Proposed Information Collection Request; Comment Request, 26546-26551 [2016-10393]
Download as PDF
26546
Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–10624–025.
All filings with the Commission must
bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by June 25, 2016.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
meeting will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or EIS is issued by the Commission.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Daytime Scoping Meeting
Date and Time: Thursday, May 12,
2016 at 9:00 a.m.
Location: Four Flags Area Chamber of
Commerce, 321 E. Main Street, Niles,
Michigan 49120.
Phone Number: (269) 683–3720.
Evening Scoping Meeting
Date and Time: Wednesday, May 11,
2016 at 6:30 p.m.
VerDate Sep<11>2014
18:53 May 02, 2016
Jkt 238001
Location: Four Flags Area Chamber of
Commerce, 321 E. Main Street, Niles,
Michigan 49120.
Phone Number: (269) 683–3720.
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Wednesday, May 11, 2016,
starting at 2:00 p.m. All participants
should meet at French Paper Dam,
located at 100 French Street, Niles,
Michigan 49120. All participants are
responsible for their own transportation.
Please notify Shane Fenske at (269)
683–1100, or fenske@frenchpaper.com
by May 6, 2016, if you plan to attend the
environmental site review.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in
paragraph n of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Dated: April 26, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–10247 Filed 5–2–16; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9946–03–OECA]
Proposed Information Collection
Request; Comment Request
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency is planning to submit the below
listed information collection requests
(ICR) (See item specific ICR title, EPA
ICR Number and OMB Control Number
provided in the text) to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act (44 U.S.C.
3501 et seq.). Before doing so, EPA is
soliciting public comments on specific
aspects of the proposed information
collection as described below. These are
proposed extensions of the currently
approved ICRs. An Agency may not
conduct or sponsor and a person is not
required to respond to a collection of
information unless it displays a
currently valid OMB control number.
DATES: Comments must be submitted on
or before July 5, 2016.
ADDRESSES: Submit your comments,
referencing the Docket ID numbers
provided for each item in the text,
online using www.regulations.gov (our
preferred method), by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW.,
Washington, DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington,
DC 20460; telephone number: (202)
564–2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUMMARY:
E:\FR\FM\03MYN1.SGM
03MYN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
be collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
EPA West, Room 3334, 1301
Constitution Ave. NW., Washington,
DC. The telephone number for the
Docket Center is 202–566–1744. For
additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA is soliciting comments
and information to enable it to: (i)
Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (ii) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(iii) enhance the quality, utility, and
clarity of the information to be
collected; and (iv) minimize the burden
of the collection of information on those
who are to respond, including through
the use of appropriate automated
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses. Burden is defined at 5 CFR
1320.03(b). EPA will consider the
comments received and amend the ICR
as appropriate. The final ICR package
will then be submitted to OMB for
review and approval. At that time, EPA
will issue another Federal Register
notice to announce the submission of
the ICR to OMB and the opportunity to
submit additional comments to OMB.
General Abstract: For all the listed
ICRs in this notice, owners and
operators of affected facilities are
required to comply with reporting and
record keeping requirements for the
general provisions of 40 CFR part 60,
subpart A or Part 63, Subpart A, as well
as the applicable specific standards.
This includes submitting initial
notifications, performance tests and
periodic reports and results, and
maintaining records of the occurrence
and duration of any startup, shutdown,
or malfunction in the operation of an
affected facility, or any period during
which the monitoring system is
inoperative. These reports are used by
EPA to determine compliance with the
standards.
(1) Docket ID Number: EPA–HQ–
OECA–2013–0336; Title: NESHAP for
VerDate Sep<11>2014
18:53 May 02, 2016
Jkt 238001
Off-Site Waste and Recovery Operations
(40 CFR part 63, subpart DD); EPA ICR
Number 1717.10, OMB Control Number
2060–0313; Expiration Date: October 31,
2016.
Respondents: Waste management and
recovery facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
DD).
Estimated number of respondents:
236 (total).
Frequency of response: Initially,
occasionally and semiannually.
Estimated annual burden: 179,000
hours.
Estimated annual cost: $17,500,000,
includes $5,810 annualized capital or
operation & maintenance (O&M) costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(2) Docket ID Number: EPA–HQ–
OECA–2012–0679; Title: NESHAP for
Petroleum Refineries: Catalytic Cracking
Units, Reforming and Sulfur Units (40
CFR part 63, subpart UUU); EPA ICR
Number 1844.07, OMB Control Number
2060–0554; Expiration Date: October 31,
2016.
Respondents: Petroleum refineries
with catalytic cracking units, catalytic
reforming units and/or sulfur recovery
units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
UUU).
Estimated number of respondents:
123 (total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 10,200
hours.
Estimated annual cost: $9,400,000,
includes $8,400,000 annualized capital
or O&M costs.
Changes in Estimates: There is an
expected increase in burden hours due
to expected modification of existing
facilities.
(3) Docket ID Number: EPA–HQ–
OECA–2013–0338; Title: NESHAP for
the Manufacture of Amino/Phenolic
Resins (40 CFR part 63, subpart OOO);
EPA ICR Number 1869.08, OMB Control
Number 2060–0434; Expiration Date:
October 31, 2016.
Respondents: Facilities that
manufacture amino/phenolic resins.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
OOO).
Estimated number of respondents: 37
(total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 22,400
hours.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
26547
Estimated annual cost: $2,200,000,
includes $14,800 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(4) Docket ID Number: EPA–HQ–
OECA–2013–0341; Title: NESHAP for
Plywood and Composite Products (40
CFR parts 63, Subpart DDDD); EPA ICR
Number 1984.06, OMB Control Number
2060–0552; Expiration Date: October 31,
2016.
Respondents: Plywood and composite
wood products (PCWP) facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
DDDD).
Estimated number of respondents:
228 (total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 11,700
hours.
Estimated annual cost: $1,160,000,
includes $16,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(5) Docket ID Number: EPA–HQ–
OECA–2013–0318; Title: NSPS for
Magnetic Tape Coating Facilities (40
CFR part 60, subpart SSS); EPA ICR
Number 1135.12, OMB Control Number
2060–0171; Expiration Date: November
30, 2016.
Respondents: Magnetic tape coating
facilities constructed or modified after
January 22, 1986.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
SSS).
Estimated number of respondents: 6
(total).
Frequency of response: Initially,
occasionally and semiannually.
Estimated annual burden: 2,020
hours.
