Transcontinental Gas Pipe Line Company, LLC; Notice of Revised Schedule for Environmental Review of the Virginia Southside Expansion Project II, 27425-27426 [2016-10670]
Download as PDF
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD16–11) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
1 18
CFR 385.2001–2005 (2015).
VerDate Sep<11>2014
17:20 May 05, 2016
Jkt 238001
27425
Dated: April 29, 2016.
Kimberly D. Bose,
Secretary.
Dated: April 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–10673 Filed 5–5–16; 8:45 am]
[FR Doc. 2016–10672 Filed 5–5–16; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. AD16–2–000]
[Docket No. EL16–54–000]
Review of Cost Submittals by Other
Federal Agencies for Administering
Part I of the Federal Power Act; Notice
Requesting Questions and Comments
on Fiscal Year 2016 Other Federal
Agency Cost Submissions
Lakewood Cogeneration, L.P.;
Essential Power Rock Springs, LLC;
Essential Power OPP, LLC; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
In its Order on Rehearing
Consolidating Administrative Annual
Charges Bill Appeals and Modifying
Annual Charges Billing Procedures, 109
FERC ¶ 61,040 (2004) (October 8 Order)
the Commission set forth an annual
process for Other Federal Agencies
(OFAs) to submit their costs related to
Administering Part I of the Federal
Power Act. Pursuant to the established
process, the Director of the Financial
Management Division, Office of the
Executive Director, on October 13, 2015,
issued a letter requesting the OFAs to
submit their costs by December 31, 2015
using the OFA Cost Submission Form.
Upon receipt of the agency
submissions, the Commission posted
the information in eLibrary, and issued,
on March 17, 2016, a notice announcing
the date for a technical conference to
review the submitted costs. On April 7,
2016, the Commission held the
technical conference. Technical
conference transcripts, submitted cost
forms, and detailed supporting
documents are all available for review
under Docket No. AD16–2. These
documents are accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and are available for
review in the Commission’s Public
Reference Room in Washington, DC.
Interested parties may file specific
questions and comments on the FY 2015
OFA cost submissions with the
Commission under Docket No. AD16–2,
no later than May 13, 2016. Once filed,
the Commission will forward the
questions and comments to the OFAs
for response.
Anyone with questions pertaining to
the technical conference or this notice
should contact Norman Richardson at
(202) 502–6219 (via email at
norman.richardson@ferc.gov) or Raven
A. Rodriguez at (202) 502–6276 (via
email at raven.rodriguez@ferc.gov).
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
On April 28, 2016, the Commission
issued an order in Docket No. EL16–54–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into the justness and reasonableness of
the individual reactive power rates of
Lakewood Cogeneration, L.P., Essential
Power Rock Springs, LLC, and Essential
Power OPP, LLC. Lakewood
Cogeneration, L.P., 155 FERC ¶ 61,109
(2016).
The refund effective date in Docket
No. EL16–54–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Dated: April 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–10676 Filed 5–5–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–118–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Revised
Schedule for Environmental Review of
the Virginia Southside Expansion
Project II
This notice identifies the Federal
Energy Regulatory Commission
(Commission or FERC) staff’s revised
schedule for the completion of the
environmental assessment (EA) for
Transcontinental Gas Pipe Line
Company, LLC’s Virginia Southside
Expansion Project II. The first notice of
schedule, issued on March 7, 2016,
identified April 29, 2016 as the EA
issuance date. Staff has revised the
schedule for issuance of the EA.
E:\FR\FM\06MYN1.SGM
06MYN1
27426
Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices
input will help the Commission staff
determine what issues they need to
Issuance of the EA .....
May 13, 2016 evaluate in the EA. To ensure that your
90-day Federal Authorcomments are timely and properly
ization Decision
recorded, please send your comments so
Deadline ..................
August 11, 2016 that the Commission receives them in
Washington, DC on or before June 2,
If a schedule change becomes
2016.
necessary, an additional notice will be
If you sent comments on this project
provided so that the relevant agencies
to the Commission before the opening of
are kept informed of the project’s
this docket on April 4, 2016, you will
progress.
need to file those comments in Docket
No. CP16–125–000 to ensure they are
Additional Information
considered as part of this proceeding.
In order to receive notification of the
This notice is being sent to the
issuance of the EA and to keep track of
Commission’s current environmental
all formal issuances and submittals in
mailing list for this project. State and
specific dockets, the Commission offers
local government representatives should
a free service called eSubscription
notify their constituents of this
(https://www.ferc.gov/docs-filing/
proposed project and encourage them to
esubscription.asp).
comment on their areas of concern.
Dated: April 29, 2016.
