Combined Notice Of Filings # 2, 28861-28862 [2016-10867]

Download as PDF Federal Register / Vol. 81, No. 90 / Tuesday, May 10, 2016 / Notices Comments Due: 5 p.m. ET 5/18/16. Docket Numbers: ER16–1511–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) Rate Filing: 1st Quarter 2016 Updates to OA and RAA Member Lists to be effective 3/31/2016. Filed Date: 4/28/16. Accession Number: 20160428–5200. Comments Due: 5 p.m. ET 5/19/16. Take notice that the Commission received the following PURPA 210(m)(3) filings: asabaliauskas on DSK3SPTVN1PROD with NOTICES Docket Numbers: QM16–3–000. Applicants: Golden Spread Electric Cooperative, Inc. Description: Application Pursuant to Section 292.310(A) for Authorization to Terminate Mandatory Purchase Obligation in ERCOT of Golden Spread Electric Cooperative, Inc. Filed Date: 4/27/16. Accession Number: 20160427–5337. Comments Due: 5 p.m. ET 5/25/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 28, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–10902 Filed 5–9–16; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:33 May 09, 2016 Jkt 238001 The refund effective date in Docket No. EL16–56–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. DEPARTMENT OF ENERGY Docket Numbers: ER16–1510–000. Applicants: PPL Electric Utilities Corporation, PJM Interconnection, L.L.C. Description: Section 205(d) Rate Filing: PPL Electric submits revised Interconnection Agreement No. 746 to be effective 6/1/2016. Filed Date: 4/28/16. Accession Number: 20160428–5055. Comments Due: 5 p.m. ET 5/19/16. 28861 Federal Energy Regulatory Commission [Docket No. IN12–17–000] Total Gas & Power North America, Aaron Hall and Therese Tran f/k/a/ Nguyen; Notice of Designation of Commission Staff as Non-Decisional Dated: April 28, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–10905 Filed 5–9–16; 8:45 am] BILLING CODE 6717–01–P With respect to an order issued by the Commission on April 28, 2016 in the above-captioned docket,1 with the exceptions noted below, the staff of the Office of Enforcement are designated as non-decisional in deliberations by the Commission in this docket. Accordingly, pursuant to 18 CFR 385.2202 (2015), they will not serve as advisors to the Commission or take part in the Commission’s review of any offer of settlement. Likewise, as nondecisional staff, pursuant to 18 CFR 385.2201 (2015), they are prohibited from communicating with advisory staff concerning any deliberations in this docket. Exceptions to this designation as nondecisional are: Demetra Anas John Carnes Taylor Martin Lisa Owings Eric Primosch Felice Richter Emily Scruggs Derek Shiau Andrew Tamayo David Zlotnick Dated: April 28, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–10909 Filed 5–9–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL16–56–000] Consumer Energy Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date On April 28, 2016, the Commission issued an order in Docket No. EL16–56– 000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into the justness and reasonableness of Consumer Energy Company’s proposed rate reduction. Consumer Energy Company, 155 FERC ¶ 61, 104 (2016). 1 Total Gas & Power North America, Aaron Hall and Therese Tran f/k/a Nguyen, 155 FERC ¶ 61,105 (2016). PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice Of Filings # 2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3117–005. Applicants: Lea Power Partners, LLC. Description: Supplement to December 16, 2015 Triennial Market Power Analysis Filing for Southwest Power Pool region of Lea Power Partners, LLC. Filed Date: 4/20/16. Accession Number: 20160420–5197. Comments Due: 5 p.m. ET 5/11/16. Docket Numbers: ER13–2409–006; ER11–4501–011; ER12–2448–010; ER15– 2615–001; ER15–2620–001; ER14–2858– 005; ER12–979–010; ER11–4499–010; ER11–4498–010. Applicants: Buffalo Dunes Wind Project, LLC, Caney River Wind Project, LLC, Chisholm View Wind Project, LLC, Goodwell Wind Project, LLC, Little Elk Wind Project, LLC, Origin Wind Energy, LLC, Rocky Ridge Wind Project, LLC, Smoky Hills Wind Farm, LLC, Smoky Hills Wind Project II, LLC. Description: Supplement to December 18, 2015 Updated Market Power Analysis and Order No. 697 Compliance Filing of Buffalo Dunes Wind Project, LLC, et al. Filed Date: 4/15/16. Accession Number: 20160415–5339. Comments Due: 5 p.m. ET 5/6/16. Docket Numbers: ER16–1616–000. Applicants: Puget Sound Energy, Inc. Description: § 205(d) Rate Filing: Orcas NITSA S.A. No 792 and Orcas NOA S.A No 793 to be effective 5/1/ 2016. Filed Date: 5/3/16. Accession Number: 20160503–5124. Comments Due: 5 p.m. ET 5/24/16. Docket Numbers: ER16–1617–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of WMPA SA No. 3445, Queue No. X1–073 due to Breach to be effective 5/3/2016. E:\FR\FM\10MYN1.SGM 10MYN1 28862 Federal Register / Vol. 81, No. 90 / Tuesday, May 10, 2016 / Notices Filed Date: 5/3/16. Accession Number: 20160503–5142. Comments Due: 5 p.m. ET 5/24/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 3, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–10867 Filed 5–9–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Technical Conference Docket No. asabaliauskas on DSK3SPTVN1PROD with NOTICES Alabama Power Company ......................................................................................................................................................... Southern Power Company ......................................................................................................................................................... Mississippi Power Company ...................................................................................................................................................... Georgia Power Company .......................................................................................................................................................... Gulf Power Company ................................................................................................................................................................. Oleander Power Project, Limited Partnership ........................................................................................................................... Southern Company—Florida LLC .............................................................................................................................................. Southern Turner Cimarron I, LLC .............................................................................................................................................. Spectrum Nevada Solar, LLC .................................................................................................................................................... Campo Verde Solar, LLC .......................................................................................................................................................... Macho Springs Solar, LLC ......................................................................................................................................................... Take notice that the Federal Energy Regulatory Commission (Commission) will convene a staff-led technical conference in the above-referenced proceedings on May 23, 2016. The conference will begin at 9:00 a.m. (Eastern Time). The conference will be held in the Commission Meeting Room at the headquarters of the Commission, 888 First Street NE., Washington, DC 20426. The technical conference may be attended by one or more Commissioners. The purpose of this conference is to discuss select issues related to the market-based rate authorization of the above-captioned entities. The conference will explore potential ways to improve the energy auction currently serving as tailored mitigation or whether there are possible alternative forms of mitigation. Attached is an agenda for the conference. This technical conference is not intended to address other issues relevant to the above-captioned entities’ updated market power analysis.1 If attendees would like to file written responses to the questions in the attached agenda prior to the conference to facilitate the discussion, the Commission invites such written responses, with a deadline of May 18, 2016. The Commission will accept comments following the conference, with a deadline of June 6, 2016.2 1 Other issues will be addressed in a future Commission order. 2 The written responses and comments should be filed in the above-captioned dockets. VerDate Sep<11>2014 17:33 May 09, 2016 Jkt 238001 There is no fee for attendance. Inperson attendees should allow time to pass through building security procedures before the start time of the technical conference. Pre-registration is encouraged though not required. Attendees may register in advance at the following Web page: https:// www.ferc.gov/whats-new/registration/ 05-23-16-form.asp. The conference will be transcribed and webcast. Transcripts will be available immediately for a fee from Ace Reporting (202–347–3700). A link to the webcast of this event will be available in the Commission Calendar of Events at www.ferc.gov. The Capitol Connection provides technical support for the webcasts and offers the option of listening to the conferences via phonebridge for a fee. For additional information, visit www.CapitolConnection.org or call (703) 993–3100. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an email to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–208–8659 (TTY), or send a fax to 202–208–2106 with the required accommodations. For more information about this technical conference, please contact Lauren Campbell at Lauren.Campbell@ ferc.gov or (202) 502–6642. For information related to logistics, please contact Sarah McKinley at PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 ER10–2881–014 ER10–2882–014 ER10–2883–014 ER10–2884–014 ER10–2885–014 ER10–2641–014 ER10–2663–014 ER10–2886–014 ER13–1101–009 ER13–1541–008 ER14–787–002 EL15–39–000 Sarah.Mckinley@ferc.gov or (202) 502– 8368. Dated: May 4, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–10968 Filed 5–9–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–1489–000] North Star Gas Company LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of North Star Gas Company LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to E:\FR\FM\10MYN1.SGM 10MYN1

