Kenai Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 26223-26224 [2016-10098]
Download as PDF
Federal Register / Vol. 81, No. 84 / Monday, May 2, 2016 / Notices
srobinson on DSK5SPTVN1PROD with NOTICES
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 11,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 21, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–10156 Filed 4–29–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:30 Apr 29, 2016
Jkt 238001
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–1467–000]
Palmco Power VA LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Palmco
Power VA LLC‘s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 11,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
26223
Dated: April 21, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–10139 Filed 4–29–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13212–005]
Kenai Hydro, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Application
for Original License for Major Project—
Unconstructed.
b. Project No.: P–13212–005.
c. Date filed: April 18, 2016.
d. Applicant: Kenia Hydro, LLC.
e. Name of Project: Grant Lake
Hydroelectric Project.
f. Location: On Grant Creek, near the
Town of Moose Pass, Kenai Peninsula
Borough, Alaska. The proposed project
would occupy 1,741.3 acres of federal
land within the Chugach National
Forest managed by the U.S. Forest
Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mikel Salzetti,
Manager of Fuel Supply & Renewable
Energy Development, 280 Airport Way,
Kenai, AK 99611. (907) 283–2375.
i. FERC Contact: Kenneth Hogan,
(202) 502–8434; Kenneth.Hogan@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
E:\FR\FM\02MYN1.SGM
02MYN1
srobinson on DSK5SPTVN1PROD with NOTICES
26224
Federal Register / Vol. 81, No. 84 / Monday, May 2, 2016 / Notices
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: June 17, 2016.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–13212–005.
m. The application is not ready for
environmental analysis at this time.
n. The proposed Grant Lake
Hydroelectric Project would consists of:
(1) An intake structure within Grant
Lake; (2) a 3,300-foot-long water
conveyance; (3) a 72-inch-diameter, 150feet-long, welded steel penstock; (4) a
power house containing two 2.5
megawatt Francis turbine/generator
units; (5) a 95-foot-long open channel
tailrace; (6) a 3.6-acre tailrace detention
pond; (6) a 1.1-mile-long, 115-kilovolt
transmission line; and (7) appurtenant
facilities. The project is estimated to
generate an average of 18,600 megawatt
hours (MWh) annually.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
q. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
VerDate Sep<11>2014
22:33 Apr 29, 2016
Jkt 238001
Issue Notice of Acceptance or
Deficiency Letter *—June 2016
Request Additional Information (if
needed) *—June 2016
Issue Scoping Document 1 for
comments—July 2016
Scoping Meeting (if needed)—August
2016
Comments on Scoping Document 1—
September 2016
Issue Scoping Document 2—November
2016
Issue notice of ready for environmental
analysis—November 2016
Request Additional Information (if
needed) *—November 2016
Comments, recommendations, terms
and conditions, and prescriptions—
January 2017
Reply Comments—March 2017
Notice of the availability of the draft
NEPA document—June 2017
Comments on the draft NEPA
document—July 2017
Initiate 10(j) process—July 2017
Notice of the availability of the final
NEPA document—November 2017
* A deficiency letter and/or the need
for additional information would result
in subsequent delays to the processing
schedule.
Dated: April 25, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–10098 Filed 4–29–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–1468–000]
Palmco Power RI LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Palmco
Power RI LLC‘s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 11,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 21, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–10140 Filed 4–29–16; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2016–0022; FRL–9945–54]
Certain New Chemicals; Receipt and
Status Information for March 2016
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA is required under the
Toxic Substances Control Act (TSCA) to
publish in the Federal Register a notice
of receipt of a premanufacture notice
(PMN); an application for a test
marketing exemption (TME), both
pending and/or expired; and a periodic
status report on any new chemicals
SUMMARY:
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 81, Number 84 (Monday, May 2, 2016)]
[Notices]
[Pages 26223-26224]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-10098]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13212-005]
Kenai Hydro, LLC; Notice of Application Tendered for Filing With
the Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Application for Original License for Major
Project--Unconstructed.
b. Project No.: P-13212-005.
c. Date filed: April 18, 2016.
d. Applicant: Kenia Hydro, LLC.
e. Name of Project: Grant Lake Hydroelectric Project.
f. Location: On Grant Creek, near the Town of Moose Pass, Kenai
Peninsula Borough, Alaska. The proposed project would occupy 1,741.3
acres of federal land within the Chugach National Forest managed by the
U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mikel Salzetti, Manager of Fuel Supply &
Renewable Energy Development, 280 Airport Way, Kenai, AK 99611. (907)
283-2375.
i. FERC Contact: Kenneth Hogan, (202) 502-8434;
Kenneth.Hogan@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in
[[Page 26224]]
order to form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: June 17, 2016.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-13212-005.
m. The application is not ready for environmental analysis at this
time.
n. The proposed Grant Lake Hydroelectric Project would consists of:
(1) An intake structure within Grant Lake; (2) a 3,300-foot-long water
conveyance; (3) a 72-inch-diameter, 150-feet-long, welded steel
penstock; (4) a power house containing two 2.5 megawatt Francis
turbine/generator units; (5) a 95-foot-long open channel tailrace; (6)
a 3.6-acre tailrace detention pond; (6) a 1.1-mile-long, 115-kilovolt
transmission line; and (7) appurtenant facilities. The project is
estimated to generate an average of 18,600 megawatt hours (MWh)
annually.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
q. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance or Deficiency Letter *--June 2016
Request Additional Information (if needed) *--June 2016
Issue Scoping Document 1 for comments--July 2016
Scoping Meeting (if needed)--August 2016
Comments on Scoping Document 1--September 2016
Issue Scoping Document 2--November 2016
Issue notice of ready for environmental analysis--November 2016
Request Additional Information (if needed) *--November 2016
Comments, recommendations, terms and conditions, and prescriptions--
January 2017
Reply Comments--March 2017
Notice of the availability of the draft NEPA document--June 2017
Comments on the draft NEPA document--July 2017
Initiate 10(j) process--July 2017
Notice of the availability of the final NEPA document--November 2017
* A deficiency letter and/or the need for additional information
would result in subsequent delays to the processing schedule.
Dated: April 25, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-10098 Filed 4-29-16; 8:45 am]