Estimated annual cost: $283,000,
includes $86,400 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(6) Docket ID Number: EPA–HQ–
OECA–2013–0334; Title: NSPS for
Secondary Brass and Bronze
Production, Primary Copper Smelters,
Primary Zinc Smelters, Primary Lead
Smelters, Primary Aluminum Reduction
Plants, and Ferroalloy Production
Facilities (40 CFR part 60, subparts M,
P, Q, R, S, Z); EPA ICR Number 1604.11,
OMB Control Number 2060–0110;
Expiration Date: November 30, 2016.
Respondents: Secondary brass or
bronze production facilities; primary
E:\FR\FM\03MYN1.SGM
03MYN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
26548
Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices
copper, primary zinc, and primary lead
facilities; primary aluminum reduction
facilities; and ferroalloy production
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts M,
P, Q, R, S, and Z).
Estimated number of respondents: 19
(total).
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 4,960
hours.
Estimated annual cost: $612,000
includes $127,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(7) Docket ID Number: EPA–HQ–
OECA–2013–0339; Title: NESHAP for
Boat Manufacturing (40 CFR part 63,
subpart VVVV); EPA ICR Number
1966.06, OMB Control Number 2060–
0546; Expiration Date: November 30,
2016.
Respondents: Boat manufacturing
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
VVVV);
Estimated number of respondents:
144 (total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 23,500
hours.
Estimated annual cost: $2,300,000,
includes $800 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(8) Docket ID Number: EPA–HQ–
OECA–2013–0345; Title: NESHAP for
Metal Can Manufacturing Surface
Coating (40 CFR part 63, subpart
KKKK); EPA ICR Number 2079.06, OMB
Control Number 2060–0541; Expiration
Date: November 30, 2016.
Respondents: Metal can
manufacturing facilities that use 1,500
gallons or more of surface coatings.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
KKKK).
Estimated number of respondents: 5
(total).
Frequency of response: Initially,
occasionally and semiannually.
Estimated annual burden: 1,940
hours.
Estimated annual cost: $196,000,
includes $6,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
VerDate Sep<11>2014
18:53 May 02, 2016
Jkt 238001
(9) Docket ID Number: EPA–HQ–
OECA–2013–0313; Title: NSPS for
Stationary Gas Turbines (40 CFR part
60, subpart GG); EPA ICR Number
1071.12, OMB Control Number 2060–
0028; Expiration Date: December 31,
2016.
Respondents: Stationary gas turbines.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
GG).
Estimated number of respondents:
535 (total).
Frequency of response: Initially and
semiannually.
Estimated annual burden: 68,400
hours.
Estimated annual cost: $6,700,000,
includes $0 annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(10) Docket ID Number: EPA–HQ–
OECA–2013–0333; Title: Standards of
Performance for Air Emission Standards
for Tanks, Surface Impoundments and
Containers (40 CFR part 264, subpart CC
and 40 CFR part 265, subpart CC); EPA
ICR Number 1593.10, OMB Control
Number 2060–0318; Expiration Date:
December 31, 2016.
Respondents: Facilities that treat,
store, or dispose of hazardous wastes in
tanks, surface impoundments, and
containers.
Respondent’s obligation to respond:
Mandatory (40 CFR part 264, subpart CC
and 40 CFR part 265, subpart CC).
Estimated number of respondents:
6,200 (total).
Frequency of response: Occasionally.
Estimated annual burden: 712,000
hours.
Estimated annual cost: $82,100,000,
includes $12,400,000 annualized capital
or O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(11) Docket ID Number: EPA–HQ–
OECA–2013–0335; Title: NESHAP for
Aerospace Manufacturing and Rework
Facilities (40 CFR part 63, subpart GG);
EPA ICR Number 1687.10, OMB Control
Number 2060–0314; Expiration Date:
December 31, 2016.
Respondents: Aerospace
manufacturing and rework facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
GG).
Estimated number of respondents:
136 (total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 141,000
hours.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Estimated annual cost: $13,900,000,
includes $136,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(12) Docket ID Number: EPA–HQ–
OECA–2013–0340; Title: NESHAP for
Stationary Reciprocating Internal
Combustion Engines (40 CFR part 63,
subpart ZZZZ); EPA ICR Number
1975.10, OMB Control Number 2060–
0548; Expiration Date: December 31,
2016.
Respondents: Stationary reciprocating
internal combustion engines.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
ZZZZ).
Estimated number of respondents:
903,000 (total).
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 3,430,000
hours.
Estimated annual cost: $425,000,000,
includes $27,900,000 annualized capital
or O&M costs.
Changes in Estimates: There is an
expected increase in burden hours due
to an increase in the respondent
universe.
(13) Docket ID Number: EPA–HQ–
OECA–2013–0346; Title: NESHAP for
Acrylic/Modacrylic Fibers Prod., Carbon
Black Prod., Chemical Mfg: Chromium
Compounds, Flexible Polyurethane
Foam Production/Fabrication, Lead
Acid Battery Mfg, Wood Preserving (40
CFR part 63, subparts LLLLLL,
MMMMMM, NNNNNN, OOOOOO,
PPPPPP, and QQQQQQ); EPA ICR
Number 2256.05, OMB Control Number
2060–0598; Expiration Date: December
31, 2016.
Respondents: Acrylic or modacrylic
fibers production plants, carbon black
production plants, chemical
manufacturing that use chromite ore as
the basic feedstock, flexible
polyurethane foam manufacturing or
fabrication facilities, lead acid battery
manufacturing facilities, and wood
preserving facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subparts
LLLLLL, MMMMMM, NNNNNN,
OOOOOO, PPPPPP, and QQQQQQ).
Estimated number of respondents:
956 (total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 3,220
hours.
Estimated annual cost: $315,000,
includes $0 annualized capital or O&M
costs.
E:\FR\FM\03MYN1.SGM
03MYN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(14) Docket ID Number: EPA–HQ–
OECA–2013–0301; Title: NESHAP for
Beryllium (40 CFR part 61, subpart C);
EPA ICR Number 0193.12, OMB Control
Number 2060–0092; Expiration Date:
January 31, 2017.
Respondents: Facilities processing
beryllium and its derivatives.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart C).
Estimated number of respondents: 33
(total).
Frequency of response: Initially,
occasionally, and monthly.
Estimated annual burden: 2,630
hours.
Estimated annual cost: $292,000,
includes $35,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(15) Docket ID Number: EPA–HQ–
OECA–2013–0310; Title: NSPS for
Sewage Sludge Treatment Plants (40
CFR part 60, subpart O); EPA ICR
Number 1063.13, OMB Control Number
2060–0035; Expiration Date: January 31,
2017.