Agencies

[Federal Register Volume 81, Number 90 (Tuesday, May 10, 2016)]
[Notices]
[Pages 28861-28862]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-10867]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice Of Filings # 2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-3117-005.
    Applicants: Lea Power Partners, LLC.
    Description: Supplement to December 16, 2015 Triennial Market Power 
Analysis Filing for Southwest Power Pool region of Lea Power Partners, 
LLC.
    Filed Date: 4/20/16.
    Accession Number: 20160420-5197.
    Comments Due: 5 p.m. ET 5/11/16.

    Docket Numbers: ER13-2409-006; ER11-4501-011; ER12-2448-010; ER15-
2615-001; ER15-2620-001; ER14-2858-005; ER12-979-010; ER11-4499-010; 
ER11-4498-010.
    Applicants: Buffalo Dunes Wind Project, LLC, Caney River Wind 
Project, LLC, Chisholm View Wind Project, LLC, Goodwell Wind Project, 
LLC, Little Elk Wind Project, LLC, Origin Wind Energy, LLC, Rocky Ridge 
Wind Project, LLC, Smoky Hills Wind Farm, LLC, Smoky Hills Wind Project 
II, LLC.
    Description: Supplement to December 18, 2015 Updated Market Power 
Analysis and Order No. 697 Compliance Filing of Buffalo Dunes Wind 
Project, LLC, et al.
    Filed Date: 4/15/16.
    Accession Number: 20160415-5339.
    Comments Due: 5 p.m. ET 5/6/16.

    Docket Numbers: ER16-1616-000.
    Applicants: Puget Sound Energy, Inc.
    Description: Sec.  205(d) Rate Filing: Orcas NITSA S.A. No 792 and 
Orcas NOA S.A No 793 to be effective 5/1/2016.
    Filed Date: 5/3/16.
    Accession Number: 20160503-5124.
    Comments Due: 5 p.m. ET 5/24/16.

    Docket Numbers: ER16-1617-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of WMPA SA 
No. 3445, Queue No. X1-073 due to Breach to be effective 5/3/2016.

[[Page 28862]]

    Filed Date: 5/3/16.
    Accession Number: 20160503-5142.
    Comments Due: 5 p.m. ET 5/24/16.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 3, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-10867 Filed 5-9-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.