If you are a landowner receiving this
notice, a pipeline company
Kimberly D. Bose,
representative may contact you about
Secretary.
the acquisition of an easement to
[FR Doc. 2016–10670 Filed 5–5–16; 8:45 am]
construct, operate, and maintain the
BILLING CODE 6717–01–P
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
DEPARTMENT OF ENERGY
approves the project, that approval
Federal Energy Regulatory
conveys with it the right of eminent
Commission
domain. Therefore, if easement
negotiations fail to produce an
[Docket No. CP16–125–000]
agreement, the pipeline company could
National Fuel Gas Supply Corporation; initiate condemnation proceedings
where compensation would be
Notice of Intent To Prepare an
determined in accordance with state
Environmental Assessment for the
Proposed Line T2KNY Install, Line TNY law.
National Fuel provided landowners
Replacement, and Line KNY
Abandonment Project, and Request for with a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Comments on Environmental Issues
Facility On My Land? What Do I Need
The staff of the Federal Energy
To Know?’’ This fact sheet addresses a
Regulatory Commission (FERC or
number of typically asked questions,
Commission) will prepare an
including the use of eminent domain
environmental assessment (EA) that will and how to participate in the
discuss the environmental impacts of
Commission’s proceedings. It is also
the Line T2KNY Install, Line TNY
available for viewing on the FERC Web
Replacement, and Line KNY
site (www.ferc.gov).
Abandonment Project involving
Public Participation
construction and operation of facilities
by National Fuel Gas Supply
For your convenience, there are three
Corporation (National Fuel) in Erie
methods you can use to submit your
County, New York. The Commission
comments to the Commission. The
will use this EA in its decision-making
Commission encourages electronic filing
process to determine whether the
of comments and has expert staff
project is in the public convenience and available to assist you at (202) 502–8258
necessity.
or efiling@ferc.gov. Please carefully
This notice announces the opening of follow these instructions so that your
the scoping process the Commission
comments are properly recorded.
will use to gather input from the public
(1) You can file your comments
and interested agencies on the project.
electronically using the eComment
You can make a difference by providing feature on the Commission’s Web site
us with your specific comments or
(www.ferc.gov) under the link to
concerns about the project. Your
Documents and Filings. This is an easy
comments should focus on the potential method for submitting brief, text-only
environmental effects, reasonable
comments on a project;
alternatives, and measures to avoid or
(2) You can file your comments
lessen environmental impacts. Your
electronically by using the eFiling
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Schedule for Environmental Review
VerDate Sep<11>2014
17:20 May 05, 2016
Jkt 238001
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’ as
the filing type; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP16–125–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Room 1A, Washington, DC 20426.
Summary of the Proposed Project
National Fuel proposes to install
approximately 1.2 miles of new 20-inchdiameter natural gas pipeline (Line
T2KNY), replace approximately 6.7
miles of 20-inch-diameter bare steel
pipeline with 7.0 miles of 24-inchdiameter coated natural gas pipeline
(Line TNY), abandon approximately
14.9 miles of 20-inch-diameter bare steel
natural gas pipeline (Line KNY), make
modifications at two existing National
Fuel meter and regulator stations (North
Boston and East Eden), and make
modifications at National Fuel’s existing
Zoar Compressor Station in Erie County,
New York. The Line T2KNY Install,
Line TNY Replacement, and Line KNY
Abandonment Project would allow
National Fuel to cure operating
deficiencies on Line TNY and would
provide an additional 2,600 dekatherms
per day of new firm capacity which
would be offered in an open season.
This project would eliminate vintage
bare steel pipeline, replacing it with
modern, high strength, coated steel
pipeline, therefore increasing the overall
integrity and reliability of National
Fuel’s pipeline system.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 112 acres of land
for the aboveground facilities and the
pipeline. Following construction,
National Fuel would maintain about 52
acres for permanent operation of the
project’s facilities; the remaining
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
E:\FR\FM\06MYN1.SGM
06MYN1
Agencies
[Federal Register Volume 81, Number 88 (Friday, May 6, 2016)]
[Notices]
[Pages 27425-27426]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-10670]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-118-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of Revised
Schedule for Environmental Review of the Virginia Southside Expansion
Project II
This notice identifies the Federal Energy Regulatory Commission
(Commission or FERC) staff's revised schedule for the completion of the
environmental assessment (EA) for Transcontinental Gas Pipe Line
Company, LLC's Virginia Southside Expansion Project II. The first
notice of schedule, issued on March 7, 2016, identified April 29, 2016
as the EA issuance date. Staff has revised the schedule for issuance of
the EA.
[[Page 27426]]
Schedule for Environmental Review
------------------------------------------------------------------------
------------------------------------------------------------------------
Issuance of the EA................................. May 13, 2016
90-day Federal Authorization Decision Deadline..... August 11, 2016
------------------------------------------------------------------------
If a schedule change becomes necessary, an additional notice will
be provided so that the relevant agencies are kept informed of the
project's progress.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription (https://www.ferc.gov/docs-filing/esubscription.asp).
Dated: April 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-10670 Filed 5-5-16; 8:45 am]
BILLING CODE 6717-01-P