Respondents: Sewage sludge
treatment plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart O).
Estimated number of respondents:
112 (total).
Frequency of response: Initially,
occasionally and semiannually.
Estimated annual burden: 12,500.
Estimated annual cost: $5,180,000,
includes $3,960,000 annualized capital
or O&M costs.
Changes in Estimates: There is an
increase in burden due to expected
construction of new facilities or
modifications of existing facilities.
(16) Docket ID Number: EPA–HQ–
OECA–2013–0314; Title: NSPS for
Phosphate Rock Plants (40 CFR part 60,
subpart NN); EPA ICR Number 1078.11,
OMB Control Number 2060–0111;
Expiration Date: January 31, 2017.
Respondents: Phosphate rock
facilities that commenced construction
or reconstruction after September 21,
1979.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
NN).
Estimated number of respondents: 14
(total).
Frequency of response: Initially,
occasionally and semiannually.
Estimated annual burden: 1,720
hours.
VerDate Sep<11>2014
18:53 May 02, 2016
Jkt 238001
Estimated annual cost: $302,000,
includes $133,000 annualized capital or
O&M costs.
Changes in Estimates: There is an
expected increase in burden due to an
increase in the number of new or
modified sources.
(17) Docket ID Number: EPA–HQ–
OECA–2013–0329; Title: NSPS for
Rubber Tire Manufacturing (40 CFR part
60, subpart BBB); EPA ICR Number
1158.12, OMB Control Number 2060–
0156; Expiration Date: January 31, 2017.
Respondents: Rubber tire
manufacturing plants that commenced
construction or modification after
January 20, 1983.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
BBB).
Estimated number of respondents: 41
(total).
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 17,700
hours.
Estimated annual cost: $1,750,000,
includes $16,400 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(18) Docket ID Number: EPA–HQ–
OECA–2013–0331; Title: NSPS for New
Residential Wood Heaters (40 CFR part
60, subpart AAA); EPA ICR Number
1176.12, OMB Control Number 2060–
0161; Expiration Date: January 31, 2017.
Respondents: Manufacturers, retailers,
and certification laboratories of new
residential wood heaters.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
AAA).
Estimated number of respondents:
947 (total).
Frequency of response: Initially and
occasionally.
Estimated annual burden: 11,700
hours.
Estimated annual cost: $2,890,000,
includes $1,740,000 annualized capital
or O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(19) Docket ID Number: EPA–HQ–
OECA–2013–0342; Title: NESHAP for
Lime Manufacturing (40 CFR part 63,
subpart AAAAA); EPA ICR Number
2072.06, OMB Control Number 2060–
0544; Expiration Date: January 31, 2017.
Respondents: Lime manufacturing
plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
AAAAA).
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
26549
Estimated number of respondents: 65
(total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 15,400
hours.
Estimated annual cost: $1,820,000,
includes $312,000 annualized capital or
O&M costs.
Changes in Estimates: There is an
increase in burden hours from the
previous ICR due to an expected
increase in the number of respondents.
(20) Docket ID Number: EPA–HQ–
OECA–2013–0302; Title: NSPS for
Graphic Arts Industry (40 CFR part 60,
subpart QQ); EPA ICR Number 0657.12,
OMB Control Number 2060–0105;
Expiration Date: February 28, 2017.
Respondents: Graphics arts facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
QQ).
Estimated number of respondents: 20
(total).
Frequency of response: Initially,
occasionally and semiannually.
Estimated annual burden: 1,800
hours.
Estimated annual cost: $176,000,
includes $0 annualized capital or O&M
costs.
Changes in Estimates: There is an
increase in burden hours from the
previous ICR due to an expected
increase in respondent universe.
(21) Docket ID Number: EPA–HQ–
OECA–2013–0325; Title: NESHAP for
Benzene Emission from Benzene Storage
Vessels and Coke-By-Product Recovery
Plants (40 CFR part 61, subparts L and
Y); EPA ICR Number 1080.15, OMB
Control Number 2060–0185; Expiration
Date: March 31, 2017.
Respondents: Owners or operators of
benzene storage vessels and coke byproduct recovery plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subparts L
and Y).
Estimated number of respondents: 21
(total).
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 3,190
hours.
Estimated annual cost: $312,000,
includes $0 annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(22) Docket ID Number: EPA–HQ–
OECA–2013–0319; Title: NSPS for VOC
Emissions from Petroleum Refinery
Wastewater Systems (40 CFR part 60,
subpart QQQ); EPA ICR Number
E:\FR\FM\03MYN1.SGM
03MYN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
26550
Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices
1136.12, OMB Control Number 2060–
0172; Expiration Date: March 31, 2017.
Respondents: Petroleum refineries
with wastewater systems.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
QQQ).
Estimated number of respondents:
135 (total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 9,240
hours.
Estimated annual cost: $922,000,
includes $17,600 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(23) Docket ID Number: EPA–HQ–
OECA–2013–0353; Title: NSPS for
Stationary Spark Ignition Internal
Combustion Engines (40 CFR part 60,
subpart JJJJ); EPA ICR Number 2227.05,
OMB Control Number 2060–0610;
Expiration Date: March 31, 2017.
Respondents: Stationary spark
ignition internal combustion engines.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart JJJJ).
Estimated number of respondents:
17,600 (total).
Frequency of response: Initially and
annually.
Estimated annual burden: 23,300
hours.
Estimated annual cost: $4,640,000,
includes $2,360,000 annualized capital
or O&M costs.
Changes in Estimates: There is an
expected increase in burden hours from
the previous ICR due to growth in the
respondent universe.
(24) Docket ID Number: EPA–HQ–
OECA–2013–0321; Title: NSPS for
Sewage Sludge Incinerators (40 CFR
part 60, subpart LLLL); EPA ICR
Number 2369.04, OMB Control Number
2060–0658; Expiration Date: March 31,
2017.
Respondents: New or modified
sewage sludge incinerators.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
LLLL).
Estimated number of respondents: 4
(total).
Frequency of response: Initially,
occasionally, and annually.
Estimated annual burden: 798 hours.
Estimated annual cost: $448,000,
includes $370,000 annualized capital or
O&M costs.
Changes in Estimates: There is an
expected increase in burden hours from
the previous ICR due to growth in the
respondent universe.
(25) Docket ID Number: EPA–HQ–
OECA–2013–0317; Title: NESHAP for
VerDate Sep<11>2014
18:53 May 02, 2016
Jkt 238001
Gold Mine Ore Processing (40 CFR part
63, subpart EEEEEEE); EPA ICR Number
2383.04, OMB Control Number 2060–
0659; Expiration Date: March 31, 2017.
