciliation Factor
to Vineland’s five coincident hourly
metered loads for the purpose of
calculating Vineland’s capacity
obligation, is in violation of the
Interconnection Agreement and the PJM
OATT, as more fully explained in the
complaint.
Complainant certifies that copies of
the Complaint were served on the
contacts for the Respondents.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
1 16
2 18
PO 00000
U.S.C. 824d, 824e, 825e, and 825h (2016).
CFR 385.206, 385.217 (2016).
Frm 00039
Fmt 4703
Sfmt 4703
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 16, 2016.
Dated: April 28, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–10906 Filed 5–9–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the PJM Interconnection, L.L.C. (PJM):
PJM Planning Committee
May 12, 2016, 9:30 a.m.–12:00 p.m.
(EST)
PJM Transmission Expansion Advisory
Committee
May 12, 2016, 11:00 a.m.–3:00 p.m.
(EST)
The above-referenced meetings will
be held at: PJM Conference and Training
Center, PJM Interconnection, 2750
Monroe Boulevard, Audubon, PA
19403.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.pjm.com.
E:\FR\FM\10MYN1.SGM
10MYN1
Agencies
[Federal Register Volume 81, Number 90 (Tuesday, May 10, 2016)]
[Notices]
[Page 28856]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-10906]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL16-60-000]
Vineland Municipal Electric Utility v. Atlantic City Electric
Company; Notice of Complaint
Take notice that on April 26, 2016, pursuant to sections 205, 206,
306, and 309 of the Federal Power Act (FPA) \1\ and Rules 206 and 217
of the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure,\2\ Vineland Municipal Electric Utility
(Vineland or Complainant) filed a formal complaint against Atlantic
City Electric Company (ACE or Respondent). Vineland is seeking an order
granting full and immediate refunds of all amounts paid in violation of
the Interconnection Agreement and PJM Open Access Transmission Tariff
(PJM OATT). Vineland is alleging ACE's decision to, without prior
notice or approval from Vineland, apply a Reconciliation Factor to
Vineland's five coincident hourly metered loads for the purpose of
calculating Vineland's capacity obligation, is in violation of the
Interconnection Agreement and the PJM OATT, as more fully explained in
the complaint.
---------------------------------------------------------------------------
\1\ 16 U.S.C. 824d, 824e, 825e, and 825h (2016).
\2\ 18 CFR 385.206, 385.217 (2016).
---------------------------------------------------------------------------
Complainant certifies that copies of the Complaint were served on
the contacts for the Respondents.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on May 16, 2016.
Dated: April 28, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-10906 Filed 5-9-16; 8:45 am]
BILLING CODE 6717-01-P