Respondents: Gold mine ore
processing and production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
EEEEEEE).
Estimated number of respondents: 21
(total).
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 2,360
hours.
Estimated annual cost: $445,000,
includes $227,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(26) Docket ID Number: EPA–HQ–
OECA–2016–0009; Title: NESHAP for
Group IV Polymers and Resins (40 CFR
part 63, subpart JJJ); EPA ICR Number
2457.03, OMB Control Number 2060–
0682; Expiration Date: March 31, 2017.
Respondents: Thermoplastic resin
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart JJJ).
Estimated number of respondents: 31
(total).
Frequency of response: Semiannually.
Estimated annual burden: 459 hours.
Estimated annual cost: $1,110,000,
includes $542,000 annualized capital or
O&M costs.
(27) Docket ID Number: EPA–HQ–
OECA–2014–0063; Title: NESHAP for
Polyether Polyols Production (40 CFR
part 63, subpart PPP); EPA ICR Number
1811.10, OMB Control Number 2060–
0415; Expiration Date: May 31, 2017.
Respondents: Polyether polyols
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
PPP).
Estimated number of respondents: 23
(total).
Frequency of response: Occasionally
and semiannually.
Estimated annual burden: 3,700
hours.
Estimated annual cost: $433,000,
includes $226,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(28) Docket ID Number: EPA–HQ–
OECA–2013–0303; Title: NSPS for
Equipment Leaks of VOC in Petroleum
Refineries (40 CFR part 60, subparts
GGG and GGGa); EPA ICR Number
0983.15, OMB Control Number 2060–
0067; Expiration Date: June 30, 2017.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Respondents: Petroleum refineries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts
GGG and GGGa).
Estimated number of respondents:
130 (total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 24,900
hours.
Estimated annual cost: $2,430,000,
includes $0 annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
(29) Docket ID Number: EPA–HQ–
OECA–2013–0350; Title: The
Consolidated Air Rule (CAR) for the
Synthetic Organic Chemical
Manufacturing Industry (SOCMI); EPA
ICR Number 1854.10, OMB Control
Number 2060–0443; Expiration Date:
June 30, 2017.
Respondents: Synthetic organic
chemical manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 65).
Estimated number of respondents:
4,620 (total).
Frequency of response: Initially,
occasionally, semiannually and
annually.
Estimated annual burden: 2,130,000
hours.
Estimated annual cost: $309,000,000,
includes $101,000,000 annualized
capital or O&M costs.
Changes in Estimates: There is an
expected increase in burden hours from
the previous ICR due to growth in the
respondent universe.
(30) Docket ID Number: EPA–HQ–
OECA–2013–0315; Title: NSPS for
Commercial and Industrial Solid Waste
Incineration (CISWI) Units (40 CFR part
60, subpart CCCC); EPA ICR Number
2384.04, OMB Control Number 2060–
0662; Expiration Date: June 30, 2017.
Respondents: Commercial and
industrial solid waste incineration
units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
CCCC).
Estimated number of respondents: 4
(total).
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 1,040
hours.
Estimated annual cost: $451,000,
includes $350,000 annualized capital or
O&M costs.
Changes in Estimates: There is an
expected increase in burden hours from
the previous ICR due to growth in the
respondent universe.
E:\FR\FM\03MYN1.SGM
03MYN1
Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices
(31) Docket ID Number: EPA–HQ–
OECA–2014–0034; Title: NSPS for Kraft
Pulp Mills (40 CFR part 60, subpart BB);
EPA ICR Number 2485.03, OMB Control
Number 2060–0690; Expiration Date:
June 30, 2017.
Respondents: Kraft pulp mills.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart BB).
Estimated number of respondents: 4
(total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 1,910
hours.
Estimated annual cost: $753,000,
includes $567,000 annualized capital or
O&M costs.
Changes in Estimates: There is an
expected increase in burden hours from
the previous ICR due to growth in the
respondent universe.
(32) Docket ID Number: EPA–HQ–
OECA–2013–0316; Title: NSPS for
Onshore Natural Gas Processing Plants
(40 CFR part 60, subparts KKK and
LLL); EPA ICR Number 1086.12, OMB
Control Number 2060–0120; Expiration
Date: August 31, 2017.
Respondents: Onshore natural gas
processing plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts
KKK and LLL).
Estimated number of respondents:
577 (total).
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 122,000
hours.
Estimated annual cost: $12,000,000,
includes $68,400 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden hours from the
previous ICR.
Dated: April 18, 2016.
Edward J. Messina,
Director, Monitoring, Assistance and Media
Programs Division.
[FR Doc. 2016–10393 Filed 5–2–16; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
asabaliauskas on DSK3SPTVN1PROD with NOTICES
[FRL–9945–99–OA]
Notification of a Public Meeting and
Public Teleconference of the Chartered
Science Advisory Board
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) Science Advisory Board
SUMMARY:
VerDate Sep<11>2014
18:53 May 02, 2016
Jkt 238001
(SAB) Staff Office announces a public
meeting and a public teleconference of
the chartered SAB to conduct a quality
review of a draft SAB report on an
assessment of potential impacts of
hydraulic fracturing on drinking water
resources and to receive briefings on
topics of interest for possible future SAB
advice.
DATES: The public meeting will be held
on Tuesday, June 14, 2016, from 8:30
a.m. to 5:00 p.m. and Wednesday, June
15, 2016, from 8:30 a.m. to 1:00 p.m.
The teleconference, if needed to
accommodate registered public
speakers, will be held on June 8, 2016
from 2:00 p.m. to 5:00 p.m. (Eastern
Time).
ADDRESSES: The meeting will be held at
the Westin Alexandria, 400 Courthouse
Square, Alexandria, VA 22314.
FOR FURTHER INFORMATION CONTACT: Any
member of the public who wants further
information concerning the meeting
may contact Mr. Thomas Carpenter,
Designated Federal Officer (DFO), EPA
Science Advisory Board (1400R), U.S.
Environmental Protection Agency, 1200
Pennsylvania Avenue NW., Washington,
DC 20460; via telephone/voice mail
(202) 564–4885, or email at
carpenter.thomas@epa.gov. General
information concerning the SAB can be
found on the EPA Web site at https://
www.epa.gov/sab.
Technical Contact for EPA’s Draft
Report: Any technical questions
concerning EPA’s draft report,
Assessment of the Potential Impacts of
Hydraulic Fracturing for Oil and Gas on
Drinking Water Resources (May 2015
External Review Draft, EPA/600/R–15/
047), should be directed to Dr. Jeffrey
Frithsen, National Center for
Environmental Assessment, Office of
Research and Development, U.S. EPA,
1200 Pennsylvania Avenue NW., Mail
Code 8601P, Washington, DC 20460,
telephone (703) 347–8623 or via email
at frithsen.jeff@epa.gov.
SUPPLEMENTARY INFORMATION:
Background: The SAB was
established pursuant to the
Environmental Research, Development,
and Demonstration Authorization Act
(ERDDAA), codified at 42 U.S.C. 4365,
to provide independent scientific and
technical advice to the Administrator on
the scientific and technical basis for
Agency positions and regulations. The
SAB is a Federal Advisory Committee
chartered under the Federal Advisory
Committee Act (FACA), 5 U.S.C., App.
2. The SAB will comply with the
provisions of FACA and all appropriate
SAB Staff Office procedural policies.
Pursuant to FACA and EPA policy,
notice is hereby given that the SAB will
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
26551
hold a public meeting to discuss and
deliberate on the topics below.
(1) Quality review of the SAB Draft 4–
26–16 Review of EPA’s draft Assessment
of the Potential Impacts of Hydraulic
Fracturing for Oil and Gas on Drinking
Water Resources. The EPA’s Office of
Research and Development (ORD)
requested the SAB to conduct a peer
review of the draft assessment report
concerning the relationship between
hydraulic fracturing and drinking water
in the United States. The purpose of the
report, Assessment of the Potential
Impacts of Hydraulic Fracturing for Oil
and Gas on Drinking Water Resources
(May 2015 External Review Draft, EPA/
600/R–15/047), is to synthesize
available scientific literature and data to
assess the potential for hydraulic
fracturing for oil and gas to impact the
quality or quantity of drinking water
resources, and identify factors affecting
the frequency or severity of any
potential impacts.
The SAB Hydraulic Fracturing
Research Advisory Panel conducted a
peer review of the EPA draft assessment
and the chartered SAB will conduct a
quality review of the panel’s draft
report. Quality review is a key function
of the chartered SAB. Draft reports
prepared by SAB committees, panels, or
work groups must be reviewed and
approved by the chartered SAB before
transmittal to the EPA Administrator.
Consistent with FACA, the chartered
SAB makes a determination in a public
meeting about each draft report and
determines whether the report is ready
to be transmitted to the EPA
Administrator.
Background on the current advisory
activity, Assessment of the Potential
Impacts of Hydraulic Fracturing for Oil
and Gas on Drinking Water Resources,
can be found on the SAB Web site at
https://yosemite.epa.gov/sab/
sabproduct.nsf//LookupWebProjects
CurrentBOARD/F7A9DB9ABBAC0
15785257E540052DD54?Open
Document.
(2) Briefings from representatives of
the EPA and other EPA advisory
Committees on topics of interest for
possible future SAB advice.
If the SAB Staff Office determines that
there will be insufficient time during
the June 14–15, 2016 meeting to
accommodate the members of the public
who registered in advance to provide
oral public comments, the
teleconference will be held on June 8,
2016 to provide additional time for oral
public comments.
Availability of Meeting Materials: A
meeting agenda and other materials for
the meeting will be placed on the SAB
Web site at https://epa.gov/sab.
E:\FR\FM\03MYN1.SGM
03MYN1
Agencies
[Federal Register Volume 81, Number 85 (Tuesday, May 3, 2016)]
[Notices]
[Pages 26546-26551]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-10393]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-9946-03-OECA]
Proposed Information Collection Request; Comment Request
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency is planning to submit the
below listed information collection requests (ICR) (See item specific
ICR title, EPA ICR Number and OMB Control Number provided in the text)
to the Office of Management and Budget (OMB) for review and approval in
accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).
Before doing so, EPA is soliciting public comments on specific aspects
of the proposed information collection as described below. These are
proposed extensions of the currently approved ICRs. An Agency may not
conduct or sponsor and a person is not required to respond to a
collection of information unless it displays a currently valid OMB
control number.
DATES: Comments must be submitted on or before July 5, 2016.
ADDRESSES: Submit your comments, referencing the Docket ID numbers
provided for each item in the text, online using www.regulations.gov
(our preferred method), by email to docket.oeca@epa.gov, or by mail to:
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW., Washington, DC 20460.
EPA's policy is that all comments received will be included in the
public docket without change including any personal information
provided, unless the comment includes profanity, threats, information
claimed to be Confidential Business Information (CBI) or other
information whose disclosure is restricted by statute.
FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring,
Assistance, and Media Programs Division, Office of Compliance, Mail
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave.
NW., Washington, DC 20460; telephone number: (202) 564-2970; fax
number: (202) 564-0050; email address: yellin.patrick@epa.gov.
[[Page 26547]]
SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail
the information that the EPA will be collecting are available in the
public docket for this ICR. The docket can be viewed online at
www.regulations.gov or in person at the EPA Docket Center, EPA West,
Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone
number for the Docket Center is 202-566-1744. For additional
information about EPA's public docket, visit https://www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of the PRA, EPA is soliciting
comments and information to enable it to: (i) Evaluate whether the
proposed collection of information is necessary for the proper
performance of the functions of the Agency, including whether the
information will have practical utility; (ii) evaluate the accuracy of
the Agency's estimate of the burden of the proposed collection of
information, including the validity of the methodology and assumptions
used; (iii) enhance the quality, utility, and clarity of the
information to be collected; and (iv) minimize the burden of the
collection of information on those who are to respond, including
through the use of appropriate automated electronic, mechanical, or
other technological collection techniques or other forms of information
technology, e.g., permitting electronic submission of responses. Burden
is defined at 5 CFR 1320.03(b). EPA will consider the comments received
and amend the ICR as appropriate. The final ICR package will then be
submitted to OMB for review and approval. At that time, EPA will issue
another Federal Register notice to announce the submission of the ICR
to OMB and the opportunity to submit additional comments to OMB.
General Abstract: For all the listed ICRs in this notice, owners
and operators of affected facilities are required to comply with
reporting and record keeping requirements for the general provisions of
40 CFR part 60, subpart A or Part 63, Subpart A, as well as the
applicable specific standards. This includes submitting initial
notifications, performance tests and periodic reports and results, and
maintaining records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility, or
any period during which the monitoring system is inoperative. These
reports are used by EPA to determine compliance with the standards.
(1) Docket ID Number: EPA-HQ-OECA-2013-0336; Title: NESHAP for Off-
Site Waste and Recovery Operations (40 CFR part 63, subpart DD); EPA
ICR Number 1717.10, OMB Control Number 2060-0313; Expiration Date:
October 31, 2016.
Respondents: Waste management and recovery facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart DD).
Estimated number of respondents: 236 (total).
Frequency of response: Initially, occasionally and semiannually.
Estimated annual burden: 179,000 hours.
Estimated annual cost: $17,500,000, includes $5,810 annualized
capital or operation & maintenance (O&M) costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(2) Docket ID Number: EPA-HQ-OECA-2012-0679; Title: NESHAP for
Petroleum Refineries: Catalytic Cracking Units, Reforming and Sulfur
Units (40 CFR part 63, subpart UUU); EPA ICR Number 1844.07, OMB
Control Number 2060-0554; Expiration Date: October 31, 2016.
Respondents: Petroleum refineries with catalytic cracking units,
catalytic reforming units and/or sulfur recovery units.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart UUU).
Estimated number of respondents: 123 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 10,200 hours.
Estimated annual cost: $9,400,000, includes $8,400,000 annualized
capital or O&M costs.
Changes in Estimates: There is an expected increase in burden hours
due to expected modification of existing facilities.
(3) Docket ID Number: EPA-HQ-OECA-2013-0338; Title: NESHAP for the
Manufacture of Amino/Phenolic Resins (40 CFR part 63, subpart OOO); EPA
ICR Number 1869.08, OMB Control Number 2060-0434; Expiration Date:
October 31, 2016.
Respondents: Facilities that manufacture amino/phenolic resins.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart OOO).
Estimated number of respondents: 37 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 22,400 hours.
Estimated annual cost: $2,200,000, includes $14,800 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(4) Docket ID Number: EPA-HQ-OECA-2013-0341; Title: NESHAP for
Plywood and Composite Products (40 CFR parts 63, Subpart DDDD); EPA ICR
Number 1984.06, OMB Control Number 2060-0552; Expiration Date: October
31, 2016.
Respondents: Plywood and composite wood products (PCWP) facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart DDDD).
Estimated number of respondents: 228 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 11,700 hours.
Estimated annual cost: $1,160,000, includes $16,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(5) Docket ID Number: EPA-HQ-OECA-2013-0318; Title: NSPS for
Magnetic Tape Coating Facilities (40 CFR part 60, subpart SSS); EPA ICR
Number 1135.12, OMB Control Number 2060-0171; Expiration Date: November
30, 2016.
Respondents: Magnetic tape coating facilities constructed or
modified after January 22, 1986.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart SSS).
Estimated number of respondents: 6 (total).
Frequency of response: Initially, occasionally and semiannually.
Estimated annual burden: 2,020 hours.
Estimated annual cost: $283,000, includes $86,400 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(6) Docket ID Number: EPA-HQ-OECA-2013-0334; Title: NSPS for
Secondary Brass and Bronze Production, Primary Copper Smelters, Primary
Zinc Smelters, Primary Lead Smelters, Primary Aluminum Reduction
Plants, and Ferroalloy Production Facilities (40 CFR part 60, subparts
M, P, Q, R, S, Z); EPA ICR Number 1604.11, OMB Control Number 2060-
0110; Expiration Date: November 30, 2016.
Respondents: Secondary brass or bronze production facilities;
primary
[[Page 26548]]
copper, primary zinc, and primary lead facilities; primary aluminum
reduction facilities; and ferroalloy production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts M, P, Q, R, S, and Z).
Estimated number of respondents: 19 (total).
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 4,960 hours.
Estimated annual cost: $612,000 includes $127,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(7) Docket ID Number: EPA-HQ-OECA-2013-0339; Title: NESHAP for Boat
Manufacturing (40 CFR part 63, subpart VVVV); EPA ICR Number 1966.06,
OMB Control Number 2060-0546; Expiration Date: November 30, 2016.
Respondents: Boat manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart VVVV);
Estimated number of respondents: 144 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 23,500 hours.
Estimated annual cost: $2,300,000, includes $800 annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(8) Docket ID Number: EPA-HQ-OECA-2013-0345; Title: NESHAP for
Metal Can Manufacturing Surface Coating (40 CFR part 63, subpart KKKK);
EPA ICR Number 2079.06, OMB Control Number 2060-0541; Expiration Date:
November 30, 2016.
Respondents: Metal can manufacturing facilities that use 1,500
gallons or more of surface coatings.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart KKKK).
Estimated number of respondents: 5 (total).
Frequency of response: Initially, occasionally and semiannually.
Estimated annual burden: 1,940 hours.
Estimated annual cost: $196,000, includes $6,000 annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(9) Docket ID Number: EPA-HQ-OECA-2013-0313; Title: NSPS for
Stationary Gas Turbines (40 CFR part 60, subpart GG); EPA ICR Number
1071.12, OMB Control Number 2060-0028; Expiration Date: December 31,
2016.
Respondents: Stationary gas turbines.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart GG).
Estimated number of respondents: 535 (total).
Frequency of response: Initially and semiannually.
Estimated annual burden: 68,400 hours.
Estimated annual cost: $6,700,000, includes $0 annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(10) Docket ID Number: EPA-HQ-OECA-2013-0333; Title: Standards of
Performance for Air Emission Standards for Tanks, Surface Impoundments
and Containers (40 CFR part 264, subpart CC and 40 CFR part 265,
subpart CC); EPA ICR Number 1593.10, OMB Control Number 2060-0318;
Expiration Date: December 31, 2016.
Respondents: Facilities that treat, store, or dispose of hazardous
wastes in tanks, surface impoundments, and containers.
Respondent's obligation to respond: Mandatory (40 CFR part 264,
subpart CC and 40 CFR part 265, subpart CC).
Estimated number of respondents: 6,200 (total).
Frequency of response: Occasionally.
Estimated annual burden: 712,000 hours.
Estimated annual cost: $82,100,000, includes $12,400,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(11) Docket ID Number: EPA-HQ-OECA-2013-0335; Title: NESHAP for
Aerospace Manufacturing and Rework Facilities (40 CFR part 63, subpart
GG); EPA ICR Number 1687.10, OMB Control Number 2060-0314; Expiration
Date: December 31, 2016.
Respondents: Aerospace manufacturing and rework facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart GG).
Estimated number of respondents: 136 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 141,000 hours.
Estimated annual cost: $13,900,000, includes $136,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(12) Docket ID Number: EPA-HQ-OECA-2013-0340; Title: NESHAP for
Stationary Reciprocating Internal Combustion Engines (40 CFR part 63,
subpart ZZZZ); EPA ICR Number 1975.10, OMB Control Number 2060-0548;
Expiration Date: December 31, 2016.
Respondents: Stationary reciprocating internal combustion engines.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart ZZZZ).
Estimated number of respondents: 903,000 (total).
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 3,430,000 hours.
Estimated annual cost: $425,000,000, includes $27,900,000
annualized capital or O&M costs.
Changes in Estimates: There is an expected increase in burden hours
due to an increase in the respondent universe.
(13) Docket ID Number: EPA-HQ-OECA-2013-0346; Title: NESHAP for
Acrylic/Modacrylic Fibers Prod., Carbon Black Prod., Chemical Mfg:
Chromium Compounds, Flexible Polyurethane Foam Production/Fabrication,
Lead Acid Battery Mfg, Wood Preserving (40 CFR part 63, subparts
LLLLLL, MMMMMM, NNNNNN, OOOOOO, PPPPPP, and QQQQQQ); EPA ICR Number
2256.05, OMB Control Number 2060-0598; Expiration Date: December 31,
2016.
Respondents: Acrylic or modacrylic fibers production plants, carbon
black production plants, chemical manufacturing that use chromite ore
as the basic feedstock, flexible polyurethane foam manufacturing or
fabrication facilities, lead acid battery manufacturing facilities, and
wood preserving facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subparts LLLLLL, MMMMMM, NNNNNN, OOOOOO, PPPPPP, and QQQQQQ).
Estimated number of respondents: 956 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 3,220 hours.
Estimated annual cost: $315,000, includes $0 annualized capital or
O&M costs.
[[Page 26549]]
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(14) Docket ID Number: EPA-HQ-OECA-2013-0301; Title: NESHAP for
Beryllium (40 CFR part 61, subpart C); EPA ICR Number 0193.12, OMB
Control Number 2060-0092; Expiration Date: January 31, 2017.
Respondents: Facilities processing beryllium and its derivatives.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart C).
Estimated number of respondents: 33 (total).
Frequency of response: Initially, occasionally, and monthly.
Estimated annual burden: 2,630 hours.
Estimated annual cost: $292,000, includes $35,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(15) Docket ID Number: EPA-HQ-OECA-2013-0310; Title: NSPS for
Sewage Sludge Treatment Plants (40 CFR part 60, subpart O); EPA ICR
Number 1063.13, OMB Control Number 2060-0035; Expiration Date: January
31, 2017.
Respondents: Sewage sludge treatment plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart O).
Estimated number of respondents: 112 (total).
Frequency of response: Initially, occasionally and semiannually.
Estimated annual burden: 12,500.
Estimated annual cost: $5,180,000, includes $3,960,000 annualized
capital or O&M costs.
Changes in Estimates: There is an increase in burden due to
expected construction of new facilities or modifications of existing
facilities.
(16) Docket ID Number: EPA-HQ-OECA-2013-0314; Title: NSPS for
Phosphate Rock Plants (40 CFR part 60, subpart NN); EPA ICR Number
1078.11, OMB Control Number 2060-0111; Expiration Date: January 31,
2017.
Respondents: Phosphate rock facilities that commenced construction
or reconstruction after September 21, 1979.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart NN).
Estimated number of respondents: 14 (total).
Frequency of response: Initially, occasionally and semiannually.
Estimated annual burden: 1,720 hours.
Estimated annual cost: $302,000, includes $133,000 annualized
capital or O&M costs.
Changes in Estimates: There is an expected increase in burden due
to an increase in the number of new or modified sources.
(17) Docket ID Number: EPA-HQ-OECA-2013-0329; Title: NSPS for
Rubber Tire Manufacturing (40 CFR part 60, subpart BBB); EPA ICR Number
1158.12, OMB Control Number 2060-0156; Expiration Date: January 31,
2017.
Respondents: Rubber tire manufacturing plants that commenced
construction or modification after January 20, 1983.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart BBB).
Estimated number of respondents: 41 (total).
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 17,700 hours.
Estimated annual cost: $1,750,000, includes $16,400 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(18) Docket ID Number: EPA-HQ-OECA-2013-0331; Title: NSPS for New
Residential Wood Heaters (40 CFR part 60, subpart AAA); EPA ICR Number
1176.12, OMB Control Number 2060-0161; Expiration Date: January 31,
2017.
Respondents: Manufacturers, retailers, and certification
laboratories of new residential wood heaters.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart AAA).
Estimated number of respondents: 947 (total).
Frequency of response: Initially and occasionally.
Estimated annual burden: 11,700 hours.
Estimated annual cost: $2,890,000, includes $1,740,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(19) Docket ID Number: EPA-HQ-OECA-2013-0342; Title: NESHAP for
Lime Manufacturing (40 CFR part 63, subpart AAAAA); EPA ICR Number
2072.06, OMB Control Number 2060-0544; Expiration Date: January 31,
2017.
Respondents: Lime manufacturing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart AAAAA).
Estimated number of respondents: 65 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 15,400 hours.
Estimated annual cost: $1,820,000, includes $312,000 annualized
capital or O&M costs.
Changes in Estimates: There is an increase in burden hours from the
previous ICR due to an expected increase in the number of respondents.
(20) Docket ID Number: EPA-HQ-OECA-2013-0302; Title: NSPS for
Graphic Arts Industry (40 CFR part 60, subpart QQ); EPA ICR Number
0657.12, OMB Control Number 2060-0105; Expiration Date: February 28,
2017.
Respondents: Graphics arts facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart QQ).
Estimated number of respondents: 20 (total).
Frequency of response: Initially, occasionally and semiannually.
Estimated annual burden: 1,800 hours.
Estimated annual cost: $176,000, includes $0 annualized capital or
O&M costs.
Changes in Estimates: There is an increase in burden hours from the
previous ICR due to an expected increase in respondent universe.
(21) Docket ID Number: EPA-HQ-OECA-2013-0325; Title: NESHAP for
Benzene Emission from Benzene Storage Vessels and Coke-By-Product
Recovery Plants (40 CFR part 61, subparts L and Y); EPA ICR Number
1080.15, OMB Control Number 2060-0185; Expiration Date: March 31, 2017.
Respondents: Owners or operators of benzene storage vessels and
coke by-product recovery plants.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subparts L and Y).
Estimated number of respondents: 21 (total).
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 3,190 hours.
Estimated annual cost: $312,000, includes $0 annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(22) Docket ID Number: EPA-HQ-OECA-2013-0319; Title: NSPS for VOC
Emissions from Petroleum Refinery Wastewater Systems (40 CFR part 60,
subpart QQQ); EPA ICR Number
[[Page 26550]]
1136.12, OMB Control Number 2060-0172; Expiration Date: March 31, 2017.
Respondents: Petroleum refineries with wastewater systems.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart QQQ).
Estimated number of respondents: 135 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 9,240 hours.
Estimated annual cost: $922,000, includes $17,600 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(23) Docket ID Number: EPA-HQ-OECA-2013-0353; Title: NSPS for
Stationary Spark Ignition Internal Combustion Engines (40 CFR part 60,
subpart JJJJ); EPA ICR Number 2227.05, OMB Control Number 2060-0610;
Expiration Date: March 31, 2017.
Respondents: Stationary spark ignition internal combustion engines.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart JJJJ).
Estimated number of respondents: 17,600 (total).
Frequency of response: Initially and annually.
Estimated annual burden: 23,300 hours.
Estimated annual cost: $4,640,000, includes $2,360,000 annualized
capital or O&M costs.
Changes in Estimates: There is an expected increase in burden hours
from the previous ICR due to growth in the respondent universe.
(24) Docket ID Number: EPA-HQ-OECA-2013-0321; Title: NSPS for
Sewage Sludge Incinerators (40 CFR part 60, subpart LLLL); EPA ICR
Number 2369.04, OMB Control Number 2060-0658; Expiration Date: March
31, 2017.
Respondents: New or modified sewage sludge incinerators.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart LLLL).
Estimated number of respondents: 4 (total).
Frequency of response: Initially, occasionally, and annually.
Estimated annual burden: 798 hours.
Estimated annual cost: $448,000, includes $370,000 annualized
capital or O&M costs.
Changes in Estimates: There is an expected increase in burden hours
from the previous ICR due to growth in the respondent universe.
(25) Docket ID Number: EPA-HQ-OECA-2013-0317; Title: NESHAP for
Gold Mine Ore Processing (40 CFR part 63, subpart EEEEEEE); EPA ICR
Number 2383.04, OMB Control Number 2060-0659; Expiration Date: March
31, 2017.
Respondents: Gold mine ore processing and production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart EEEEEEE).
Estimated number of respondents: 21 (total).
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 2,360 hours.
Estimated annual cost: $445,000, includes $227,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(26) Docket ID Number: EPA-HQ-OECA-2016-0009; Title: NESHAP for
Group IV Polymers and Resins (40 CFR part 63, subpart JJJ); EPA ICR
Number 2457.03, OMB Control Number 2060-0682; Expiration Date: March
31, 2017.
Respondents: Thermoplastic resin production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart JJJ).
Estimated number of respondents: 31 (total).
Frequency of response: Semiannually.
Estimated annual burden: 459 hours.
Estimated annual cost: $1,110,000, includes $542,000 annualized
capital or O&M costs.
(27) Docket ID Number: EPA-HQ-OECA-2014-0063; Title: NESHAP for
Polyether Polyols Production (40 CFR part 63, subpart PPP); EPA ICR
Number 1811.10, OMB Control Number 2060-0415; Expiration Date: May 31,
2017.
Respondents: Polyether polyols production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart PPP).
Estimated number of respondents: 23 (total).
Frequency of response: Occasionally and semiannually.
Estimated annual burden: 3,700 hours.
Estimated annual cost: $433,000, includes $226,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(28) Docket ID Number: EPA-HQ-OECA-2013-0303; Title: NSPS for
Equipment Leaks of VOC in Petroleum Refineries (40 CFR part 60,
subparts GGG and GGGa); EPA ICR Number 0983.15, OMB Control Number
2060-0067; Expiration Date: June 30, 2017.
Respondents: Petroleum refineries.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts GGG and GGGa).
Estimated number of respondents: 130 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 24,900 hours.
Estimated annual cost: $2,430,000, includes $0 annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
(29) Docket ID Number: EPA-HQ-OECA-2013-0350; Title: The
Consolidated Air Rule (CAR) for the Synthetic Organic Chemical
Manufacturing Industry (SOCMI); EPA ICR Number 1854.10, OMB Control
Number 2060-0443; Expiration Date: June 30, 2017.
Respondents: Synthetic organic chemical manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 65).
Estimated number of respondents: 4,620 (total).
Frequency of response: Initially, occasionally, semiannually and
annually.
Estimated annual burden: 2,130,000 hours.
Estimated annual cost: $309,000,000, includes $101,000,000
annualized capital or O&M costs.
Changes in Estimates: There is an expected increase in burden hours
from the previous ICR due to growth in the respondent universe.
(30) Docket ID Number: EPA-HQ-OECA-2013-0315; Title: NSPS for
Commercial and Industrial Solid Waste Incineration (CISWI) Units (40
CFR part 60, subpart CCCC); EPA ICR Number 2384.04, OMB Control Number
2060-0662; Expiration Date: June 30, 2017.
Respondents: Commercial and industrial solid waste incineration
units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart CCCC).
Estimated number of respondents: 4 (total).
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 1,040 hours.
Estimated annual cost: $451,000, includes $350,000 annualized
capital or O&M costs.
Changes in Estimates: There is an expected increase in burden hours
from the previous ICR due to growth in the respondent universe.
[[Page 26551]]
(31) Docket ID Number: EPA-HQ-OECA-2014-0034; Title: NSPS for Kraft
Pulp Mills (40 CFR part 60, subpart BB); EPA ICR Number 2485.03, OMB
Control Number 2060-0690; Expiration Date: June 30, 2017.
Respondents: Kraft pulp mills.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart BB).
Estimated number of respondents: 4 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 1,910 hours.
Estimated annual cost: $753,000, includes $567,000 annualized
capital or O&M costs.
Changes in Estimates: There is an expected increase in burden hours
from the previous ICR due to growth in the respondent universe.
(32) Docket ID Number: EPA-HQ-OECA-2013-0316; Title: NSPS for
Onshore Natural Gas Processing Plants (40 CFR part 60, subparts KKK and
LLL); EPA ICR Number 1086.12, OMB Control Number 2060-0120; Expiration
Date: August 31, 2017.
Respondents: Onshore natural gas processing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts KKK and LLL).
Estimated number of respondents: 577 (total).
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 122,000 hours.
Estimated annual cost: $12,000,000, includes $68,400 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden hours from the
previous ICR.
Dated: April 18, 2016.
Edward J. Messina,
Director, Monitoring, Assistance and Media Programs Division.
[FR Doc. 2016-10393 Filed 5-2-16; 8:45 am]
BILLING CODE 6560-50-P